Paranjape Trident E F from space, 2021 to 2026
Satellite imagery shows development activity beginning after the May 2021 registration of Trident E F, with building footprints and distinct shadows appearing over subsequent years, indicating continuous construction.
18 seasons, Jan 2021 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Little change in the final seasonal view.
- Jan–Mar 2026Little change, structures and shadows remain consistent.
- Oct–Dec 2025Little change observed.
- Jan–Mar 2025Shadow patterns remain stable near the ring.
- Oct–Dec 2024Little change in overall site appearance.
- Apr–May 2024Little change visible.
- Jan–Mar 2024Little change, established shadows persist.
- Oct–Dec 2023Continued shadow presence confirming ongoing vertical development.
- Apr–May 2023Little change in structure boundaries.
- Oct–Dec 2022Dark shadows from growing structures appear to the north.
- Apr–May 2022Little change observed across the site.
- Jan–Mar 2022Structure footprints become clearer inside the ring.
- Oct–Dec 2021Work shows after the May 2021 registration with early footprint changes.
- Apr–May 2021Little change, ground remains largely unchanged.
- Jan–Mar 2021Ring shows existing structures and bare ground before registration.
Paranjape Trident E F: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.