Skip to main contentSkip to navigation
Map: where Shankeshwar Sparsh is
The project's position on the map
MahaRERA registered P52100055256Verify on MahaRERA (opens in a new tab)Mid stage

Shankeshwar Sparsh, Moshi

See the site from above today

by Munisuvrat Properties · Moshi, Haveli, Pune district · 412105

Homes
1 BHK
Price
from ₹34.53 L
EMI about ₹23,973 a month
Possession
Apr 2029
completion filed with MahaRERA
Booked
275 of 474
26 booked in the last 30 days

Avasetu's read (from MahaRERA data, 13 Nov 2026)

The project has 275 of 474 homes booked, which is 58% compared to about 50% across 113 similar Moshi projects. Sales show 26 more homes booked between 14 Oct 2026 and 13 Nov 2026. The completion date filed with MahaRERA is 30 Apr 2029.

What stands out

As of 13 Nov 2026, from MahaRERA and the sources below.

  • 58% of homes booked: Buyers have reserved 275 of the 474 homes. This is slightly ahead of neighborhood demand, where similar projects are at about 50%.
  • With 474 homes across 4 buildings, this project is larger than 253 of 269 active projects in Moshi. The layout places about 237 homes per acre across its 2 acres.
  • The project is scheduled for completion on 30 Apr 2029. MahaRERA's order added the 4 months to the original 31 Dec 2028 registration date, rather than a builder delay.

Updated 22 Nov 2026

Price

  • 1 BHK

    ₹34.53 L – ₹37.79 L

    from 452 sq ft · ₹7,639/sq ft

    Last checked 21 Nov 2026

    All-in cost of the 1 BHK at ₹34.53 L: about ₹37.59 L
    Price (agreement value)₹34.53 L
    GST (1%)₹34,530
    Stamp duty (7%)₹2.42 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹37.59 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹23,973 a monthOn a ₹27.62 L loan (80% of ₹34.53 L) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for Shankeshwar Sparsh

  • 2 BHK about ₹40 – 60 L

Our own rounded guide, checked against the area on 21 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

What new homes in Moshi usually ask

  • 1 BHK about ₹30 – 50 L (10 projects)
  • 2 BHK about ₹45 – 65 L (53 projects)
  • 2.5 BHK about ₹65 – 80 L (4 projects)
  • 3 BHK about ₹65 – 90 L (41 projects)
  • 4 BHK about ₹1.1 – 1.9 Cr (6 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Moshi, rounded. Use it to judge an offer, not as a price.

Moshi average ₹7,638/sq ft across 17 projectsThe middle asking price per sq ft of other projects in Moshi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Shankeshwar Sparsh from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Shankeshwar Sparsh, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Jan 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Shankeshwar Sparsh from above, satellite picture of Nov 2022
    Nov 2022
  2. Shankeshwar Sparsh from above, satellite picture of Jan 2024
    Jan 2024
  3. Shankeshwar Sparsh from above, satellite picture of Jan 2025
    Jan 2025
  4. Shankeshwar Sparsh from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Ongoing building structure development visible inside the ring.

possession filed for Apr 2029

Month by month, Jan 2021 to Nov 2026: 43 clear months, October to May (the monsoon is under cloud).

The site starts as open land and vegetation until ground clearing appears in late 2023. Following the March 2024 MahaRERA registration, new building footprints and structural shadows emerge within the ring through 2026.

The seasons before

  1. Apr–May 2026Construction activity and building footprints visible inside the ring.
  2. Jan–Mar 2026Building footprints and structural shadows visible inside the ring.
  3. Oct–Dec 2025Developing building structures and footprints visible inside the ring.
Construction proof from space: Jan 2021 to Nov 2026, Copernicus Sentinel-2 (14 earlier seasons)
  1. Apr–May 2025Active construction footprints and cleared land visible inside the ring.
  2. Jan–Mar 2025Structure shadows and new building footprints visible inside the ring.
  3. Oct–Dec 2024New building footprints and earthwork visible inside the ring.
  4. Apr–May 2024Cleared ground and initial building footprints visible inside the ring.
  5. Jan–Mar 2024Ground clearing visible inside the ring before the March 2024 registration.
  6. Oct–Dec 2023Vegetation present with early ground clearing visible inside the ring.
  7. Apr–May 2023Dry soil and scattered plants visible inside the ring; little change.
  8. Jan–Mar 2023Sparse vegetation and open ground visible inside the ring; little change.
  9. Oct–Dec 2022Vegetation and open patches visible inside the ring; little change.
  10. Apr–May 2022Dry ground with sparse vegetation visible inside the ring; little change.
  11. Jan–Mar 2022Plant cover and open land visible inside the ring; little change.
  12. Oct–Dec 2021Green vegetation and open land visible inside the ring; little change.
  13. Apr–May 2021Dry ground and sparse vegetation visible inside the ring; little change.
  14. Jan–Mar 2021Vegetation and open land visible inside the ring; little change.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Pune Airport (Lohegaon)11.4 km
  • Baner-Balewadi High Street14.4 km
  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)15.6 km
  • Pune Railway Station15.9 km

Nearby

  • HospitalSainath Hospital2.2 km
  • ShoppingD Mart2.7 km
  • TempleShree Gajanan Maharaj Sansthan2.9 km
  • CollegeMIT Arts, Commerce & Science College3 km
  • ShoppingJai Ganesh Samrajya H-Wing3 km

Straight-line distances; the drive is longer. Places: Google Maps.

MahaRERA record

From MahaRERA, read 13 Nov 2026

Possession date

30 Apr 2029

The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2028.

Shankeshwar Sparsh: what changed, as we read it

26 more homes booked between 14 Oct 2026 and 13 Nov 2026: 249 to 275, of 474 homes.

14 Oct 202613 Nov 2026
  • 13 Nov 2026: 275 booked
  • 14 Oct 2026: 249 booked

Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.

Beside other Moshi projects

Worked out by Avasetu
Homes booked
58%
The middle of 113 Moshi projects registered within a year of it: 50%.
Completion date
Not moved by the builder
62 of 290 Moshi projects being built moved theirs 3 months or more.

From MahaRERA records read 13 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
275 of 474
Towers
4 in this registration
The tallest has 22 floors.
Units
474
436 homes, 38 shops or offices.
Registered on
14 Mar 2024
MahaRERA registration
P52100055256
Listed or updated on MahaRERA 14 Mar 2024.
Promoter (builder)
Munisuvrat Properties
Project type
Others
Pincode
412105

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA and checked sites
  • About 237 homes per acre (474 homes on 2 acres, from two property sites that agree). Towers stand close: ask how far your tower is from the next and which flats face another tower.
  • 38 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

4 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
Building A141270
Building B221910
Building C141180
Shopping Complex2038

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
2 acres

Last checked 21 Nov 2026. MahaRERA counts where they differ.

Munisuvrat Properties: track record

From MahaRERA records

Munisuvrat Properties has 3 projects in our MahaRERA register for Pune.

All 3 projects by Munisuvrat Properties in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Moshi

More by Munisuvrat Properties

FAQ

What is the price of Shankeshwar Sparsh?

1 BHK: ₹34.53 L to ₹37.79 L, checked on 21 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Shankeshwar Sparsh?

The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Shankeshwar Sparsh?

Shankeshwar Sparsh is registered with MahaRERA as P52100055256.

How many towers and floors does Shankeshwar Sparsh have?

MahaRERA lists 4 buildings, the tallest with 22 floors.

How many flats are there in Shankeshwar Sparsh?

MahaRERA lists 474 units (436 residential, 38 other).

How many homes in Shankeshwar Sparsh are booked?

275 of 474 homes were booked as per MahaRERA on 13 Nov 2026.

Who is the builder of Shankeshwar Sparsh?

The promoter registered with MahaRERA is Munisuvrat Properties. Our register has 3 Pune projects by Munisuvrat Properties.

Where is Shankeshwar Sparsh?

Shankeshwar Sparsh is in 412105, Haveli, Pune district (pincode 412105).

Which hospital is nearest to Shankeshwar Sparsh?

Sainath Hospital, about 2.2 km away in a straight line from the map position; the drive is longer.

How far is Shankeshwar Sparsh from Pune Airport?

About 11.4 km in a straight line from the map position; the drive is longer.

How far is Shankeshwar Sparsh from Baner-Balewadi High Street?

About 14.4 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Shankeshwar Sparsh.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 14 Mar 2024

  • Dates and homes bookedFrom MahaRERA

    Checked 21 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 9 Nov 2026

  • Location and nearbyGathered and checked

    Checked 21 Nov 2026

  • DescriptionGathered and checked

    Checked 21 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (21 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (21 Nov 2026)

Get the price sheet and floor plans for Shankeshwar Sparsh

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment