Skip to main contentSkip to navigation
Birla Evam Phase 1, picture 1
From House Deal's listing
MahaRERA registered PR1261012500295Verify on MahaRERA (opens in a new tab)Early stage

Birla Evam Phase 1, Manjari

See the site from above today

by Vypak Properties Private Limited · Manjari, Haveli, Pune district · 412307

Homes
2 & 3 BHK
Price
from ₹78 L
EMI about ₹54,152 a month
Possession
Oct 2031
completion filed with MahaRERA
Booked
524 of 928
524 booked in the last 30 days

Listed by House DealSee it on House Deal's page →

Avasetu's read (from MahaRERA data, 16 Nov 2026)

This project is selling faster than similar ones, with 56% booked, and 524 homes booked in a month. The completion date filed is 30 Oct 2031. You may want to ask the builder about the construction pace to meet this date.

What stands out

As of 20 Nov 2026, from MahaRERA and the sources below.

  • 30 Oct 2031 completion date: The builder originally filed for a June 2031 completion. A MahaRERA order added 4 months to the timeline for most projects in August 2026, which accounts for the entire difference in the current date.
  • This registration includes 928 homes across 2 buildings, which is a high density of about 464 homes in each tower.

Updated 21 Nov 2026

Pictures

Birla Evam Phase 1, picture 2
Birla Evam Phase 1, picture 3
Birla Evam Phase 1, picture 4
Birla Evam Phase 1, picture 5
Birla Evam Phase 1, picture 6
Birla Evam Phase 1, picture 7
Birla Evam Phase 1, picture 8
Birla Evam Phase 1, picture 9
Birla Evam Phase 1, picture 10

From House Deal's listing. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Sample flat videos

  • 2 BHK sample flat · from House Deal · Watch
  • Project video · from House Deal · Watch

Birla Evam Phase 1 in a short video

MahaRERA PR1261012500295 · 17.8 seconds
Open the video on its own page

Price

On offer

Listed by House Deal

From ₹78 L

2 & 3 BHK · apartments · 723 to 1,122 sq ft carpet

HomeCarpet areaPricePer sq ft
2 BHK723 sq ft₹78 L₹10,788/sq ft
2 BHK805 sq ft₹85 L₹10,559/sq ft
3 BHK975 sq ft₹1.07 Cr₹10,974/sq ft
3 BHK1,122 sq ft₹1.26 Cr₹11,230/sq ft

With a home loan, your own cash for the 2 BHK: about ₹21.36 LYour own cash, about: the part banks may not lend (RBI: 75% to 90% of the price is the most a home loan covers), stamp duty 7% (6% if a woman buys) and registration up to ₹30,000. Add GST (5% on homes being built) if the price leaves it out.

EMI, as an example: about ₹54,152 a monthOn a ₹62.4 L loan (80% of the price) at 8.5% for 20 years. Ask your bank for its rate.

All-in cost of the 2 BHK at ₹78 L: about ₹87.66 L
Price (agreement value)As quoted, before taxes.₹78 L
GST (5%)On a home being built.₹3.9 L
Stamp duty (7%)The rate inside PMC and PCMC limits; 6% if a woman buys. Charged on the ready reckoner value instead when that is higher.₹5.46 L
Registration (1%, at most ₹30,000)₹30,000
Total before the builder's charges₹87.66 L

Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

From the agent's listing, 20 Nov 2026.

Want this at today's price?

Prices change. The Avasetu team confirms today's price, what is still available and the full cost.

Ask for the current offer

Birla Evam Phase 1 from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Birla Evam Phase 1, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Jan 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Birla Evam Phase 1 from above, satellite picture of Nov 2022
    Nov 2022
  2. Birla Evam Phase 1 from above, satellite picture of Jan 2024
    Jan 2024
  3. Birla Evam Phase 1 from above, satellite picture of Jan 2025
    Jan 2025
  4. Birla Evam Phase 1 from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Work expands following the July 2025 registration, showing clear building footprints.

possession filed for Oct 2031

Month by month, Jan 2021 to Nov 2026: 43 clear months, October to May (the monsoon is under cloud).

Registered with MahaRERA in Jul 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

The seasons before

  1. Apr–May 2026Little change, active construction footprints visible inside the ring.
  2. Jan–Mar 2026Building footprints and structural foundations emerge within the ring.
  3. Oct–Dec 2025Bright structures and construction activity appear around the ring.
Construction proof from space: Jan 2021 to Nov 2026, Copernicus Sentinel-2 (13 earlier seasons)
  1. Apr–May 2025Little change, dry earth and the intersecting road persist.
  2. Jan–Mar 2025Little change, bare soil and the new road are visible.
  3. Oct–Dec 2024New access road crosses the ring; bare earth surrounds it.
  4. Apr–May 2024Little change, bare ground and faint access tracks visible.
  5. Jan–Mar 2024Bare earth dominates the ring with minimal plant cover left.
  6. Oct–Dec 2023Seasonal green growth appears patchily across the project site.
  7. Apr–May 2023Little change, dry soil and sparse patches inside the ring.
  8. Jan–Mar 2023Ground remains cleared with sparse vegetation and dirt tracks visible.
  9. Oct–Dec 2022Scattered greenery returns across the cleared ground in the ring.
  10. Jan–Mar 2022Ground clearing begins inside the ring, reducing plant cover significantly.
  11. Oct–Dec 2021Monsoon greening covers the ring area with dense vegetation.
  12. Apr–May 2021Little change, dry vegetation remains visible within the ring.
  13. Jan–Mar 2021Ring shows dense plants and trees with no structures present.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Magarpatta City5.9 km
  • World Trade Center, Kharadi6.4 km
  • EON IT Park, Kharadi6.4 km
  • Pune Airport (Lohegaon)11.4 km

Nearby

  • Railway stationManjari Budruk1.4 km
  • CollegePDEA's Annasaheb Magar Mahavidyalaya3 km
  • Bus standAkashwwani3.9 km
  • SchoolChatrabhuj Narsee School - Amanora, Pune4.2 km
  • Railway stationLoni4.3 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 20 Nov 2026

Possession date

30 Oct 2031

The completion date filed with MahaRERA is 30 Oct 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Jun 2031.

Birla Evam Phase 1: what changed, as we read it

524 more homes booked between 13 Oct 2026 and 12 Nov 2026: 0 to 524, of 928 homes.

13 Oct 202612 Nov 2026
  • 12 Nov 2026: 524 booked
  • 13 Oct 2026: 0 booked

Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.

Beside other Manjari projects

Worked out by Avasetu
Homes booked
56%
The middle of 14 Manjari projects registered within a year of it: 16%.
Completion date
Not moved by the builder
12 of 36 Manjari projects being built moved theirs 3 months or more.

From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
524 of 928
Towers
2 in this registration
The tallest has 30 floors. 12 in the whole project.
Units
928
904 homes, 24 shops or offices.
Registered on
16 Jul 2025
MahaRERA registration
PR1261012500295
Listed or updated on MahaRERA 16 Jul 2025.
Promoter (builder)
Vypak Properties Private Limited
Project type
Residential / Group Housing
Pincode
412307

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Completion is filed for Oct 2031, about 4 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
  • Towers go up to 30 floors. Ask how many lifts serve your tower and how many homes share them.
  • 24 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

4 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
Birla Evam Phase 13022024
Birla Evam Phase 1302280
Birla Evam Phase 1302280
Birla Evam Phase 1302280

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
16.5 acres

Last checked 20 Nov 2026. MahaRERA counts where they differ.

Vypak Properties Private Limited: track record

From MahaRERA records

Vypak Properties Private Limited has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Manjari

FAQ

What is the price of Birla Evam Phase 1?

A local agent quotes from ₹78 L for Birla Evam Phase 1. Prices change often: ask for today's price and what it includes.

What is the possession date of Birla Evam Phase 1?

The completion date filed with MahaRERA is 30 Oct 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Birla Evam Phase 1?

Birla Evam Phase 1 is registered with MahaRERA as PR1261012500295.

How many towers and floors does Birla Evam Phase 1 have?

MahaRERA lists 2 buildings, the tallest with 30 floors.

How many flats are there in Birla Evam Phase 1?

MahaRERA lists 928 units (904 residential, 24 other).

How many homes in Birla Evam Phase 1 are booked?

524 of 928 homes were booked as per MahaRERA on 20 Nov 2026.

Who is the builder of Birla Evam Phase 1?

The promoter registered with MahaRERA is Vypak Properties Private Limited.

Where is Birla Evam Phase 1?

Birla Evam Phase 1 is in Manjari, Haveli, Pune district (pincode 412307).

Which school is nearest to Birla Evam Phase 1?

Chatrabhuj Narsee School - Amanora, Pune, about 4.2 km away in a straight line from the map position; the drive is longer.

Which railway station is nearest to Birla Evam Phase 1?

Manjari Budruk, about 1.4 km away in a straight line from the map position; the drive is longer.

How far is Birla Evam Phase 1 from Pune Airport?

About 11.4 km in a straight line from the map position; the drive is longer.

How far is Birla Evam Phase 1 from Magarpatta City?

About 5.9 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Birla Evam Phase 1.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 16 Jul 2025

  • Dates and homes bookedFrom MahaRERA

    Checked 20 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 20 Nov 2026

  • Location and nearbyGathered and checked

    Checked 20 Nov 2026

  • DescriptionGathered and checked

    Checked 20 Nov 2026

  • PriceGathered and checked

    The agent's price sheet (20 Nov 2026)

Get the price sheet and floor plans for Birla Evam Phase 1

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment