Swanandi Blossom Phase 2 from space, 2023 to 2026

The site remained largely vacant with seasonal vegetation until ground clearing and construction footprints appeared following the July 2024 MahaRERA registrations, leading to prominent building shadows by 2026.

Today, from Google satellite, centred on the same map pin.

12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Site shows established building shadows and active footprints.
  2. Apr–May 2026Ongoing construction activity maintains visible footprints and shadows.
  3. Jan–Mar 2026Tall structure shadows cast north-west across the site.
  4. Oct–Dec 2025New building footprints develop further within the ring.
  5. Apr–May 2025Structure shadows lengthen as construction activity continues.
  6. Jan–Mar 2025Building footprints and shadows emerge inside the ring.
  7. Oct–Dec 2024Work shows after the Jul 2024 registration with new foundations.
  8. Apr–May 2024Ground clearing becomes visible ahead of project registration.
  9. Jan–Mar 2024Ground preparation signs begin near the ring.
  10. Oct–Dec 2023Little change visible across the plot.
  11. Apr–May 2023Dry ground conditions persist with no major alterations.
  12. Jan–Mar 2023Sparse vegetation remains visible inside the ring.

Swanandi Blossom Phase 2: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.