Twin Star Vaastu Imperial, Ravet
Filed on MahaRERA as VAASTU IMPERIAL Wing B
by M/S Twin Star Infrastructure · Ravet, Haveli, Pune district · 412101
- Possession
- from Dec 2024
- its parts filed Dec 2024 to Jun 2027
- Booked
- 193 of 213
- across 2 of its 3 MahaRERA registrations
What stands out
As of 19 Nov 2026, from MahaRERA and the sources below.
- 118 of 125 homes booked: 94% of the 125 units in this registration are already booked, showing strong demand.
- MahaRERA filing adds months: The MahaRERA filing sets the completion date to 30 Jun 2027, extending the earlier 30 Dec 2024 date filed at registration.
Updated 23 Nov 2026
Our team is still collecting details on Twin Star Vaastu Imperial.
We do not have prices, the builder's pictures and floor plans yet. What you see here is what we have now: MahaRERA's record, read on the date shown. Ask us and we send you what we find first.
Price
No price for Twin Star Vaastu Imperial is published yet.
What new homes in Ravet usually ask
- 2 BHK about ₹60 – 85 L (47 projects)
- 2.5 BHK about ₹90 L – ₹1.1 Cr (3 projects)
- 3 BHK about ₹85 L – ₹1.2 Cr (51 projects)
- 4 BHK about ₹1.6 – 2 Cr (8 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Ravet, rounded. Use it to judge an offer, not as a price.
Ravet average ₹9,812/sq ft across 30 projectsThe middle asking price per sq ft of other projects in Ravet.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Flat sizes
- 2 BHK: 700 to 939 sq ft, carpet area
Your agreement for sale states the final carpet area.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Twin Star Vaastu Imperial, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Work hubs
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)6.7 km
- Baner-Balewadi High Street9.9 km
- Pune Airport (Lohegaon)19.8 km
- Pune Railway Station19.9 km
Nearby
- SchoolS.B. Patil Public School (SBPPS) Ravet, Pune1 km
- TempleISKCON (Shree Govinda Dham) Ravet1.9 km
- ShoppingD Mart Ravet2.2 km
- CollegeD.Y. Patil College of Engineering2.4 km
- CollegeD. Y. Patil International University2.5 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
Amenities
- Club House available for residents.
Last checked 22 Nov 2026.
MahaRERA record
From MahaRERA, read 19 Nov 2026Possession date
30 Dec 2024 to 30 Jun 2027
The completion dates filed with MahaRERA for its 3 registrations; each is in the table of towers and phases below.
For P52100007631: 30 Jun 2027. Completion date filed with MahaRERA. At registration: 30 Dec 2024. Moved 26 months later, 4 of them by MahaRERA's August 2026 order for most projects.
Ask for the possession date in writing in your agreement for sale.
The record
- Homes booked
- 193 of 213
- Across 2 of its 3 MahaRERA registrations. P52100007631 alone: 118 of 125. 381 in the whole project.
- Towers
- 1 in this registration
- The tallest has 23 floors.
- Registered on
- 17 Aug 2017
- Main MahaRERA registration
- P52100007631
- Listed or updated on MahaRERA 31 Aug 2026.
- Promoter (builder)
- M/S Twin Star Infrastructure
- Project type
- Residential / Group Housing
- Pincode
- 412101
Check before you book
From MahaRERA and checked sites- The builder has moved the completion date 26 months later since registration, from Dec 2024 to Jun 2027 (MahaRERA's 2026 blanket extension for all projects left out). Ask why, and which date goes in your agreement for sale.
- About 211 homes per acre (213 homes on 1.01 acres, from two property sites that agree). Towers stand close: ask how far your tower is from the next and which flats face another tower.
Tower by tower
3 registrations, 1 building
Towers and phases (3 registrations)
From MahaRERAMahaRERA holds Twin Star Vaastu Imperial as 3 registrations. Together they list 213 homes.
| Registration | Completion filed | Booked |
|---|---|---|
| VAASTU IMPERIAL Wing BP52100007631 (opens in a new tab) | 30 Jun 2027at registration 30 Dec 2024 | 118 of 125 |
| VAASTU IMPERIAL Wing CP52100009507 (opens in a new tab) | 30 Dec 2024 | - |
| VAASTU IMPERIAL Wing AP52100009509 (opens in a new tab) | 30 Jun 2027at registration 30 Dec 2024 | 75 of 88 |
Each row is its own MahaRERA registration, as filed.
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| Wing B | 23 | 125 | 0 |
As filed with MahaRERA (sanctioned floors).
What the builder's and property sites say
Gathered and checked- Floors per tower (highest)
- up to 22 floors
- Land
- 1.01 acres
Last checked 22 Nov 2026. MahaRERA counts where they differ.
M/S Twin Star Infrastructure: track record
From MahaRERA recordsM/S Twin Star Infrastructure has 1 project in our MahaRERA register for Pune.
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Ravet
FAQ
What is the price of Twin Star Vaastu Imperial?
No price for Twin Star Vaastu Imperial is published yet. Ask through the enquiry form on this page for the current price.
What is the possession date of Twin Star Vaastu Imperial?
The 3 MahaRERA registrations of Twin Star Vaastu Imperial have filed completion dates from 30 Dec 2024 to 30 Jun 2027. For P52100007631: The completion date filed with MahaRERA is 30 Jun 2027. At registration it was 30 Dec 2024. MahaRERA added 4 months to most projects' dates in August 2026 (Order 66/2026). Ask the builder for the possession date in your agreement, in writing.
What is the MahaRERA number of Twin Star Vaastu Imperial?
Twin Star Vaastu Imperial is registered with MahaRERA in 3 parts (towers or phases): P52100007631, P52100009507, P52100009509.
How many towers and floors does Twin Star Vaastu Imperial have?
MahaRERA lists 1 building in registration P52100007631, one of the project's 3, the tallest with 23 floors.
How many flats are there in Twin Star Vaastu Imperial?
MahaRERA lists 213 units across 2 of its 3 MahaRERA registrations; P52100007631 has 125.
How many homes in Twin Star Vaastu Imperial are booked?
193 of 213 homes were booked as per MahaRERA on 19 Nov 2026, across 2 of its 3 MahaRERA registrations.
Who is the builder of Twin Star Vaastu Imperial?
The promoter registered with MahaRERA is M/S Twin Star Infrastructure.
Where is Twin Star Vaastu Imperial?
Twin Star Vaastu Imperial is in Haveli, Pune district (pincode 412101).
Which school is nearest to Twin Star Vaastu Imperial?
S.B. Patil Public School (SBPPS) Ravet, Pune, about 1 km away in a straight line from the map position; the drive is longer.
How far is Twin Star Vaastu Imperial from Pune Airport?
About 19.8 km in a straight line from the map position; the drive is longer.
How far is Twin Star Vaastu Imperial from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?
About 6.7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Twin Star Vaastu Imperial.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 31 Aug 2026
- Dates and homes bookedFrom MahaRERA
Checked 22 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 22 Nov 2026
- Location and nearbyGathered and checked
Checked 22 Nov 2026
- DescriptionGathered and checked
Checked 22 Nov 2026
- Home sizesGathered and checked
The builder's site, or two property sites that agree
- Project facts and amenitiesGathered and checked
The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (22 Nov 2026)
Get the price sheet and floor plans for VAASTU IMPERIAL Wing B
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.