Skip to main contentSkip to navigation
Greenscape 60e93e57d9 2b5bd3fc72DOSTI REALTY LIMITED logo
The builder's picture
MahaRERA registered P52100049942Verify on MahaRERA (opens in a new tab)

Dosti Greenscapes, Hadapsar

Filed on MahaRERA as Dosti Greenscapes - Phase 1

See the site from above today

by Dosti Realty Limited · Hadapsar, Haveli, Pune district · 411013

Possession
from Dec 2027
its parts filed Dec 2027 to Jun 2031
Booked
798 of 1,148
53 booked in the last 36 days

What stands out

As of 12 Nov 2026, from MahaRERA and the sources below.

  • 96% of homes booked: MahaRERA shows 323 of 335 homes booked.
  • Buildings in this registration: 4, up to 23 floors.
  • 96% booked here; the middle of 20 Hadapsar projects registered within a year of it is 73%.
  • Compared with other projects still being built in Hadapsar: Compared with other projects still being built in Hadapsar: its tallest building is higher than that of 8 of 24.
  • Completion date filed with MahaRERA: 31 Dec 2027.

Updated 21 Nov 2026

Pictures

Amenities x eb6365cd2c 10f4008d5a
New Project 0d59b6ca73 3a8ec2b122
New Project 73f784b562 a488296c0f
New Project 6f38cf9e27 5f03b58125

From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Price

No price for Dosti Greenscapes is published yet.

What new homes in Hadapsar usually ask

  • 2 BHK about ₹60 L – ₹1.2 Cr (12 projects)
  • 3 BHK about ₹1.2 – 1.6 Cr (8 projects)
  • 4 BHK about ₹1.7 – 3.25 Cr (3 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Hadapsar, rounded. Use it to judge an offer, not as a price.

Get the exact price for your home

The Avasetu team gets you the current price sheet for the size you want, with parking and all other charges.

Ask for the current offer

Dosti Greenscapes from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Dosti Greenscapes, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Mar 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Dosti Greenscapes from above, satellite picture of Nov 2022
    Nov 2022
  2. Dosti Greenscapes from above, satellite picture of Jan 2024
    Jan 2024
  3. Dosti Greenscapes from above, satellite picture of Mar 2025
    Mar 2025
  4. Dosti Greenscapes from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Fully formed building blocks visible within the ring area.

Registered with MahaRERA Mar 2023 · possession filed for from Dec 2027

Season by season, Jan 2022 to Oct 2026: 14 seasons, October to May (the monsoon is under cloud).

The ground around the project's map pin, seen by the Sentinel-2 satellite once each dry season from Jan 2021 to Oct 2026. Plants there were cleared between Jan 2021 and Jan 2022: the satellite's infrared shows plant cover falling from 86% to 39%.

The seasons before

  1. Apr–May 2026Ground cleared
  2. Jan–Mar 2026Multiple tall structures casting shadows within the ring.
  3. Oct–Dec 2025Dense building footprints clearly visible inside the ring.
Construction proof from space: Jan 2022 to Oct 2026, Copernicus Sentinel-2 (10 earlier seasons)
  1. Apr–May 2025Little change; established structures occupy the ring area.
  2. Jan–Mar 2025Advanced structural footprints and shadows indicate vertical growth.
  3. Oct–Dec 2024Further development of building structures evident within the ring.
  4. Apr–May 2024Little change; structural layouts remain visible.
  5. Jan–Mar 2024Building footprints expand inside the ring, matching project timelines.
  6. Oct–Dec 2023Construction activity increases with new structural footprints forming.
  7. Apr–May 2023Little change; ongoing earthwork visible inside the ring.
  8. Jan–Mar 2023Early foundations and cleared earth visible before Phase 1 registration.
  9. Oct–Dec 2022Initial groundwork appears inside the ring following registrations.
  10. Jan–Mar 2022Bare soil visible inside the ring with no active construction footprints.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Magarpatta City1.5 km
  • Pune Railway Station5.3 km
  • World Trade Center, Kharadi6 km
  • EON IT Park, Kharadi6.2 km

Nearby

  • BankJanaseva Sahakari Bank1.9 km
  • ShoppingSeasons Mall2 km
  • Bus standHadapsar Gadital2.2 km
  • ShoppingAmanora Mall2.2 km
  • Railway stationHadapsar2.6 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 12 Nov 2026

Possession date

31 Dec 2027 to 30 Jun 2031

The completion dates filed with MahaRERA for its 5 registrations; each is in the table of towers and phases below.

For P52100049942: 31 Dec 2027. Completion date filed with MahaRERA. Not moved since registration.

The record

Homes booked
798 of 1,148
Across all 5 of its MahaRERA registrations. P52100049942 alone: 327 of 335.
Towers
4 in this registration
The tallest has 23 floors.
Registered on
6 Mar 2023
Main MahaRERA registration
P52100049942
Listed or updated on MahaRERA 11 Feb 2026.
Promoter (builder)
Dosti Realty Limited
Project type
Residential / Group Housing
Pincode
411013

Open the MahaRERA record (opens in a new tab)

Tower by tower

5 registrations, 4 buildings

Towers and phases (5 registrations)

From MahaRERA

MahaRERA holds Dosti Greenscapes as 5 registrations. Together they list 1,148 homes, 798 booked.

RegistrationCompletion filedBooked
Dosti Greenscapes - Phase 1P52100049942 (opens in a new tab)31 Dec 2027327 of 335
Dosti Greenscapes - Phase 4P52100077092 (opens in a new tab)31 Dec 2027at registration 31 Aug 202748 of 98
Dosti Greenscapes - Phase 2P52100051041 (opens in a new tab)30 Aug 2028at registration 30 Apr 2028185 of 258
Dosti Greenscapes - Phase 3P52100077059 (opens in a new tab)31 Dec 2028at registration 31 Aug 2028234 of 334
Dosti Greenscapes - Phase 5PM1264042601721 (opens in a new tab)30 Jun 20314 of 123

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
Dosti Greenscape - Phase 1 - Wing A/A1 Wing23810
Dosti Greenscape - Phase 1 - Wing B / A1 Wing23840
Dosti Greenscape - Phase 1 - Wing C / B1 Wing23840
Dosti Greenscape - Phase 1 - Wing D / C1A Wing23860

As filed with MahaRERA (sanctioned floors).

Dosti Realty Limited: track record

From MahaRERA records

Dosti Realty Limited has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Hadapsar

FAQ

What is the price of Dosti Greenscapes?

No price for Dosti Greenscapes is published yet. Ask through the enquiry form on this page for the current price.

What is the possession date of Dosti Greenscapes?

The 5 MahaRERA registrations of Dosti Greenscapes have filed completion dates from 31 Dec 2027 to 30 Jun 2031. For P52100049942: The completion date filed with MahaRERA is 31 Dec 2027.

What is the MahaRERA number of Dosti Greenscapes?

Dosti Greenscapes is registered with MahaRERA in 5 parts (towers or phases): P52100049942, P52100077092, P52100051041, P52100077059, PM1264042601721.

How many towers and floors does Dosti Greenscapes have?

MahaRERA lists 4 buildings in registration P52100049942, one of the project's 5, the tallest with 23 floors.

How many flats are there in Dosti Greenscapes?

MahaRERA lists 1148 units across all 5 of its MahaRERA registrations; P52100049942 has 335.

How many homes in Dosti Greenscapes are booked?

798 of 1148 homes were booked as per MahaRERA on 12 Nov 2026, across all 5 of its MahaRERA registrations.

Who is the builder of Dosti Greenscapes?

The promoter registered with MahaRERA is Dosti Realty Limited.

Where is Dosti Greenscapes?

Dosti Greenscapes is in Haveli, Pune district (pincode 411013).

Which railway station is nearest to Dosti Greenscapes?

Hadapsar, about 2.6 km away in a straight line from the map position; the drive is longer.

How far is Dosti Greenscapes from Magarpatta City?

About 1.5 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Dosti Greenscapes.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 11 Feb 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 10 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 10 Nov 2026

  • Location and nearbyGathered and checked

    Checked 10 Nov 2026

  • DescriptionGathered and checked

    Checked 10 Nov 2026

Get the price sheet and floor plans for Dosti Greenscapes - Phase 1

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment