Capri from space, 2023 to 2026
The site starts as vacant land through 2023. Following the August 2024 registration, construction activity becomes visible with new building footprints and structural work appearing inside and around the ring through 2026.
12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Development activity continues with visible structures near the pin.
- Apr–May 2026Little change, construction footprints maintained.
- Jan–Mar 2026Clear structural footprints visible matching recent project registrations.
- Oct–Dec 2025Building shapes develop further inside and around the ring.
- Apr–May 2025Little change, ongoing work visible at the project site.
- Jan–Mar 2025Structure outlines appear within the ring, showing active development.
- Oct–Dec 2024Work shows after the August 2024 registration with initial footprint changes.
- Apr–May 2024Little change, dry open land remains.
- Jan–Mar 2024Sparse vegetation and minor ground disturbance near the pin.
- Oct–Dec 2023Slight brightening, possibly ground work or materials staged.
- Apr–May 2023Little change, open land and roads visible.
- Jan–Mar 2023Slight vegetation variation, no major building footprints inside the ring.
Capri: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.