Skip to main contentSkip to navigation
MahaRERA registered P52100080292Verify on MahaRERA (opens in a new tab)

108 Astera, Tathawade

Sold as Punawale by 7 property sites; we list it under Tathawade (pincode 411033).

See the site from above today

by Aum Ventures · Tathawade, Mulshi, Pune district · 411033

Homes
2 BHK
Price
from ₹85 L
EMI about ₹59,012 a month
Possession
from Apr 2031
its parts filed Apr 2031 to Apr 2032
Booked
313 of 578
11 booked in the last 30 days

What stands out

As of 12 Nov 2026, from MahaRERA and the sources below.

  • 30 Apr 2032 completion date: The builder originally filed for a December 2031 completion. A MahaRERA order added 4 months to the timeline, resulting in the current April 2032 date.
  • With 346 homes in this registration, the project is larger than 161 of 222 other active developments in Tathawade. The buildings reach up to 24 floors, which is taller than 22 of 48 nearby projects.

Updated 21 Nov 2026

Price

  • 2 BHK

    ₹85 L – ₹97 L

    from 849 sq ft · ₹10,012/sq ft

    Last checked 8 Nov 2026

    All-in cost of the 2 BHK at ₹85 L: about ₹95.5 L
    Price (agreement value)₹85 L
    GST (5%)₹4.25 L
    Stamp duty (7%)₹5.95 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹95.5 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹59,012 a monthOn a ₹68 L loan (80% of ₹85 L) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for 108 Astera

  • 3 BHK about ₹1 – 1.3 Cr
  • 4 BHK about ₹1.5 – 1.8 Cr

Our own rounded guide, checked against the area on 8 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

What new homes in Tathawade usually ask

  • 2 BHK about ₹70 – 90 L (38 projects)
  • 2.5 BHK about ₹90 L – ₹1.1 Cr (4 projects)
  • 3 BHK about ₹90 L – ₹1.3 Cr (37 projects)
  • 4 BHK about ₹1.2 – 2 Cr (6 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.

Tathawade average ₹10,874/sq ft across 18 projectsThe middle asking price per sq ft of other projects in Tathawade.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

108 Astera from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

108 Astera, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. 108 Astera from above, satellite picture of Nov 2022
    Nov 2022
  2. 108 Astera from above, satellite picture of Jan 2024
    Jan 2024
  3. 108 Astera from above, satellite picture of Feb 2025
    Feb 2025
  4. 108 Astera from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Building footprints remain clearly visible within the ring.

Registered with MahaRERA May 2025 · possession filed for from Apr 2031

Season by season, Jan 2024 to Oct 2026: 9 seasons, October to May (the monsoon is under cloud).

The site remained mostly open fields and bare soil through 2024. Following MahaRERA registrations in May and December 2025 for 108 Astera, clear building footprints and active construction appear within the ring by late 2024 and 2025.

The seasons before

  1. Apr–May 2026Little change, construction footprints maintained on site.
  2. Jan–Mar 2026Active footprints and clearing visible following 108 ASTERA registrations.
  3. Oct–Dec 2025Structure footprints remain visible as work continues.
Construction proof from space: Jan 2024 to Oct 2026, Copernicus Sentinel-2 (5 earlier seasons)
  1. Apr–May 2025Little change, construction footprints persist clearly within the ring.
  2. Jan–Mar 2025Construction footprints visible with active ground works matching MahaRERA registrations.
  3. Oct–Dec 2024New bright building footprints appear inside the ring area.
  4. Apr–May 2024Little change, dry soil occupies the entire ring.
  5. Jan–Mar 2024Plants being cleared

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)3.3 km
  • Baner-Balewadi High Street7.1 km
  • Pune Railway Station18 km
  • Pune Airport (Lohegaon)19.1 km

Nearby

  • SchoolAkshara International School & Junior College1.8 km
  • CollegeIndira College of Commerce & Science (ICCS)2 km
  • SchoolIndira National School2.1 km
  • TempleShani Mandir2.3 km
  • CollegeSri Balaji University, Pune (SBUP)2.6 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 12 Nov 2026

Possession date

30 Apr 2031 to 30 Apr 2032

The completion dates filed with MahaRERA for its 2 registrations; each is in the table of towers and phases below.

For P52100080292: 30 Apr 2032. The completion date filed with MahaRERA is 30 Apr 2032; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2031.

The record

Homes booked
313 of 578
Across all 2 of its MahaRERA registrations. P52100080292 alone: 178 of 346.
Towers
4 in this registration
The tallest has 24 floors. 6 in the whole project.
Units
346
282 homes, 64 shops or offices.
Registered on
19 May 2025
Main MahaRERA registration
P52100080292
Listed or updated on MahaRERA 26 Sep 2025.
Promoter (builder)
Aum Ventures
Project type
Others
Pincode
411033

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Completion is filed for Apr 2032, about 5 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
  • 64 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

2 registrations, 4 buildings

Towers and phases (2 registrations)

From MahaRERA

MahaRERA holds 108 Astera as 2 registrations. Together they list 578 homes, 313 booked.

RegistrationCompletion filedBooked
108 ASTERAP52100080292 (opens in a new tab)30 Apr 2032at registration 31 Dec 2031178 of 346
108 ASTERA "WING D E & F"PR1260002501838 (opens in a new tab)30 Apr 2031at registration 31 Dec 2030135 of 232

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
A WING248464
B WING24840
MHADA WING16300
C WING24840

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 21 floors

Last checked 8 Nov 2026. MahaRERA counts where they differ.

Aum Ventures: track record

From MahaRERA records

Aum Ventures has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Tathawade

FAQ

What is the price of 108 Astera?

2 BHK: ₹85 L to ₹97 L, checked on 8 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of 108 Astera?

The 2 MahaRERA registrations of 108 Astera have filed completion dates from 30 Apr 2031 to 30 Apr 2032. For P52100080292: The completion date filed with MahaRERA is 30 Apr 2032; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of 108 Astera?

108 Astera is registered with MahaRERA in 2 parts (towers or phases): P52100080292, PR1260002501838.

How many towers and floors does 108 Astera have?

MahaRERA lists 4 buildings in registration P52100080292, one of the project's 2, the tallest with 24 floors.

How many flats are there in 108 Astera?

MahaRERA lists 578 units across all 2 of its MahaRERA registrations; P52100080292 has 346.

How many homes in 108 Astera are booked?

313 of 578 homes were booked as per MahaRERA on 12 Nov 2026, across all 2 of its MahaRERA registrations.

Who is the builder of 108 Astera?

The promoter registered with MahaRERA is Aum Ventures.

Where is 108 Astera?

108 Astera is in Mulshi, Pune district (pincode 411033).

Which school is nearest to 108 Astera?

Akshara International School & Junior College, about 1.8 km away in a straight line from the map position; the drive is longer.

How far is 108 Astera from Pune Airport?

About 19.1 km in a straight line from the map position; the drive is longer.

How far is 108 Astera from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 3.3 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to 108 Astera.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 26 Sep 2025

  • Dates and homes bookedFrom MahaRERA

    Checked 8 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 8 Nov 2026

  • Location and nearbyGathered and checked

    Checked 8 Nov 2026

  • DescriptionGathered and checked

    Checked 8 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (8 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (8 Nov 2026)

Get the price sheet and floor plans for 108 ASTERA

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment