Aria, Tathawade
Sold as Punawale by 8 property sites; we list it under Tathawade (pincode 411033).
See the site from above todayby Aurigaa Realtors · Tathawade, Mulshi, Pune district · 411033
- Price
- from ₹83 L
- EMI about ₹57,623 a month
- Possession
- Apr 2030
- completion filed with MahaRERA
- Booked
- 107 of 515
What stands out
As of 20 Nov 2026, from MahaRERA and the sources below.
- 21 percent of homes booked: Out of 515 homes, 107 are booked, while similar projects are at about 20 percent.
- More homes than 193 projects: This registration contains 515 homes across 4 buildings on 2.6 acres of land.
Updated 21 Nov 2026
Price
Homes
₹83 L – ₹1.27 Cr
Last checked 8 Nov 2026
All-in cost of a home at ₹83 L: about ₹93.26 L
Price (agreement value) ₹83 L GST (5%) ₹4.15 L Stamp duty (7%) ₹5.81 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹93.26 L
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹57,623 a monthOn a ₹66.4 L loan (80% of ₹83 L) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Tathawade usually ask
- 2 BHK about ₹70 – 90 L (39 projects)
- 2.5 BHK about ₹90 L – ₹1.1 Cr (4 projects)
- 3 BHK about ₹90 L – ₹1.3 Cr (38 projects)
- 4 BHK about ₹1.3 – 2 Cr (7 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.
Tathawade average ₹10,852/sq ft across 19 projectsThe middle asking price per sq ft of other projects in Tathawade.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Aria from above, today
Aria, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Jan–Mar 2026 (looked Nov 2026)
Shadows from tall buildings grow, matching the Jun 2025 registration.
Registered with MahaRERA Jun 2025 · possession filed for Apr 2030
Registered with MahaRERA in Jun 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.
The seasons before
- Oct–Dec 2025Tall building shadows begin appearing near the ring.
- Jan–Mar 2025New structures and building footprints appear inside the ring.
Construction proof from space: Jan 2024 to Oct 2026, Copernicus Sentinel-2
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)4.6 km
- Baner-Balewadi High Street7.7 km
- Pune Railway Station18 km
- Pune Airport (Lohegaon)18.4 km
Nearby
- CollegeD.Y. Patil College of Engineering2 km
- ShoppingD Mart Ravet2 km
- CollegeD. Y. Patil International University2.2 km
- SchoolS.B. Patil Public School (SBPPS) Ravet, Pune2.3 km
- CollegeIndira College of Commerce & Science (ICCS)2.5 km
Straight-line distances; the drive is longer. Places: Google Maps.
Amenities
- Provides dedicated car parking facilities for residents.
Last checked 8 Nov 2026.
MahaRERA record
From MahaRERA, read 20 Nov 2026Possession date
30 Apr 2030
The completion date filed with MahaRERA is 30 Apr 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2029.
Beside other Tathawade projects
Worked out by Avasetu- Homes booked
- 21%
- The middle of 102 Tathawade projects registered within a year of it: 25%.
- Completion date
- Not moved by the builder
- 53 of 233 Tathawade projects being built moved theirs 3 months or more.
From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 107 of 515
- Towers
- 4 in this registration
- The tallest has 20 floors.
- Units
- 515
- 513 homes, 2 shops or offices.
- Registered on
- 19 Jun 2025
- MahaRERA registration
- P52100080612
- Listed or updated on MahaRERA 15 Apr 2026.
- Promoter (builder)
- Aurigaa Realtors
- Project type
- Others
- Pincode
- 411033
Check before you book
From MahaRERA and checked sites- About 198 homes per acre (515 homes on 2.6 acres, from two property sites that agree). Towers stand close: ask how far your tower is from the next and which flats face another tower.
Tower by tower
4 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| A BUILDING | 20 | 132 | 2 |
| B BUILDING | 19 | 188 | 0 |
| C BUILDING | 19 | 187 | 0 |
| D BUILDING | 5 | 6 | 0 |
As filed with MahaRERA (sanctioned floors).
What the builder's and property sites say
Gathered and checked- Land
- 2.6 acres
Last checked 8 Nov 2026. MahaRERA counts where they differ.
Aurigaa Realtors: track record
From MahaRERA recordsAurigaa Realtors has 4 projects in our MahaRERA register for Pune.
- MIRAI PHASE-Icompletion filed 31 Dec 2026
- ARYABANcompletion filed 31 Dec 2027
- THE RIDGES 41completion filed 20 Apr 2030
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Tathawade
More by Aurigaa Realtors
FAQ
What is the price of Aria?
Homes from ₹83 L to ₹1.27 Cr, checked on 8 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of Aria?
The completion date filed with MahaRERA is 30 Apr 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Aria?
Aria is registered with MahaRERA as P52100080612.
How many towers and floors does Aria have?
MahaRERA lists 4 buildings, the tallest with 20 floors.
How many flats are there in Aria?
MahaRERA lists 515 units (513 residential, 2 other).
How many homes in Aria are booked?
107 of 515 homes were booked as per MahaRERA on 20 Nov 2026.
Who is the builder of Aria?
The promoter registered with MahaRERA is Aurigaa Realtors. Our register has 4 Pune projects by Aurigaa Realtors.
Where is Aria?
Aria is in Mulshi, Pune district (pincode 411033).
Which school is nearest to Aria?
S.B. Patil Public School (SBPPS) Ravet, Pune, about 2.3 km away in a straight line from the map position; the drive is longer.
How far is Aria from Pune Airport?
About 18.4 km in a straight line from the map position; the drive is longer.
How far is Aria from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?
About 4.6 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Aria.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 15 Apr 2026
- Dates and homes bookedFrom MahaRERA
Checked 8 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 8 Nov 2026
- Location and nearbyGathered and checked
Checked 8 Nov 2026
- DescriptionGathered and checked
Checked 8 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (8 Nov 2026)
- Project facts and amenitiesGathered and checked
The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (8 Nov 2026)
Get the price sheet and floor plans for ARIA
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.