Seven Star Icon, Baramati
See the site from above todayBaramati, Baramati, Pune district · 413133
- Possession
- Apr 2031
- completion filed with MahaRERA
- Booked
- 136 of 441
As of 13 Nov 2026, Seven Star Icon in Baramati, Pune district is registered with MahaRERA as P52100079042. The completion date filed with MahaRERA is 30 Apr 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). MahaRERA shows 136 of 441 homes booked. That is 31% booked, against 18% for the middle of 61 Baramati projects registered within a year of it.
Updated 21 Nov 2026
Our team is still collecting details on Seven Star Icon.
We do not have prices, the builder's pictures and floor plans yet. What you see here is what we have now: MahaRERA's record, read on the date shown. Ask us and we send you what we find first.
Seven Star Icon from above, today
Seven Star Icon, year by year, up close
Sharp satellite pictures taken in Jan 2024, Apr 2025 and Feb 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.
Jan 2024 Apr 2025 Feb 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Apr–May 2026 (looked Nov 2026)
Ground cleared
possession filed for Apr 2031
SEVEN STAR ICON shows vacant vegetated land initially, followed by ground clearing and the appearance of building footprints and shadows after the January 2025 MahaRERA registration.
The seasons before
- Jan–Mar 2026Structures and shadows visible clearly within the ring; little change.
- Oct–Dec 2025Building footprints visible with shadows in the ring; little change.
- Apr–May 2025Groundworks and structural footprints remain visible; little change since last season.
Construction proof from space: Jan 2021 to May 2026, Copernicus Sentinel-2 (13 earlier seasons)
- Jan–Mar 2025New building footprints and shadows cast by structures appear in the ring.
- Oct–Dec 2024Clearing and early structural footprints visible after Jan 2025 registration.
- Apr–May 2024Dry conditions and bare ground visible; little change from before.
- Jan–Mar 2024Plant cover visible inside the ring; little change observed.
- Oct–Dec 2023Sparse greenery visible in the ring; little change from prior season.
- Apr–May 2023Dry ground conditions visible within the ring; little change.
- Jan–Mar 2023Plant cover persists inside the ring; little change since previous season.
- Oct–Dec 2022Vegetation visible inside the yellow ring; little change noted.
- Apr–May 2022Ground appears dry with sparse vegetation; little change from before.
- Jan–Mar 2022Plant cover remains visible inside the ring; little change observed.
- Oct–Dec 2021Sparse vegetation visible in the ring; little change since prior season.
- Apr–May 2021Dry ground visible in the ring; little change from previous season.
- Jan–Mar 2021Green cover visible in the ring; little change overall.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Nearby
- CollegeVidya Pratishthan's Arts, Science & Commerce College, Baramati0.3 km
- ShoppingSubhadra Mall0.4 km
- ShoppingReliance SMART Superstore0.4 km
- Industrial areaNakshatra Garden0.4 km
- Collegevp college baramati0.7 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
MahaRERA record
From MahaRERA, read 13 Nov 2026Possession date
30 Apr 2031
The completion date filed with MahaRERA is 30 Apr 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2030.
Seven Star Icon: what changed, as we read it
Homes booked went from 138 to 136 between 14 Oct 2026 and 13 Nov 2026 (MahaRERA shows cancellations this way), of 441 homes.
- 13 Nov 2026: 136 booked
- 14 Oct 2026: 138 booked
Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.
Beside other Baramati projects
Worked out by Avasetu- Homes booked
- 31%
- The middle of 61 Baramati projects registered within a year of it: 18%.
- Completion date
- Not moved by the builder
- 11 of 152 Baramati projects being built moved theirs 3 months or more.
From MahaRERA records read 13 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 136 of 441
- Towers
- 3 in this registration
- The tallest has 18 floors.
- Units
- 441
- 201 homes, 240 shops or offices.
- Registered on
- 31 Jan 2025
- MahaRERA registration
- P52100079042
- Listed or updated on MahaRERA 31 Jan 2025.
- Project type
- Others
- Pincode
- 413133
Check before you book
From MahaRERA- Completion is filed for Apr 2031, about 4 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
- 240 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.
Tower by tower
3 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| WING C | 18 | 84 | 81 |
| WING B | 18 | 33 | 62 |
| WING A | 18 | 84 | 97 |
As filed with MahaRERA (sanctioned floors).
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Baramati
FAQ
What is the price of Seven Star Icon?
No price for Seven Star Icon is published yet. Ask through the enquiry form on this page for the current price.
What is the possession date of Seven Star Icon?
The completion date filed with MahaRERA is 30 Apr 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Seven Star Icon?
Seven Star Icon is registered with MahaRERA as P52100079042.
How many towers and floors does Seven Star Icon have?
MahaRERA lists 3 buildings, the tallest with 18 floors.
How many flats are there in Seven Star Icon?
MahaRERA lists 441 units (201 residential, 240 other).
How many homes in Seven Star Icon are booked?
136 of 441 homes were booked as per MahaRERA on 13 Nov 2026.
Where is Seven Star Icon?
Seven Star Icon is in 413133, Baramati, Pune district (pincode 413133).
What is near Seven Star Icon?
Vidya Pratishthan's Arts, Science & Commerce College, Baramati (College), 0.3 km; Subhadra Mall (Shopping), 0.4 km; Reliance SMART Superstore (Shopping), 0.4 km; in a straight line from the map position; the drive is longer.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 31 Jan 2025
- Dates and homes bookedFrom MahaRERA
Checked 21 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 8 Nov 2026
- Location and nearbyGathered and checked
Checked 21 Nov 2026