Skip to main contentSkip to navigation
Map: where The Silver Altair is
The project's position on the map
MahaRERA registered P52100035075Verify on MahaRERA (opens in a new tab)

The Silver Altair, Ravet

Filed on MahaRERA as THE SILVER ALTAIR TOWER-C

by Silver Star Group · Ravet, Haveli, Pune district · 412101

Homes
2 BHK
Price
from ₹92.35 L
EMI about ₹64,115 a month
Possession
from Jul 2027
its parts filed Jul 2027 to Apr 2029
Booked
53 of 266
across 1 of its 2 MahaRERA registrations

What stands out

As of 15 Nov 2026, from MahaRERA and the sources below.

  • 3 towers of 20 floors: The project features three buildings that reach up to 20 floors high. This height is a defining characteristic of the development on its 3.5 acre site.
  • Completion date 31 Jul 2027: The builder originally filed for a March 2027 completion. MahaRERA's order added the 4 months that account for the current July 2027 deadline.
  • 2 BHK from 881 sq ft: The starting size for a two bedroom home is 881 square feet of carpet area. These units are priced beginning at 92 lakh rupees.

Updated 21 Nov 2026

Price

  • 2 BHK

    ₹92.35 L – ₹99.5 L

    from 881 sq ft · ₹10,482/sq ft

    Last checked 5 Nov 2026

    All-in cost of the 2 BHK at ₹92.35 L: about ₹1.04 Cr
    Price (agreement value)₹92.35 L
    GST (5%)₹4.62 L
    Stamp duty (7%)₹6.46 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.04 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹64,115 a monthOn a ₹73.88 L loan (80% of ₹92.35 L) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for The Silver Altair

  • 3 BHK about ₹1.4 – 1.6 Cr
  • 4 BHK about ₹1.9 – 2.2 Cr

Our own rounded guide, checked against the area on 5 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

What new homes in Ravet usually ask

  • 2 BHK about ₹60 – 85 L (46 projects)
  • 2.5 BHK about ₹90 L – ₹1.1 Cr (3 projects)
  • 3 BHK about ₹85 L – ₹1.2 Cr (50 projects)
  • 4 BHK about ₹1.5 – 2 Cr (7 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Ravet, rounded. Use it to judge an offer, not as a price.

Ravet average ₹9,809/sq ft across 29 projectsThe middle asking price per sq ft of other projects in Ravet.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

The Silver Altair, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. The Silver Altair from above, satellite picture of Nov 2022
    Nov 2022
  2. The Silver Altair from above, satellite picture of Jan 2024
    Jan 2024
  3. The Silver Altair from above, satellite picture of Feb 2025
    Feb 2025
  4. The Silver Altair from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)6 km
  • Baner-Balewadi High Street9.1 km
  • Pune Railway Station19.1 km
  • Pune Airport (Lohegaon)19.1 km

Nearby

  • SchoolS.B. Patil Public School (SBPPS) Ravet, Pune1 km
  • ShoppingD Mart Ravet1.6 km
  • TempleISKCON (Shree Govinda Dham) Ravet1.7 km
  • CollegeD.Y. Patil College of Engineering1.8 km
  • CollegeD. Y. Patil International University1.9 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 15 Nov 2026

Possession date

31 Jul 2027 to 30 Apr 2029

The completion dates filed with MahaRERA for its 2 registrations; each is in the table of towers and phases below.

For P52100035075: 31 Jul 2027. The completion date filed with MahaRERA is 31 Jul 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Mar 2027.

The record

Homes booked
53 of 266
Across 1 of its 2 MahaRERA registrations.
Towers
1 in this registration
The tallest has 21 floors. 3 in the whole project.
Registered on
4 May 2022
Main MahaRERA registration
P52100035075
Listed or updated on MahaRERA 4 May 2022.
Promoter (builder)
Silver Star Group
Project type
Residential / Group Housing
Pincode
412101

Open the MahaRERA record (opens in a new tab)

Tower by tower

2 registrations, 1 building

Towers and phases (2 registrations)

From MahaRERA

MahaRERA holds The Silver Altair as 2 registrations. Together they list 266 homes, 53 booked.

RegistrationCompletion filedBooked
THE SILVER ALTAIR TOWER-CP52100035075 (opens in a new tab)31 Jul 2027at registration 31 Mar 2027-
THE SILVER ALTAIRP52100080295 (opens in a new tab)30 Apr 2029at registration 31 Dec 202853 of 266

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloors
TOWER C21

As filed with MahaRERA (sanctioned floors); no unit count is filed per building.

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 20 floors

Last checked 5 Nov 2026. MahaRERA counts where they differ.

Silver Star Group: track record

From MahaRERA records

Silver Star Group has 3 projects in our MahaRERA register for Pune.

All 3 projects by Silver Star Group in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Ravet

More by Silver Star Group

FAQ

What is the price of The Silver Altair?

2 BHK: ₹92.35 L to ₹99.5 L, checked on 5 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of The Silver Altair?

The 2 MahaRERA registrations of The Silver Altair have filed completion dates from 31 Jul 2027 to 30 Apr 2029. For P52100035075: The completion date filed with MahaRERA is 31 Jul 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of The Silver Altair?

The Silver Altair is registered with MahaRERA in 2 parts (towers or phases): P52100035075, P52100080295.

How many towers and floors does The Silver Altair have?

MahaRERA lists 1 building in registration P52100035075, one of the project's 2, the tallest with 21 floors.

How many flats are there in The Silver Altair?

MahaRERA lists 266 units across 1 of its 2 MahaRERA registrations.

How many homes in The Silver Altair are booked?

53 of 266 homes were booked as per MahaRERA on 15 Nov 2026, across 1 of its 2 MahaRERA registrations.

Who is the builder of The Silver Altair?

The promoter registered with MahaRERA is Silver Star Group. Our register has 3 Pune projects by Silver Star Group.

Where is The Silver Altair?

The Silver Altair is in Haveli, Pune district (pincode 412101).

Which school is nearest to The Silver Altair?

S.B. Patil Public School (SBPPS) Ravet, Pune, about 1 km away in a straight line from the map position; the drive is longer.

How far is The Silver Altair from Pune Airport?

About 19.1 km in a straight line from the map position; the drive is longer.

How far is The Silver Altair from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 6 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to The Silver Altair.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 4 May 2022

  • Dates and homes bookedFrom MahaRERA

    Checked 5 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 5 Nov 2026

  • Location and nearbyGathered and checked

    Checked 5 Nov 2026

  • DescriptionGathered and checked

    Checked 5 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (5 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (5 Nov 2026)

Get the price sheet and floor plans for THE SILVER ALTAIR TOWER-C

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment