108 Astera from space, 2024 to 2026

The site remained mostly open fields and bare soil through 2024. Following MahaRERA registrations in May and December 2025 for 108 Astera, clear building footprints and active construction appear within the ring by late 2024 and 2025.

Today, from Google satellite, centred on the same map pin.

9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Building footprints remain clearly visible within the ring.
  2. Apr–May 2026Little change, construction footprints maintained on site.
  3. Jan–Mar 2026Active footprints and clearing visible following 108 ASTERA registrations.
  4. Oct–Dec 2025Structure footprints remain visible as work continues.
  5. Apr–May 2025Little change, construction footprints persist clearly within the ring.
  6. Jan–Mar 2025Construction footprints visible with active ground works matching MahaRERA registrations.
  7. Oct–Dec 2024New bright building footprints appear inside the ring area.
  8. Apr–May 2024Little change, dry soil occupies the entire ring.
  9. Jan–Mar 2024Plants being cleared

108 Astera: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.