Skip to main contentSkip to navigation
MahaRERA registered P52100048742Verify on MahaRERA (opens in a new tab)Near completion

Aishwaryam Future, Tathawade

Sold as Punawale by 10 property sites; we list it under Tathawade (pincode 411033).

See the site from above today

by Sai Swaraj Realtors · Tathawade, Mulshi, Pune district · 411033

Homes
2, 2.5, 3 BHK
Price
from ₹91 L
EMI about ₹63,178 a month
Possession
Feb 2028
completion filed with MahaRERA
Booked
179 of 308

What stands out

As of 12 Nov 2026, from MahaRERA and the sources below.

  • 54% of homes booked: Buyers have reserved 167 of the 308 homes, which trails the area pace where similar projects are at about 66%.
  • With 308 homes planned in this registration, the development has more units than 157 of 225 ongoing projects in Tathawade.

Updated 21 Nov 2026

Price

  • 2 BHK

    From ₹96.97 L

    Last checked 4 Nov 2026

    All-in cost of the 2 BHK at ₹96.97 L: about ₹1.09 Cr
    Price (agreement value)₹96.97 L
    GST (5%)₹4.85 L
    Stamp duty (7%)₹6.79 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.09 Cr
  • 2.5 BHK

    From ₹91 L

    Last checked 4 Nov 2026

    All-in cost of the 2.5 BHK at ₹91 L: about ₹1.02 Cr
    Price (agreement value)₹91 L
    GST (5%)₹4.55 L
    Stamp duty (7%)₹6.37 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.02 Cr
  • 3 BHK

    ₹92.8 L – ₹1.07 Cr

    Last checked 4 Nov 2026

    All-in cost of the 3 BHK at ₹92.8 L: about ₹1.04 Cr
    Price (agreement value)₹92.8 L
    GST (5%)₹4.64 L
    Stamp duty (7%)₹6.5 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.04 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹63,178 a monthOn a ₹72.8 L loan (80% of ₹91 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Tathawade usually ask

  • 2 BHK about ₹70 – 90 L (39 projects)
  • 2.5 BHK about ₹90 L – ₹1.1 Cr (3 projects)
  • 3 BHK about ₹95 L – ₹1.3 Cr (37 projects)
  • 4 BHK about ₹1.3 – 2 Cr (7 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.

Tathawade average ₹10,852/sq ft across 19 projectsThe middle asking price per sq ft of other projects in Tathawade.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Aishwaryam Future from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Aishwaryam Future, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Aishwaryam Future from above, satellite picture of Nov 2022
    Nov 2022
  2. Aishwaryam Future from above, satellite picture of Jan 2024
    Jan 2024
  3. Aishwaryam Future from above, satellite picture of Feb 2025
    Feb 2025
  4. Aishwaryam Future from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Ground cleared

Registered with MahaRERA Jan 2023 · possession filed for Feb 2028

Season by season, Jan 2022 to Oct 2026: 15 seasons, October to May (the monsoon is under cloud).

Aishwaryam Future in Punawale shows land clearing starting in 2022, followed by building footprints and structural shadows appearing by 2024, aligning with its January 2023 MahaRERA registration.

The seasons before

  1. Apr–May 2026Little change as exterior work continues around structures.
  2. Jan–Mar 2026Clear building shadows cast northwest from structures in the ring.
  3. Oct–Dec 2025Surrounding area shows established building shadows and site activity.
Construction proof from space: Jan 2022 to Oct 2026, Copernicus Sentinel-2 (11 earlier seasons)
  1. Apr–May 2025Little change in structure footprints during dry summer months.
  2. Jan–Mar 2025Ground cleared
  3. Oct–Dec 2024Tall structures cast shadows northwest, showing structural growth.
  4. Apr–May 2024Building footprints and shadows become more prominent nearby.
  5. Jan–Mar 2024Ground cleared
  6. Oct–Dec 2023Little change observed with ongoing ground work.
  7. Apr–May 2023Bare soil and temporary structures remain visible inside the ring.
  8. Jan–Mar 2023Ground clearing continues with earthwork visible inside the ring.
  9. Oct–Dec 2022Sheds and blue sheets appear. Work shows after registration.
  10. Apr–May 2022Dry bare ground visible inside the ring. Little change.
  11. Jan–Mar 2022Ground clearing begins inside the ring with sparse vegetation.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)5.5 km
  • Baner-Balewadi High Street8.7 km
  • Pune Railway Station18.9 km
  • Pune Airport (Lohegaon)19.2 km

Nearby

  • SchoolS.B. Patil Public School (SBPPS) Ravet, Pune1.6 km
  • ShoppingD Mart Ravet2 km
  • CollegeD.Y. Patil College of Engineering2.1 km
  • CollegeD. Y. Patil International University2.2 km
  • TempleISKCON (Shree Govinda Dham) Ravet2.3 km

Straight-line distances; the drive is longer. Places: Google Maps.

Amenities

  • Project includes a designer club house.

Last checked 4 Nov 2026.

MahaRERA record

From MahaRERA, read 12 Nov 2026

Possession date

15 Feb 2028

The completion date filed with MahaRERA is 15 Feb 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 15 Oct 2027.

Beside other Tathawade projects

Worked out by Avasetu
Homes booked
58%
The middle of 56 Tathawade projects registered within a year of it: 66%.
Completion date
Not moved by the builder
53 of 233 Tathawade projects being built moved theirs 3 months or more.

From MahaRERA records read 12 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
179 of 308
Towers
5 in this registration
The tallest has 24 floors.
Units
308
257 homes, 51 shops or offices.
Registered on
17 Jan 2023
MahaRERA registration
P52100048742
Listed or updated on MahaRERA 24 Feb 2026.
Promoter (builder)
Sai Swaraj Realtors
Project type
Others
Pincode
411033

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • 51 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

5 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
A247724
B247710
C24808
D8239
MHADA1100

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 20 floors

Last checked 4 Nov 2026. MahaRERA counts where they differ.

Sai Swaraj Realtors: track record

From MahaRERA records

Sai Swaraj Realtors has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Tathawade

FAQ

What is the price of Aishwaryam Future?

2 BHK: ₹96.97 L; 2.5 BHK: ₹91 L; 3 BHK: ₹92.8 L to ₹1.07 Cr, checked on 4 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Aishwaryam Future?

The completion date filed with MahaRERA is 15 Feb 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Aishwaryam Future?

Aishwaryam Future is registered with MahaRERA as P52100048742.

How many towers and floors does Aishwaryam Future have?

MahaRERA lists 5 buildings, the tallest with 24 floors.

How many flats are there in Aishwaryam Future?

MahaRERA lists 308 units (257 residential, 51 other).

How many homes in Aishwaryam Future are booked?

179 of 308 homes were booked as per MahaRERA on 12 Nov 2026.

Who is the builder of Aishwaryam Future?

The promoter registered with MahaRERA is Sai Swaraj Realtors.

Where is Aishwaryam Future?

Aishwaryam Future is in Mulshi, Pune district (pincode 411033).

Which school is nearest to Aishwaryam Future?

S.B. Patil Public School (SBPPS) Ravet, Pune, about 1.6 km away in a straight line from the map position; the drive is longer.

How far is Aishwaryam Future from Pune Airport?

About 19.2 km in a straight line from the map position; the drive is longer.

How far is Aishwaryam Future from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 5.5 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Aishwaryam Future.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 24 Feb 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 5 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 5 Nov 2026

  • Location and nearbyGathered and checked

    Checked 5 Nov 2026

  • DescriptionGathered and checked

    Checked 5 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (4 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (4 Nov 2026)

Get the price sheet and floor plans for Aishwaryam Future

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment