Shakai from space, 2024 to 2026
Satellite imagery shows the project site transitioning from open land and seasonal vegetation to active ground clearing and initial foundation work following the March 2025 MahaRERA registration, with structural outlines developing over time.
9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Shadows from developing structures indicate vertical work near the ring.
- Apr–May 2026Site work continues with clear ground outlines and active preparation zones.
- Jan–Mar 2026Building footprints become more defined with emerging structural shadows nearby.
- Oct–Dec 2025Initial foundation footprints begin to take shape following recent site clearing.
- Apr–May 2025Exposed soil and site preparation persist clearly inside the yellow ring.
- Jan–Mar 2025Active ground clearing and earth movement appear within the ring area.
- Oct–Dec 2024Work shows after the Mar 2025 registration with ground leveling visible.
- Apr–May 2024Ring shows cleared earth and early ground disturbance ahead of registration.
- Jan–Mar 2024Ground clearing becomes noticeable inside the ring as plant cover decreases.
Shakai: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.