Skip to main contentSkip to navigation

← All properties

VJ Yashwin Enchante, picture 1Vilas Javdekar Developers logo
From House Deal's listing
MahaRERA registered P52100046510Verify on MahaRERA (opens in a new tab)

VJ Yashwin Enchante, Upper Kharadi

Filed on MahaRERA as Yashwin Enchante Phase 1

See the site from above today

by Vilas Javdekar Developers · Upper Kharadi, Pune · 412207

Homes
2 & 3 BHK
Price
from ₹90 L
EMI about ₹62,483 a month
Possession
from Oct 2027
its parts filed Oct 2027 to Apr 2030
Booked
1,074 of 2,041
across all 2 of its MahaRERA registrations

What stands out

As of 4 Nov 2026, from MahaRERA and the sources below.

  • 94% of homes booked: Buyers have already booked 887 out of the 941 homes registered in this phase.
  • The finish date changed from 30 Jun 2027 to 30 Oct 2027 solely because MahaRERA's order added 4 months to the timeline.

Updated 21 Nov 2026

Pictures

VJ Yashwin Enchante, picture 2
VJ Yashwin Enchante, picture 3
VJ Yashwin Enchante, picture 4
VJ Yashwin Enchante, picture 5
VJ Yashwin Enchante, picture 6
C1C2 20th floor Casting WIP
E1E2 RCC - Terrace floor slab completed.

From House Deal's listing and the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Sample flat video

  • 2 BHK sample flat · from House Deal · Watch

VJ Yashwin Enchante in a short video

From ₹90 lakh, 2 BHK · 17.8 seconds
Open the video on its own page

Price

On offer

Listed by House Deal

From ₹90 L

2 & 3 BHK · apartments · 709 to 865 sq ft carpet

HomeCarpet areaPricePer sq ft
2 BHK709 sq ft₹90 L₹12,694/sq ft
2 BHK725 sq ft₹96 L₹13,241/sq ft
3 BHK865 sq ft₹1.12 Cr₹12,948/sq ft

With a home loan, your own cash for the 2 BHK: about ₹24.6 LYour own cash, about: the part banks may not lend (RBI: 75% to 90% of the price is the most a home loan covers), stamp duty 7% (6% if a woman buys) and registration up to ₹30,000. Add GST (5% on homes being built) if the price leaves it out.

EMI, as an example: about ₹62,483 a monthOn a ₹72 L loan (80% of the price) at 8.5% for 20 years. Ask your bank for its rate.

All-in cost of the 2 BHK at ₹90 L: about ₹1.01 Cr
Price (agreement value)As quoted, before taxes.₹90 L
GST (5%)On a home being built.₹4.5 L
Stamp duty (7%)The rate inside PMC and PCMC limits; 6% if a woman buys. Charged on the ready reckoner value instead when that is higher.₹6.3 L
Registration (1%, at most ₹30,000)₹30,000
Total before the builder's charges₹1.01 Cr

Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

From the agent's listing, 20 Nov 2026.

Upper Kharadi average ₹11,254/sq ft across 4 projectsThe middle asking price per sq ft of other projects in Upper Kharadi.

Want this at today's price?

Prices change. House Deal confirms today's price, what is still available and the full cost.

Ask for the current offer

VJ Yashwin Enchante from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

VJ Yashwin Enchante, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. VJ Yashwin Enchante from above, satellite picture of Nov 2022
    Nov 2022
  2. VJ Yashwin Enchante from above, satellite picture of Jan 2024
    Jan 2024
  3. VJ Yashwin Enchante from above, satellite picture of Feb 2025
    Feb 2025
  4. VJ Yashwin Enchante from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Apr–May 2026 (looked Nov 2026)

Main building envelopes remain stable with surrounding layout work. Little change.

Registered with MahaRERA Aug 2022 · possession filed for from Oct 2027

Season by season, Jan 2021 to Oct 2026: 17 seasons, October to May (the monsoon is under cloud).

The site transitions from bare land in 2021 to active construction following the August 2022 MahaRERA registration. By 2023, foundations and building footprints emerge, leading to tall structures casting prominent shadows through 2025 and 2026.

The seasons before

  1. Jan–Mar 2026Advanced structural silhouettes visible inside the ring.
  2. Oct–Dec 2025Multiple building structures present with distinct shadows.
  3. Apr–May 2025Dense structural footprints and casting shadows fill the ring area.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (11 earlier seasons)
  1. Jan–Mar 2025Tall building shadows clearly visible indicating active construction.
  2. Oct–Dec 2024Structure outlines become clearer with surrounding earthworks.
  3. Apr–May 2024Construction activity intensifies with defined building footprints and shadows.
  4. Jan–Mar 2024Dark shadows from tall structures appearing inside the ring.
  5. Apr–May 2023Early foundations and structural footprints appearing within the ring.
  6. Jan–Mar 2023Earthworks and ground clearing visible inside the ring.
  7. Oct–Dec 2022Initial ground clearing visible after the August registration. Little change.
  8. Jan–Mar 2022Undeveloped terrain with sparse vegetation around the ring. Little change.
  9. Oct–Dec 2021Ground remains cleared with no new activity. Little change.
  10. Apr–May 2021Bare earth remains visible inside the ring. Little change.
  11. Jan–Mar 2021Empty ground with no structures inside the ring. Little change.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

See the 1 floor plan

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • EON IT Park, Kharadi3.1 km
  • World Trade Center, Kharadi3.3 km
  • Pune Airport (Lohegaon)6.7 km
  • Magarpatta City7.8 km

Nearby

  • Industrial areaInternational Tech Park Pune, Kharadi1 km
  • CollegeG.H. Raisoni College OF Engineering & Management, PUNE2.1 km
  • Industrial areaEon IT Park Pune2.1 km
  • TempleWagheshwar Temple2.2 km
  • TempleDurga Mata Mandir2.8 km

Straight-line distances; the drive is longer. Places: Google Maps.

Project facts

Amenities

Last checked 18 Nov 2026.

MahaRERA record

From MahaRERA, read 4 Nov 2026

Possession date

30 Oct 2027 to 30 Apr 2030

The completion dates filed with MahaRERA for its 2 registrations; each is in the table of towers and phases below.

For P52100046510: 30 Oct 2027. The completion date filed with MahaRERA is 30 Oct 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Jun 2027.

The record

Homes booked
1,074 of 2,041
Across all 2 of its MahaRERA registrations. P52100046510 alone: 887 of 941.
Towers
5 in this registration
The tallest has 25 floors.
Units
941
887 homes, 54 shops or offices.
Registered on
10 Aug 2022
Main MahaRERA registration
P52100046510
Listed or updated on MahaRERA 12 Feb 2026.
Promoter (builder)
Vilas Javdekar Infinitee Developers Pvt. Ltd.
Project type
Others
Pincode
412207

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • 54 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

2 registrations, 5 buildings

Towers and phases (2 registrations)

From MahaRERA

MahaRERA holds VJ Yashwin Enchante as 2 registrations. Together they list 2,041 homes, 1,074 booked.

RegistrationCompletion filedBooked
Yashwin Enchante Phase 1P52100046510 (opens in a new tab)30 Oct 2027at registration 30 Jun 2027887 of 941
Yashwin Enchante Phase 2P52100077455 (opens in a new tab)30 Apr 2030at registration 31 Dec 2029187 of 1,100

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
A1 - A2252060
B1 - B2251470
D1 - D22519817
E1 - E22516623
F1 - F22517014

As filed with MahaRERA (sanctioned floors).

Vilas Javdekar Developers: track record

From MahaRERA records

Vilas Javdekar Developers has 41 projects in our MahaRERA register for Pune. 1 of 41 with both dates moved the completion date 3 months or more later, by 12 months on average.

  • Yashwin Jeevancompletion filed 30 Apr 2018
  • Yashwin E,F,Gcompletion filed 31 Dec 2018
  • Prudentia - Phase 1completion filed 30 Jun 2019
  • Yashwin Anandcompletion filed 30 Jun 2019
  • Portiacompletion filed 31 Dec 2019, moved 12 months later
  • Yashwin Acompletion filed 30 Sep 2020
  • YashONE Phase - Icompletion filed 30 Dec 2020
  • YASH101completion filed 30 Mar 2021
  • Palladio Phase 2completion filed 30 Dec 2022
  • YashONE Pirangut Phase IIcompletion filed 30 Dec 2022
  • VJ One Avenuecompletion filed 30 Dec 2023
  • YashONE Hinjawadi - Phase 1completion filed 30 Dec 2023
  • VJ 67 K Inclusive Housingcompletion filed 31 Dec 2023
  • Yashwin Orizzonte - Phase Icompletion filed 30 Jun 2024
  • VJ IndiLifecompletion filed 30 Sep 2024
  • VJ Town Centrecompletion filed 30 Sep 2024
  • MHADA - Yashwin Encorecompletion filed 30 Dec 2024
  • VJ Grand Centralcompletion filed 30 Dec 2024
  • YashONE Wakad Centralcompletion filed 30 Dec 2024
  • Yashwin Encorecompletion filed 30 Dec 2024
  • YASHWIN HINJAWADIcompletion filed 30 Jun 2025
  • YashONE Infinitee - Phase Icompletion filed 30 Jun 2025
  • 51B Inclusive Housingcompletion filed 31 Dec 2025
  • Yashwin SuperNovacompletion filed 30 Mar 2026
  • YashONE Eternitee Phase 1completion filed 30 Apr 2026
  • 172W Inclusive Housingcompletion filed 30 Jun 2026
  • Yashwin NuovoCentrocompletion filed 30 Jun 2026
  • UK1321 Inclusive Housingcompletion filed 31 Dec 2026
  • 38K Inclusive Housingcompletion filed 30 Apr 2027
  • VJ Central Avenuecompletion filed 30 Apr 2027

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

More from House Deal

All homes from House Deal

FAQ

What is the price of VJ Yashwin Enchante?

A local agent quotes from ₹90 L for VJ Yashwin Enchante. Prices change often: ask for today's price and what it includes.

What is the possession date of VJ Yashwin Enchante?

The 2 MahaRERA registrations of VJ Yashwin Enchante have filed completion dates from 30 Oct 2027 to 30 Apr 2030. For P52100046510: The completion date filed with MahaRERA is 30 Oct 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of VJ Yashwin Enchante?

VJ Yashwin Enchante is registered with MahaRERA in 2 parts (towers or phases): P52100046510, P52100077455.

How many towers and floors does VJ Yashwin Enchante have?

MahaRERA lists 5 buildings in registration P52100046510, one of the project's 2, the tallest with 25 floors.

How many flats are there in VJ Yashwin Enchante?

MahaRERA lists 2041 units across all 2 of its MahaRERA registrations; P52100046510 has 941.

How many homes in VJ Yashwin Enchante are booked?

1074 of 2041 homes were booked as per MahaRERA on 4 Nov 2026, across all 2 of its MahaRERA registrations.

Who is the builder of VJ Yashwin Enchante?

The promoter registered with MahaRERA is Vilas Javdekar Infinitee Developers Pvt. Ltd.. Our register has 41 Pune projects by Vilas Javdekar Developers; 1 of 41 with both dates moved their completion date 3 months or more later.

Where is VJ Yashwin Enchante?

VJ Yashwin Enchante is in Upper Kharadi, Pune (pincode 412207).

How far is VJ Yashwin Enchante from Pune Airport?

About 6.7 km in a straight line from the map position; the drive is longer.

How far is VJ Yashwin Enchante from EON IT Park, Kharadi?

About 3.1 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to VJ Yashwin Enchante.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 12 Feb 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 18 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 4 Nov 2026

  • Location and nearbyGathered and checked

    Checked 18 Nov 2026

  • DescriptionGathered and checked

    Checked 5 Nov 2026

  • PriceGathered and checked

    The agent's price sheet (20 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (18 Nov 2026)

Get the price sheet and floor plans for Yashwin Enchante Phase 1

House Deal calls or WhatsApps you back; your number is never shared without your OK.

What would you like?

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment