Vivencia, Camp
by KP50 Development Ventures LLP · Camp, Pune City, Pune district · 411001
- Homes
- 2 BHK
- Price
- from ₹2.21 Cr
- EMI about ₹1.53 L a month
- Possession
- Apr 2027
- completion filed with MahaRERA
- Booked
- 30 of 132
What stands out
As of 13 Nov 2026, from MahaRERA and the sources below.
- More homes than most: With 132 units, this project has more homes than 25 of the 29 other projects still being built in Camp.
- Low booking rate: Only 30 of the 132 homes are booked, about 23%.
- MahaRERA added 4 months: MahaRERA’s order in August 2026 added four months to the completion date, moving it from 31 Dec 2026 to 30 Apr 2027.
Updated 22 Nov 2026
Price
2 BHK
From ₹2.21 Cr
Last checked 19 Nov 2026
All-in cost of the 2 BHK at ₹2.21 Cr: about ₹2.48 Cr
Price (agreement value) ₹2.21 Cr GST (5%) ₹11.05 L Stamp duty (7%) ₹15.47 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹2.48 Cr
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹1.53 L a monthOn a ₹1.77 Cr loan (80% of ₹2.21 Cr) at 8.5% for 20 years. Ask your bank for its rate.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Vivencia, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Mar 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.
Nov 2022 Jan 2024 Mar 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Work hubs
- Pune Railway Station2.8 km
- Magarpatta City3.8 km
- Pune Airport (Lohegaon)4.8 km
- World Trade Center, Kharadi5.4 km
Nearby
- ShoppingKOPA Mall0.8 km
- BankHDFC Bank1.2 km
- SchoolArmy Public School1.6 km
- BankICICI Bank1.6 km
- SchoolThe Bishop's Co-Ed School1.8 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
Amenities
- Rain Water Harvesting system installed.
Last checked 19 Nov 2026.
MahaRERA record
From MahaRERA, read 13 Nov 2026Possession date
30 Apr 2027
The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2026.
Beside other Camp projects
Worked out by Avasetu- Completion date
- Not moved by the builder
- 10 of 30 Camp projects being built moved theirs 3 months or more.
From MahaRERA records read 13 Nov 2026. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 30 of 132
- Towers
- 2 in this registration
- The tallest has 24 floors.
- Units
- 132
- 126 homes, 6 shops or offices.
- Registered on
- 28 Apr 2023
- MahaRERA registration
- P52100050726
- Listed or updated on MahaRERA 4 Feb 2024.
- Promoter (builder)
- KP50 Development Ventures LLP
- Project type
- Others
- Pincode
- 411001
Check before you book
From MahaRERA- Only 23% of homes are booked 3 years after registration. Slow sales can slow building: check the progress the builder files with MahaRERA every quarter.
Tower by tower
2 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| TOWER B | 24 | 54 | 6 |
| TOWER A | 24 | 72 | 0 |
As filed with MahaRERA (sanctioned floors).
KP50 Development Ventures LLP: track record
From MahaRERA recordsKP50 Development Ventures LLP has 1 project in our MahaRERA register for Pune.
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Camp
FAQ
What is the price of Vivencia?
2 BHK: ₹2.21 Cr, checked on 19 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of Vivencia?
The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Vivencia?
Vivencia is registered with MahaRERA as P52100050726.
How many towers and floors does Vivencia have?
MahaRERA lists 2 buildings, the tallest with 24 floors.
How many flats are there in Vivencia?
MahaRERA lists 132 units (126 residential, 6 other).
How many homes in Vivencia are booked?
30 of 132 homes were booked as per MahaRERA on 13 Nov 2026.
Who is the builder of Vivencia?
The promoter registered with MahaRERA is KP50 Development Ventures LLP.
Where is Vivencia?
Vivencia is in 411001, Pune City, Pune district (pincode 411001).
Which school is nearest to Vivencia?
Army Public School, about 1.6 km away in a straight line from the map position; the drive is longer.
How far is Vivencia from Pune Airport?
About 4.8 km in a straight line from the map position; the drive is longer.
How far is Vivencia from Magarpatta City?
About 3.8 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Vivencia.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 4 Feb 2024
- Dates and homes bookedFrom MahaRERA
Checked 19 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 10 Nov 2026
- Location and nearbyGathered and checked
Checked 19 Nov 2026
- DescriptionGathered and checked
Checked 19 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (19 Nov 2026)
- Project facts and amenitiesGathered and checked
The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (19 Nov 2026)
Get the price sheet and floor plans for VIVENCIA
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.