Skip to main contentSkip to navigation
MahaRERA registered P52100025260Verify on MahaRERA (opens in a new tab)

Runwal The Central Park, Chinchwad

Filed on MahaRERA as THE CENTRAL PARK PHASE -I

See the site from above today

by R Retail Ventures Private Limited · Chinchwad, Haveli, Pune district · 411019

Homes
3, 3.5, 4, 4.5 BHK
Price
from ₹1.48 Cr
EMI about ₹1.03 L a month
Possession
from Apr 2027
its parts filed Apr 2027 to Apr 2032
Booked
1,769 of 1,919
16 booked in the last 30 days

What stands out

As of 16 Nov 2026, from MahaRERA and the sources below.

  • This part includes 5 high-rise buildings reaching up to 41 floors, with about 157 homes per building.
  • The completion date is 30 Apr 2027 instead of the initial 30 Dec 2026 because a MahaRERA order added 4 months to the timeline. The builder did not change it.

Updated 22 Nov 2026

Price

  • 3 BHK

    ₹1.48 Cr – ₹2.3 Cr

    from 1,314 sq ft · ₹11,263/sq ft

    Last checked 21 Nov 2026

    All-in cost of the 3 BHK at ₹1.48 Cr: about ₹1.66 Cr
    Price (agreement value)₹1.48 Cr
    GST (5%)₹7.4 L
    Stamp duty (7%)₹10.36 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.66 Cr
  • 3.5 BHK

    ₹2.5 Cr – ₹2.65 Cr

    from 1,550 sq ft · ₹16,129/sq ft

    Last checked 21 Nov 2026

    All-in cost of the 3.5 BHK at ₹2.5 Cr: about ₹2.8 Cr
    Price (agreement value)₹2.5 Cr
    GST (5%)₹12.5 L
    Stamp duty (7%)₹17.5 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹2.8 Cr
  • 4 BHK

    ₹2.65 Cr – ₹3.2 Cr

    from 1,935 sq ft · ₹13,695/sq ft

    Last checked 21 Nov 2026

    All-in cost of the 4 BHK at ₹2.65 Cr: about ₹2.97 Cr
    Price (agreement value)₹2.65 Cr
    GST (5%)₹13.25 L
    Stamp duty (7%)₹18.55 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹2.97 Cr
  • 4.5 BHK

    ₹3.5 Cr – ₹3.65 Cr

    from 2,057 sq ft · ₹17,015/sq ft

    Last checked 21 Nov 2026

    All-in cost of the 4.5 BHK at ₹3.5 Cr: about ₹3.92 Cr
    Price (agreement value)₹3.5 Cr
    GST (5%)₹17.5 L
    Stamp duty (7%)₹24.5 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹3.92 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹1.03 L a monthOn a ₹1.18 Cr loan (80% of ₹1.48 Cr) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for Runwal The Central Park

  • 2 BHK about ₹90 L – ₹1.9 Cr

Our own rounded guide, checked against the area on 21 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Runwal The Central Park from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Runwal The Central Park, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024 and Oct 2025, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Runwal The Central Park from above, satellite picture of Nov 2022
    Nov 2022
  2. Runwal The Central Park from above, satellite picture of Jan 2024
    Jan 2024
  3. Runwal The Central Park from above, satellite picture of Oct 2025
    Oct 2025 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Jan–Mar 2026 (looked Nov 2026)

Work shows after recent phase registrations with increased activity around the ring.

Registered with MahaRERA Mar 2020 · possession filed for from Apr 2027

Season by season, Jan 2021 to Oct 2026: 17 seasons, October to May (the monsoon is under cloud).

From the first picture to the last, the site evolves from cleared ground with sparse vegetation into an active construction zone, featuring changing soil patterns, varying plant cover, and the appearance of a nearby water body.

The seasons before

  1. Jan–Mar 2025Water body remains visible to the southwest of the ring.
  2. Oct–Dec 2024New dark water body appears just outside the ring to the southwest.
  3. Jan–Mar 2023Ground appearance remains largely unchanged with minimal vegetation.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (3 earlier seasons)
  1. Jan–Mar 2022Plant cover decreases as bare soil expands within the ring area.
  2. Oct–Dec 2021Work shows after the Aug 2021 registration with disturbed soil inside the ring.
  3. Jan–Mar 2021Ground is cleared with sparse vegetation and small structures near the ring.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Baner-Balewadi High Street7.6 km
  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)7.9 km
  • Pune Airport (Lohegaon)13.3 km
  • Pune Railway Station14.3 km

Nearby

  • Railway stationChinchwad Junction0.8 km
  • SchoolElpro International School1.2 km
  • Railway stationPimpri1.4 km
  • ShoppingElpro City Square Mall1.5 km
  • Bus standChafekar Chowk1.8 km

Straight-line distances; the drive is longer. Places: Google Maps.

MahaRERA record

From MahaRERA, read 16 Nov 2026

Possession date

30 Apr 2027 to 15 Apr 2032

The completion dates filed with MahaRERA for its 5 registrations; each is in the table of towers and phases below.

For P52100025260: 30 Apr 2027. The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Dec 2026.

The record

Homes booked
1,769 of 1,919
Across all 5 of its MahaRERA registrations. P52100025260 alone: 781 of 785.
Towers
5 in this registration
The tallest has 41 floors. 14 in the whole project.
Registered on
27 Mar 2020
Main MahaRERA registration
P52100025260
Listed or updated on MahaRERA 31 Aug 2021.
Promoter (builder)
R Retail Ventures Private Limited
Project type
Residential / Group Housing
Pincode
411019

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Towers go up to 41 floors. Ask how many lifts serve your tower and how many homes share them.

Tower by tower

5 registrations, 5 buildings

Towers and phases (5 registrations)

From MahaRERA

MahaRERA holds Runwal The Central Park as 5 registrations. Together they list 1,919 homes, 1,769 booked.

RegistrationCompletion filedBooked
THE CENTRAL PARK PHASE -IP52100025260 (opens in a new tab)30 Apr 2027at registration 30 Dec 2026781 of 785
THE CENTRAL PARK PHASE - IIP52100030291 (opens in a new tab)30 Oct 2027at registration 30 Jun 2027695 of 703
THE CENTRAL PARK PHASE - IIIP52100032101 (opens in a new tab)30 Oct 2027at registration 30 Jun 2027153 of 161
The Central Park Phase- IV Tower D3PR1260002503069 (opens in a new tab)30 Sep 2031at registration 31 May 2031106 of 148
The Central Park Phase - IV Tower D4PR1260002502733 (opens in a new tab)15 Apr 2032at registration 15 Dec 203134 of 122

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
C1411420
C2411790
C3411410
B1411780
B2411450

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
26 acres

Last checked 21 Nov 2026. MahaRERA counts where they differ.

R Retail Ventures Private Limited: track record

From MahaRERA records

R Retail Ventures Private Limited has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Chinchwad

FAQ

What is the price of Runwal The Central Park?

3 BHK: ₹1.48 Cr to ₹2.3 Cr; 3.5 BHK: ₹2.5 Cr to ₹2.65 Cr; 4 BHK: ₹2.65 Cr to ₹3.2 Cr; 4.5 BHK: ₹3.5 Cr to ₹3.65 Cr, checked on 21 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Runwal The Central Park?

The 5 MahaRERA registrations of Runwal The Central Park have filed completion dates from 30 Apr 2027 to 15 Apr 2032. For P52100025260: The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Runwal The Central Park?

Runwal The Central Park is registered with MahaRERA in 5 parts (towers or phases): P52100025260, P52100030291, P52100032101, PR1260002503069, PR1260002502733.

How many towers and floors does Runwal The Central Park have?

MahaRERA lists 5 buildings in registration P52100025260, one of the project's 5, the tallest with 41 floors.

How many flats are there in Runwal The Central Park?

MahaRERA lists 1919 units across all 5 of its MahaRERA registrations; P52100025260 has 785.

How many homes in Runwal The Central Park are booked?

1769 of 1919 homes were booked as per MahaRERA on 16 Nov 2026, across all 5 of its MahaRERA registrations.

Who is the builder of Runwal The Central Park?

The promoter registered with MahaRERA is R Retail Ventures Private Limited.

Where is Runwal The Central Park?

Runwal The Central Park is in Haveli, Pune district (pincode 411019).

Which school is nearest to Runwal The Central Park?

Elpro International School, about 1.2 km away in a straight line from the map position; the drive is longer.

Which railway station is nearest to Runwal The Central Park?

Chinchwad Junction, about 0.8 km away in a straight line from the map position; the drive is longer.

How far is Runwal The Central Park from Pune Airport?

About 13.3 km in a straight line from the map position; the drive is longer.

How far is Runwal The Central Park from Baner-Balewadi High Street?

About 7.6 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Runwal The Central Park.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 31 Aug 2021

  • Dates and homes bookedFrom MahaRERA

    Checked 21 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 21 Nov 2026

  • Location and nearbyGathered and checked

    Checked 21 Nov 2026

  • DescriptionGathered and checked

    Checked 21 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (21 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (21 Nov 2026)

Get the price sheet and floor plans for THE CENTRAL PARK PHASE -I

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment