Surabhi City Phase 1 from space, 2023 to 2026
Surabhi City Phase 1 shows initial vegetation and open land through 2023, followed by ground clearing and earthwork starting around the February 2024 registration, with minor structural footprints developing thereafter.
12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Vegetation regrowth and faint building footprints visible near the ring.
- Apr–May 2026Dry ground conditions with minimal change inside the ring.
- Jan–Mar 2026Little change observed with ongoing earthwork and sparse structures.
- Oct–Dec 2025Minor structural footprints and cleared ground visible inside the ring.
- Apr–May 2025Dry exposed soil and excavation marks visible inside the ring.
- Jan–Mar 2025Open excavated ground and minor building footprints visible.
- Oct–Dec 2024Ground preparation and minor structures visible near the ring.
- Apr–May 2024Earthwork and clearing visible inside the ring.
- Jan–Mar 2024Ground clearing and new foundation work visible after the Feb 2024 registration.
- Oct–Dec 2023Slight green cover visible with small structural footprints nearby.
- Apr–May 2023Dry ground conditions with minimal vegetation visible.
- Jan–Mar 2023Dry open land and sparse vegetation inside the ring.
Surabhi City Phase 1: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.