VTP Volare from space, 2023 to 2026
The ground around the project's map pin, seen by the Sentinel-2 satellite once each dry season from Jan 2021 to Oct 2026. Plants there were cleared between Jan 2021 and Jan 2022: the satellite's infrared shows plant cover falling from 49% to 12%.
12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Slight shadow outlines suggest early vertical construction nearby.
- Apr–May 2026Little change, structure footprints remain visible.
- Jan–Mar 2026Ground structure footprints visible with surrounding cleared soil.
- Oct–Dec 2025Foundations or early footprint outlines appear within the ring.
- Apr–May 2025Cleared ground and earthworks persist with little change.
- Jan–Mar 2025Excavation marks and soil movement visible inside the ring.
- Oct–Dec 2024Earthworks and ground clearing visible after September 2024 registration.
- Apr–May 2024Little change, site remains cleared with blue structures.
- Jan–Mar 2024Ground preparation continues with blue structures present.
- Oct–Dec 2023Temporary structures with blue sheets remain unchanged.
- Apr–May 2023Blue sheets and temporary structures visible inside the ring.
- Jan–Mar 2023Blue sheets appear on structures within the ring.
VTP Volare: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.