

Anp Autograph, Tathawade
Sold as Punawale by 4 property sites; we list it under Tathawade (pincode 411033).
See the site from above todayby Anp Landmarks LLP · Tathawade, Mulshi, Pune district · 411033
- Possession
- Oct 2028
- completion filed with MahaRERA
- Booked
- 262 of 515
What stands out
As of 20 Nov 2026, from MahaRERA and the sources below.
- 51% of homes booked: MahaRERA shows 262 of 515 homes booked.
- Buildings in this registration: 4, up to 42 floors.
- 51% booked here; the middle of 67 Tathawade projects registered within a year of it is 54%.
- Compared with other projects still being built in Tathawade: Compared with other projects still being built in Tathawade: its tallest building is higher than that of 87 of 88.
- Completion date filed with MahaRERA: 30 Oct 2028.
Updated 21 Nov 2026
Pictures
From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.
Price
No price for Anp Autograph is published yet.
What new homes in Tathawade usually ask
- 2 BHK about ₹70 – 90 L (39 projects)
- 2.5 BHK about ₹90 L – ₹1.1 Cr (4 projects)
- 3 BHK about ₹90 L – ₹1.3 Cr (38 projects)
- 4 BHK about ₹1.3 – 2 Cr (7 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.
Tathawade average ₹10,852/sq ft across 19 projectsThe middle asking price per sq ft of other projects in Tathawade.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Anp Autograph from above, today
Anp Autograph, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024 and Oct 2025, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.
Nov 2022 Jan 2024 Oct 2025 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Shadows from tall buildings remain visible near the ring.
Registered with MahaRERA Jun 2023 · possession filed for Oct 2028
Satellite imagery shows vacant land transforming with construction activity following the June 2023 registration. Long shadows cast by tall buildings appear within and around the ring by late 2023 and persist through 2026.
The seasons before
- Apr–May 2026Dry ground and building footprints visible, little change.
- Jan–Mar 2026Long shadows from tall structures dominate the ring.
- Oct–Dec 2025Building shadows persist, little change in the ring.
Construction proof from space: Jan 2022 to Oct 2026, Copernicus Sentinel-2 (11 earlier seasons)
- Apr–May 2025Clear ground and shadows, little change since last season.
- Jan–Mar 2025Tall building shadows cross the ring, new structures visible.
- Oct–Dec 2024Building shadows lengthen, little change near the ring.
- Apr–May 2024Ground cleared around building footprints, little change otherwise.
- Jan–Mar 2024Long shadows from tall buildings appear near the ring.
- Oct–Dec 2023Work shows after the June 2023 registration with new shadows.
- Apr–May 2023Dry conditions persist, little change since last season.
- Jan–Mar 2023Plants present, little change visible inside the ring.
- Oct–Dec 2022Ground cleared near the ring, little change overall.
- Apr–May 2022Bare ground visible, little change since previous season.
- Jan–Mar 2022Plant cover returns, little change visible in the ring.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)5.2 km
- Baner-Balewadi High Street7.8 km
- Pune Railway Station17.7 km
- Pune Airport (Lohegaon)17.8 km
Nearby
- CollegeD.Y. Patil College of Engineering1.2 km
- ShoppingD Mart Ravet1.3 km
- CollegeD. Y. Patil International University1.4 km
- SchoolS.B. Patil Public School (SBPPS) Ravet, Pune2 km
- CollegePimpri Chinchwad College Of Engineering (PCCOE)2 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
MahaRERA record
From MahaRERA, read 20 Nov 2026Possession date
30 Oct 2028
The completion date filed with MahaRERA is 30 Oct 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Jun 2028.
Beside other Tathawade projects
Worked out by Avasetu- Homes booked
- 51%
- The middle of 66 Tathawade projects registered within a year of it: 59%.
- Completion date
- Not moved by the builder
- 53 of 233 Tathawade projects being built moved theirs 3 months or more.
From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 262 of 515
- Towers
- 4 in this registration
- The tallest has 42 floors.
- Units
- 515
- 487 homes, 28 shops or offices.
- Registered on
- 27 Jun 2023
- MahaRERA registration
- P52100051641
- Listed or updated on MahaRERA 22 Jun 2026.
- Promoter (builder)
- Anp Landmarks LLP
- Project type
- Others
- Pincode
- 411033
Check before you book
From MahaRERA- Towers go up to 42 floors. Ask how many lifts serve your tower and how many homes share them.
- 28 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.
Tower by tower
4 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| A Building | 26 | 74 | 14 |
| B Building | 42 | 133 | 0 |
| C Building | 42 | 140 | 0 |
| D Building | 42 | 140 | 14 |
As filed with MahaRERA (sanctioned floors).
Anp Landmarks LLP: track record
From MahaRERA recordsAnp Landmarks LLP has 1 project in our MahaRERA register for Pune.
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Tathawade
FAQ
What is the price of Anp Autograph?
No price for Anp Autograph is published yet. Ask through the enquiry form on this page for the current price.
What is the possession date of Anp Autograph?
The completion date filed with MahaRERA is 30 Oct 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Anp Autograph?
Anp Autograph is registered with MahaRERA as P52100051641.
How many towers and floors does Anp Autograph have?
MahaRERA lists 4 buildings, the tallest with 42 floors.
How many flats are there in Anp Autograph?
MahaRERA lists 515 units (487 residential, 28 other).
How many homes in Anp Autograph are booked?
262 of 515 homes were booked as per MahaRERA on 20 Nov 2026.
Who is the builder of Anp Autograph?
The promoter registered with MahaRERA is Anp Landmarks LLP.
Where is Anp Autograph?
Anp Autograph is in Mulshi, Pune district (pincode 411033).
Which school is nearest to Anp Autograph?
S.B. Patil Public School (SBPPS) Ravet, Pune, about 2 km away in a straight line from the map position; the drive is longer.
How far is Anp Autograph from Pune Airport?
About 17.8 km in a straight line from the map position; the drive is longer.
How far is Anp Autograph from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?
About 5.2 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Anp Autograph.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 22 Jun 2026
- Dates and homes bookedFrom MahaRERA
Checked 10 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 10 Nov 2026
- Location and nearbyGathered and checked
Checked 10 Nov 2026
- DescriptionGathered and checked
Checked 10 Nov 2026
Get the price sheet and floor plans for ANP AUTOGRAPH
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.


