Skip to main contentSkip to navigation
MahaRERA registered P52100056316Verify on MahaRERA (opens in a new tab)Mid stage

Akshara Grandeur, Tathawade

Sold as Punawale by 6 property sites; we list it under Tathawade (pincode 411033).

See the site from above today

by Garve Developers and Builders · Tathawade, Mulshi, Pune district · 411033

Price
from ₹65 L
EMI about ₹45,127 a month
Possession
Apr 2029
completion filed with MahaRERA
Booked
73 of 437

What stands out

As of 20 Nov 2026, from MahaRERA and the sources below.

  • Only 73 of 437 homes are booked (17%), while the median booking rate among 94 Tathawade projects is about 44%.
  • With 437 homes, this registration has more units than 181 of 224 comparable projects in the area.
  • The development sits next to a 57-acre biodiversity park, offering open-space surroundings.

Updated 21 Nov 2026

Price

  • Homes

    ₹65 L – ₹90 L

    Last checked 20 Nov 2026

    All-in cost of a home at ₹65 L: about ₹73.1 L
    Price (agreement value)₹65 L
    GST (5%)₹3.25 L
    Stamp duty (7%)₹4.55 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹73.1 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹45,127 a monthOn a ₹52 L loan (80% of ₹65 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Tathawade usually ask

  • 2 BHK about ₹70 – 90 L (39 projects)
  • 2.5 BHK about ₹90 L – ₹1.1 Cr (4 projects)
  • 3 BHK about ₹90 L – ₹1.3 Cr (38 projects)
  • 4 BHK about ₹1.3 – 2 Cr (7 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.

Tathawade average ₹10,852/sq ft across 19 projectsThe middle asking price per sq ft of other projects in Tathawade.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Akshara Grandeur from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Akshara Grandeur, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Akshara Grandeur from above, satellite picture of Nov 2022
    Nov 2022
  2. Akshara Grandeur from above, satellite picture of Jan 2024
    Jan 2024
  3. Akshara Grandeur from above, satellite picture of Feb 2025
    Feb 2025
  4. Akshara Grandeur from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Northward shadows confirm continuous presence of tall structures in the ring.

Registered with MahaRERA May 2024 · possession filed for Apr 2029

Season by season, Jan 2023 to Oct 2026: 12 seasons, October to May (the monsoon is under cloud).

The site remained largely vacant with seasonal vegetation until early construction activity appeared following the May 2024 registration, showing clear building footprints and growing shadows in subsequent winter seasons.

The seasons before

  1. Apr–May 2026Structure footprints and shadows remain visible inside the ring.
  2. Jan–Mar 2026Prominent dark shadows indicate significant vertical development within the ring.
  3. Oct–Dec 2025Clear building shadows cast northward, showing vertical structure growth.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2 (8 earlier seasons)
  1. Apr–May 2025Construction footprint and shadows persist inside the ring area.
  2. Jan–Mar 2025Dark shadows lengthen inside the ring, reflecting ongoing construction activity.
  3. Oct–Dec 2024New dark shadows appear inside the ring indicating early vertical construction work.
  4. Apr–May 2024Dry earth is visible inside the ring following registration of Akshara Grandeur.
  5. Jan–Mar 2024Ground shows cleared soil and sparse vegetation.
  6. Oct–Dec 2023Seasonal greenery appears patchily within the ring area.
  7. Apr–May 2023Ground is dry and clear with little change visible.
  8. Jan–Mar 2023Vacant ground shows dry soil and sparse vegetation.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)3.7 km
  • Baner-Balewadi High Street7.8 km
  • Pune Railway Station18.8 km
  • Pune Airport (Lohegaon)19.8 km

Nearby

  • SchoolAkshara International School & Junior College2.5 km
  • CollegeIndira College of Commerce & Science (ICCS)2.7 km
  • SchoolIndira National School2.8 km
  • TempleShani Mandir3 km
  • CollegeSri Balaji University, Pune (SBUP)3.3 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Amenities

  • Ample car parking.
  • CCTV Surveillance.

Last checked 20 Nov 2026.

MahaRERA record

From MahaRERA, read 20 Nov 2026

Possession date

30 Apr 2029

The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2028.

Beside other Tathawade projects

Worked out by Avasetu
Homes booked
17%
The middle of 94 Tathawade projects registered within a year of it: 44%.
Completion date
Not moved by the builder
53 of 233 Tathawade projects being built moved theirs 3 months or more.

From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
73 of 437
Towers
3 in this registration
The tallest has 25 floors.
Units
437
406 homes, 31 shops or offices.
Registered on
29 May 2024
MahaRERA registration
P52100056316
Listed or updated on MahaRERA 23 Apr 2026.
Promoter (builder)
Garve Developers and Builders
Project type
Others
Pincode
411033

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Only 17% of homes are booked 2 years after registration. Slow sales can slow building: check the progress the builder files with MahaRERA every quarter.
  • 31 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
A-1 wing251660
A-2 wing227831
A3 wing251620

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 23 floors

Last checked 20 Nov 2026. MahaRERA counts where they differ.

Garve Developers and Builders: track record

From MahaRERA records

Garve Developers and Builders has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Tathawade

FAQ

What is the price of Akshara Grandeur?

Homes from ₹65 L to ₹90 L, checked on 20 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Akshara Grandeur?

The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Akshara Grandeur?

Akshara Grandeur is registered with MahaRERA as P52100056316.

How many towers and floors does Akshara Grandeur have?

MahaRERA lists 3 buildings, the tallest with 25 floors.

How many flats are there in Akshara Grandeur?

MahaRERA lists 437 units (406 residential, 31 other).

How many homes in Akshara Grandeur are booked?

73 of 437 homes were booked as per MahaRERA on 20 Nov 2026.

Who is the builder of Akshara Grandeur?

The promoter registered with MahaRERA is Garve Developers and Builders.

Where is Akshara Grandeur?

Akshara Grandeur is in 411033, Mulshi, Pune district (pincode 411033).

Which school is nearest to Akshara Grandeur?

Akshara International School & Junior College, about 2.5 km away in a straight line from the map position; the drive is longer.

How far is Akshara Grandeur from Pune Airport?

About 19.8 km in a straight line from the map position; the drive is longer.

How far is Akshara Grandeur from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 3.7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Akshara Grandeur.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 23 Apr 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 20 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 9 Nov 2026

  • Location and nearbyGathered and checked

    Checked 20 Nov 2026

  • DescriptionGathered and checked

    Checked 20 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (20 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (20 Nov 2026)

Get the price sheet and floor plans for Akshara Grandeur

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment