The Ridges 41, Hinjawadi
See the site from above todayby Aurigaa Realtors · Hinjawadi, Mulshi, Pune district · 411057
- Homes
- 2, 3, 4 BHK
- Price
- from ₹90 L
- EMI about ₹62,483 a month
- Possession
- Apr 2030
- completion filed with MahaRERA
- Booked
- 342 of 628
- 45 booked in the last 30 days
Avasetu's read (from MahaRERA data, 16 Nov 2026)
The project has 342 of 628 homes booked, which is 54%. That trails behind 57 similar Hinjawadi projects running at about 61%, though 45 more homes were booked between 14 Oct 2026 and 13 Nov 2026. The completion date filed with MahaRERA is 20 Apr 2030.
What stands out
As of 16 Nov 2026, from MahaRERA and the sources below.
- This phase brings 628 homes, which is a larger count than 124 of 142 active registrations in the neighborhood.
- 54% of homes booked: Buyers have taken 342 of 628 homes, placing booking levels slightly behind the area trend where similar projects are at about 61%.
- Completion set for 20 Apr 2030: The finish date was originally registered as 20 Dec 2029, and MahaRERA's order added the 4 months that set the current timeline.
Updated 23 Nov 2026
Price
2 BHK
₹90 L – ₹1.22 Cr
from 970 sq ft · ₹9,278/sq ft
Last checked 23 Nov 2026
All-in cost of the 2 BHK at ₹90 L: about ₹1.01 Cr
Price (agreement value) ₹90 L GST (5%) ₹4.5 L Stamp duty (7%) ₹6.3 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.01 Cr 3 BHK
₹1.51 Cr – ₹1.65 Cr
from 1,272 sq ft · ₹11,871/sq ft
Last checked 23 Nov 2026
All-in cost of the 3 BHK at ₹1.51 Cr: about ₹1.69 Cr
Price (agreement value) ₹1.51 Cr GST (5%) ₹7.55 L Stamp duty (7%) ₹10.57 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.69 Cr 4 BHK
₹2.06 Cr – ₹2.08 Cr
from 1,612 sq ft · ₹12,779/sq ft
Last checked 23 Nov 2026
All-in cost of the 4 BHK at ₹2.06 Cr: about ₹2.31 Cr
Price (agreement value) ₹2.06 Cr GST (5%) ₹10.3 L Stamp duty (7%) ₹14.42 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹2.31 Cr
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹62,483 a monthOn a ₹72 L loan (80% of ₹90 L) at 8.5% for 20 years. Ask your bank for its rate.
Rough price guide for The Ridges 41
- 5 BHK about ₹2.5 – 2.9 Cr
Our own rounded guide, checked against the area on 23 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.
What new homes in Hinjawadi usually ask
- 1 BHK about ₹70 – 85 L (4 projects)
- 2 BHK about ₹75 L – ₹1.1 Cr (44 projects)
- 2.5 BHK about ₹85 L – ₹1.4 Cr (4 projects)
- 3 BHK about ₹1 – 1.6 Cr (43 projects)
- 3.5 BHK about ₹1.6 – 2.1 Cr (6 projects)
- 4 BHK about ₹1.9 – 2.7 Cr (13 projects)
- 4.5 BHK about ₹1.8 – 2.2 Cr (5 projects)
- 5 BHK about ₹2 – 2.7 Cr (3 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Hinjawadi, rounded. Use it to judge an offer, not as a price.
Hinjawadi average ₹11,406/sq ft across 20 projectsThe middle asking price per sq ft of other projects in Hinjawadi.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
The Ridges 41 from above, today
The Ridges 41, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Jan 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.
Nov 2022 Jan 2024 Jan 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Jan–Mar 2026 (looked Nov 2026)
Shadows from tall structures lengthen across the area.
Registered with MahaRERA Apr 2024 · possession filed for Apr 2030
Satellite imagery shows minimal activity until ground clearing begins around late 2022, following the April 2024 registration for The Ridges 41. Tall building shadows emerge to the northwest in later winter seasons.
The seasons before
- Oct–Dec 2024Dark shadows from tall structures appear northwest of the ring.
- Apr–May 2024Little change after April 2024 registration.
- Jan–Mar 2024Sparse vegetation remains inside the ring prior to registration.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2 (1 earlier seasons)
- Jan–Mar 2023Plant cover decreases as ground preparation continues near existing structures.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.
Flat sizes
- 2 BHK: 792 to 797 sq ft, carpet area
- 3 BHK: 1,270 sq ft, carpet area
- 4 BHK: 1,600 sq ft, carpet area
Your agreement for sale states the final carpet area.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)1.6 km
- Baner-Balewadi High Street3.5 km
- Pune Railway Station14.9 km
- Pune Airport (Lohegaon)17.5 km
Nearby
- ShoppingStreets of Europe1.5 km
- Industrial areaSoftware Technology Parks of India1.7 km
- Bus standWakad Chowk2.6 km
- ShoppingGrand Highstreet2.6 km
- ShoppingPhoenix Mall of the Millennium2.9 km
Straight-line distances; the drive is longer. Places: Google Maps.
MahaRERA record
From MahaRERA, read 16 Nov 2026Possession date
20 Apr 2030
The completion date filed with MahaRERA is 20 Apr 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 20 Dec 2029.
The Ridges 41: what changed, as we read it
45 more homes booked between 14 Oct 2026 and 13 Nov 2026: 297 to 342, of 628 homes.
- 13 Nov 2026: 342 booked
- 14 Oct 2026: 297 booked
Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.
Beside other Hinjawadi projects
Worked out by Avasetu- Homes booked
- 54%
- The middle of 57 Hinjawadi projects registered within a year of it: 61%.
- Completion date
- Not moved by the builder
- 47 of 150 Hinjawadi projects being built moved theirs 3 months or more.
From MahaRERA records read 16 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 342 of 628
- Towers
- 3 in this registration
- The tallest has 41 floors.
- Registered on
- 4 Apr 2024
- MahaRERA registration
- P52100055581
- Listed or updated on MahaRERA 5 Aug 2024.
- Promoter (builder)
- Aurigaa Realtors
- Project type
- Residential / Group Housing
- Pincode
- 411057
Check before you book
From MahaRERA- Towers go up to 41 floors. Ask how many lifts serve your tower and how many homes share them.
Tower by tower
3 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| TOWER 27 A BUILDING | 41 | 210 | 0 |
| TOWER 28 B BUILDING | 41 | 210 | 0 |
| TOWER 29 C BUILDING | 41 | 208 | 0 |
As filed with MahaRERA (sanctioned floors).
Aurigaa Realtors: track record
From MahaRERA recordsAurigaa Realtors has 4 projects in our MahaRERA register for Pune.
- MIRAI PHASE-Icompletion filed 31 Dec 2026
- ARYABANcompletion filed 31 Dec 2027
- ARIAcompletion filed 30 Apr 2030
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Hinjawadi
- Aventisfrom ₹89.5 L · possession Oct 2030About the same starting price as The Ridges 41
- Jaijinendra Nilaypossession Jun 2030
- Gera Joy on The Tree Tops Project A2, 3 BHK · from ₹77.2 L · possession Jul 2030Starts ₹13 L lower than The Ridges 41
- Kohinoor Regalia Towers2 BHK · from ₹1.18 Cr · possession Oct 2030Starts ₹28 L higher than The Ridges 41
- Leela Heights2, 3 BHK · from ₹91.87 L · possession Dec 2030About the same starting price as The Ridges 41
- Luxton2, 3 BHK · from ₹1.07 Cr · possession Oct 2030Starts ₹17 L higher than The Ridges 41
More by Aurigaa Realtors
FAQ
What is the price of The Ridges 41?
2 BHK: ₹90 L to ₹1.22 Cr; 3 BHK: ₹1.51 Cr to ₹1.65 Cr; 4 BHK: ₹2.06 Cr to ₹2.08 Cr, checked on 23 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of The Ridges 41?
The completion date filed with MahaRERA is 20 Apr 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of The Ridges 41?
The Ridges 41 is registered with MahaRERA as P52100055581.
How many towers and floors does The Ridges 41 have?
MahaRERA lists 3 buildings, the tallest with 41 floors.
How many flats are there in The Ridges 41?
MahaRERA lists 628 units.
How many homes in The Ridges 41 are booked?
342 of 628 homes were booked as per MahaRERA on 16 Nov 2026.
Who is the builder of The Ridges 41?
The promoter registered with MahaRERA is Aurigaa Realtors. Our register has 4 Pune projects by Aurigaa Realtors.
Where is The Ridges 41?
The Ridges 41 is in 411057, Mulshi, Pune district (pincode 411057).
How far is The Ridges 41 from Pune Airport?
About 17.5 km in a straight line from the map position; the drive is longer.
How far is The Ridges 41 from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?
About 1.6 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to The Ridges 41.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 5 Aug 2024
- Dates and homes bookedFrom MahaRERA
Checked 23 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 16 Nov 2026
- Location and nearbyGathered and checked
Checked 23 Nov 2026
- DescriptionGathered and checked
Checked 23 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (23 Nov 2026)
- Rough price guideGathered and checked
An asking price seen on one site, rounded and checked against the area (23 Nov 2026)
- Home sizesGathered and checked
The builder's site, or two property sites that agree
Get the price sheet and floor plans for THE RIDGES 41
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.