The Spectrum from space, 2024 to 2026

The site remained largely undeveloped land with sparse vegetation until construction activity and building footprints began appearing around the time of the April 2025 MahaRERA registration, leading to tall structures casting shadows in later seasons.

Today, from Google satellite, centred on the same map pin.

9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Little change, site layout remains consistent.
  2. Apr–May 2026Little change, established structures remain visible.
  3. Jan–Mar 2026Little change, construction footprints remain steady.
  4. Oct–Dec 2025Tall structures casting shadows are now visible inside the ring.
  5. Apr–May 2025Work continues with visible building footprints after the April 2025 registration.
  6. Jan–Mar 2025New structures and ground alterations are visible within the ring.
  7. Oct–Dec 2024Early signs of construction activity appear near the ring.
  8. Apr–May 2024Little change, soil remains exposed.
  9. Jan–Mar 2024Minimal vegetation and bare ground inside the ring.

The Spectrum: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.