Skip to main contentSkip to navigation

Kolte Patil Springshire from space, 2023 to 2026

The site remained vacant land through early 2024. Following the June 2024 registration for Springshire, ground clearing and new building footprints appeared, with construction activity and shadows visible through 2025 and 2026.

Today, from Google satellite, centred on the same map pin.

12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Established building footprints and shadows visible in the ring.
  2. Apr–May 2026Little change, continuing construction activity within the ring.
  3. Jan–Mar 2026Building footprints and shadows from new structures are visible.
  4. Oct–Dec 2025New structures and shadows indicate building activity in the ring.
  5. Apr–May 2025Little change, active ground work continues inside the ring.
  6. Jan–Mar 2025Ground clearing and early construction footprints appear after registration.
  7. Oct–Dec 2024Work shows after the Jun 2024 registration with new ground activity.
  8. Apr–May 2024Little change ahead of project registration.
  9. Jan–Mar 2024Undeveloped land visible prior to the June 2024 registration.
  10. Oct–Dec 2023Little change, ground conditions remain consistent.
  11. Apr–May 2023Little change, dry ground persists in the ring.
  12. Jan–Mar 2023Vacant plot remains visible with surrounding structures unchanged.

Kolte Patil Springshire: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.