Skip to main contentSkip to navigation
Map: where Treasure Troves is
The project's position on the map
MahaRERA registered P52100052582Verify on MahaRERA (opens in a new tab)Mid stage

Treasure Troves, Hinjawadi

Sold as Wakad by 9 property sites; we list it under Hinjawadi (pincode 411057).

See the site from above today

by Realcon Homes LLP · Hinjawadi, Mulshi, Pune district · 411057

Homes
2 BHK
Price
from ₹82.68 L
EMI about ₹57,401 a month
Possession
Apr 2031
completion filed with MahaRERA
Booked
378 of 490
18 booked in the last 30 days

Avasetu's read (from MahaRERA data, 19 Nov 2026)

The project has 378 of 490 homes booked, which is 77% compared to about 60% across 59 similar Hinjawadi projects. Another 18 homes were booked between 20 Oct 2026 and 19 Nov 2026. The completion date filed with MahaRERA is 30 Apr 2031.

What stands out

As of 19 Nov 2026, from MahaRERA and the sources below.

  • 77% of homes booked: Buyers have already taken 378 of the 490 flats here. Similar projects are at about 60% booked.
  • This phase contains 490 flats across 3 buildings. It has more homes than 120 of 143 ongoing projects in Hinjawadi.
  • This registration covers 3 buildings, but the full development planned has 5 towers. Check which specific section you are purchasing.

Updated 21 Nov 2026

Price

  • 2 BHK

    From ₹82.68 L

    Last checked 23 Nov 2026

    All-in cost of the 2 BHK at ₹82.68 L: about ₹92.9 L
    Price (agreement value)₹82.68 L
    GST (5%)₹4.13 L
    Stamp duty (7%)₹5.79 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹92.9 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹57,401 a monthOn a ₹66.14 L loan (80% of ₹82.68 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Hinjawadi usually ask

  • 1 BHK about ₹70 – 85 L (4 projects)
  • 2 BHK about ₹75 L – ₹1.1 Cr (44 projects)
  • 2.5 BHK about ₹85 L – ₹1.4 Cr (4 projects)
  • 3 BHK about ₹1 – 1.6 Cr (44 projects)
  • 3.5 BHK about ₹1.6 – 2.1 Cr (6 projects)
  • 4 BHK about ₹1.9 – 2.7 Cr (14 projects)
  • 4.5 BHK about ₹1.8 – 2.2 Cr (5 projects)
  • 5 BHK about ₹2.1 – 2.7 Cr (4 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Hinjawadi, rounded. Use it to judge an offer, not as a price.

Hinjawadi average ₹11,462/sq ft across 21 projectsThe middle asking price per sq ft of other projects in Hinjawadi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Treasure Troves from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Treasure Troves, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Treasure Troves from above, satellite picture of Nov 2022
    Nov 2022
  2. Treasure Troves from above, satellite picture of Jan 2024
    Jan 2024
  3. Treasure Troves from above, satellite picture of Feb 2025
    Feb 2025
  4. Treasure Troves from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2023 (looked Nov 2026)

Work shows after the Sep 2023 registration.

Registered with MahaRERA Sep 2023 · possession filed for Apr 2031

Season by season, Jan 2022 to Oct 2026: 15 seasons, October to May (the monsoon is under cloud).

The site transitions from vegetated land to active clearance and development following the September 2023 MahaRERA registration, with subsequent seasons showing stable ground conditions inside the ring.

The seasons before

  1. Jan–Mar 2023Further reduction of vegetation in the ring.
  2. Jan–Mar 2022Slight reduction in plant cover inside the ring.
Construction proof from space: Jan 2022 to Oct 2026, Copernicus Sentinel-2

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)1.7 km
  • Baner-Balewadi High Street5 km
  • Pune Railway Station16 km
  • Pune Airport (Lohegaon)17.5 km

Nearby

  • SchoolAkshara International School & Junior College0.4 km
  • TempleShani Mandir0.6 km
  • CollegeIndira College of Commerce & Science (ICCS)0.7 km
  • ShoppingPhoenix Mall of the Millennium1.3 km
  • Bus standWakad Chowk2.2 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Project facts

  • The land parcel spans 3.5 acres.

Last checked 20 Nov 2026.

MahaRERA record

From MahaRERA, read 19 Nov 2026

Possession date

30 Apr 2031

The completion date filed with MahaRERA is 30 Apr 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2030.

Treasure Troves: what changed, as we read it

18 more homes booked between 20 Oct 2026 and 19 Nov 2026: 360 to 378, of 490 homes.

20 Oct 202619 Nov 2026
  • 19 Nov 2026: 378 booked
  • 20 Oct 2026: 360 booked

Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.

Beside other Hinjawadi projects

Worked out by Avasetu
Homes booked
77%
The middle of 58 Hinjawadi projects registered within a year of it: 61%.
Completion date
Not moved by the builder
47 of 150 Hinjawadi projects being built moved theirs 3 months or more.

From MahaRERA records read 19 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
378 of 490
Towers
3 in this registration
The tallest has 26 floors. 5 in the whole project.
Units
490
464 homes, 26 shops or offices.
Registered on
11 Sep 2023
MahaRERA registration
P52100052582
Listed or updated on MahaRERA 24 Sep 2026.
Promoter (builder)
Realcon Homes LLP
Project type
Others
Pincode
411057

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Completion is filed for Apr 2031, about 4 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
  • 26 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
A-BUILDING - AMBER & B-BUILDING - SAPPHIRE2617611
C-BUILDING - EMERALD261126
D-BUILDING - PEARL & E-BUILDING - RUBY261769

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 22 floors
Land
3.37 acres

Last checked 20 Nov 2026. MahaRERA counts where they differ.

Realcon Homes LLP: track record

From MahaRERA records

Realcon Homes LLP has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Hinjawadi

FAQ

What is the price of Treasure Troves?

2 BHK: ₹82.68 L, checked on 23 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Treasure Troves?

The completion date filed with MahaRERA is 30 Apr 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Treasure Troves?

Treasure Troves is registered with MahaRERA as P52100052582.

How many towers and floors does Treasure Troves have?

MahaRERA lists 3 buildings, the tallest with 26 floors.

How many flats are there in Treasure Troves?

MahaRERA lists 490 units (464 residential, 26 other).

How many homes in Treasure Troves are booked?

378 of 490 homes were booked as per MahaRERA on 19 Nov 2026.

Who is the builder of Treasure Troves?

The promoter registered with MahaRERA is Realcon Homes LLP.

Where is Treasure Troves?

Treasure Troves is in 411057, Mulshi, Pune district (pincode 411057).

Which school is nearest to Treasure Troves?

Akshara International School & Junior College, about 0.4 km away in a straight line from the map position; the drive is longer.

How far is Treasure Troves from Pune Airport?

About 17.5 km in a straight line from the map position; the drive is longer.

How far is Treasure Troves from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 1.7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Treasure Troves.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 24 Sep 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 20 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 9 Nov 2026

  • Location and nearbyGathered and checked

    Checked 20 Nov 2026

  • DescriptionGathered and checked

    Checked 20 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (23 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (20 Nov 2026)

Get the price sheet and floor plans for TREASURE TROVES

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment