Skip to main contentSkip to navigation
MahaRERA registered P52100077412Verify on MahaRERA (opens in a new tab)Early stage

Capri, Ravet

See the site from above today

by Knest Constructions LLP · Ravet, Haveli, Pune district · 412101

Homes
3 BHK
Price
from ₹1.35 Cr
EMI about ₹93,725 a month
Possession
Nov 2030
completion filed with MahaRERA
Booked
63 of 350

What stands out

As of 12 Nov 2026, from MahaRERA and the sources below.

  • 63 of 350 homes are booked, about 18%, which is below the area median of 39%.
  • With 350 units, it has more homes than 169 of 192 comparable projects.

Updated 21 Nov 2026

Price

  • 3 BHK

    ₹1.35 Cr – ₹1.45 Cr

    Last checked 20 Nov 2026

    All-in cost of the 3 BHK at ₹1.35 Cr: about ₹1.51 Cr
    Price (agreement value)₹1.35 Cr
    GST (5%)₹6.75 L
    Stamp duty (7%)₹9.45 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.51 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹93,725 a monthOn a ₹1.08 Cr loan (80% of ₹1.35 Cr) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Ravet usually ask

  • 2 BHK about ₹60 – 85 L (47 projects)
  • 2.5 BHK about ₹90 L – ₹1.1 Cr (3 projects)
  • 3 BHK about ₹85 L – ₹1.2 Cr (50 projects)
  • 4 BHK about ₹1.6 – 2 Cr (8 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Ravet, rounded. Use it to judge an offer, not as a price.

Ravet average ₹9,812/sq ft across 30 projectsThe middle asking price per sq ft of other projects in Ravet.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Capri from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Capri, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Capri from above, satellite picture of Nov 2022
    Nov 2022
  2. Capri from above, satellite picture of Jan 2024
    Jan 2024
  3. Capri from above, satellite picture of Feb 2025
    Feb 2025
  4. Capri from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Development activity continues with visible structures near the pin.

Registered with MahaRERA Aug 2024 · possession filed for Nov 2030

Season by season, Jan 2023 to Oct 2026: 12 seasons, October to May (the monsoon is under cloud).

The site starts as vacant land through 2023. Following the August 2024 registration, construction activity becomes visible with new building footprints and structural work appearing inside and around the ring through 2026.

The seasons before

  1. Apr–May 2026Little change, construction footprints maintained.
  2. Jan–Mar 2026Clear structural footprints visible matching recent project registrations.
  3. Oct–Dec 2025Building shapes develop further inside and around the ring.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2 (8 earlier seasons)
  1. Apr–May 2025Little change, ongoing work visible at the project site.
  2. Jan–Mar 2025Structure outlines appear within the ring, showing active development.
  3. Oct–Dec 2024Work shows after the August 2024 registration with initial footprint changes.
  4. Apr–May 2024Little change, dry open land remains.
  5. Jan–Mar 2024Sparse vegetation and minor ground disturbance near the pin.
  6. Oct–Dec 2023Slight brightening, possibly ground work or materials staged.
  7. Apr–May 2023Little change, open land and roads visible.
  8. Jan–Mar 2023Slight vegetation variation, no major building footprints inside the ring.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)7 km
  • Baner-Balewadi High Street10 km
  • Pune Airport (Lohegaon)19.5 km
  • Pune Railway Station19.7 km

Nearby

  • SchoolS.B. Patil Public School (SBPPS) Ravet, Pune0.4 km
  • TempleISKCON (Shree Govinda Dham) Ravet1.4 km
  • ShoppingD Mart Ravet1.8 km
  • CollegeD.Y. Patil College of Engineering2 km
  • CollegeD. Y. Patil International University2.1 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Amenities

  • clubhouse.
  • 24/7 security.

Last checked 20 Nov 2026.

MahaRERA record

From MahaRERA, read 12 Nov 2026

Possession date

30 Nov 2030

The completion date filed with MahaRERA is 30 Nov 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Jul 2030.

Beside other Ravet projects

Worked out by Avasetu
Homes booked
18%
The middle of 65 Ravet projects registered within a year of it: 39%.
Completion date
Not moved by the builder
56 of 205 Ravet projects being built moved theirs 3 months or more.

From MahaRERA records read 12 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
63 of 350
Towers
4 in this registration
The tallest has 22 floors.
Units
350
208 homes, 142 shops or offices.
Registered on
13 Aug 2024
MahaRERA registration
P52100077412
Listed or updated on MahaRERA 2 May 2025.
Promoter (builder)
Knest Constructions LLP
Project type
Others
Pincode
412101

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA and checked sites
  • Completion is filed for Nov 2030, about 4 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
  • Only 18% of homes are booked 2 years after registration. Slow sales can slow building: check the progress the builder files with MahaRERA every quarter.
  • About 156 homes per acre (350 homes on 2.25 acres, from two property sites that agree). Towers stand close: ask how far your tower is from the next and which flats face another tower.
  • 142 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

4 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
A-Wing229613
B-Wing59613
C-Wing Commercial30116
D-Wing3160

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
2.25 acres

Last checked 20 Nov 2026. MahaRERA counts where they differ.

Knest Constructions LLP: track record

From MahaRERA records

Knest Constructions LLP has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Ravet

FAQ

What is the price of Capri?

3 BHK: ₹1.35 Cr to ₹1.45 Cr, checked on 20 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Capri?

The completion date filed with MahaRERA is 30 Nov 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Capri?

Capri is registered with MahaRERA as P52100077412.

How many towers and floors does Capri have?

MahaRERA lists 4 buildings, the tallest with 22 floors.

How many flats are there in Capri?

MahaRERA lists 350 units (208 residential, 142 other).

How many homes in Capri are booked?

63 of 350 homes were booked as per MahaRERA on 12 Nov 2026.

Who is the builder of Capri?

The promoter registered with MahaRERA is Knest Constructions LLP.

Where is Capri?

Capri is in 412101, Haveli, Pune district (pincode 412101).

Which school is nearest to Capri?

S.B. Patil Public School (SBPPS) Ravet, Pune, about 0.4 km away in a straight line from the map position; the drive is longer.

How far is Capri from Pune Airport?

About 19.5 km in a straight line from the map position; the drive is longer.

How far is Capri from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Capri.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 2 May 2025

  • Dates and homes bookedFrom MahaRERA

    Checked 20 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 8 Nov 2026

  • Location and nearbyGathered and checked

    Checked 20 Nov 2026

  • DescriptionGathered and checked

    Checked 20 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (20 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (20 Nov 2026)

Get the price sheet and floor plans for CAPRI

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment