Dosti Greenscapes from space, 2022 to 2026
The ground around the project's map pin, seen by the Sentinel-2 satellite once each dry season from Jan 2021 to Oct 2026. Plants there were cleared between Jan 2021 and Jan 2022: the satellite's infrared shows plant cover falling from 86% to 39%.
14 seasons, Jan 2022 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Fully formed building blocks visible within the ring area.
- Apr–May 2026Ground cleared
- Jan–Mar 2026Multiple tall structures casting shadows within the ring.
- Oct–Dec 2025Dense building footprints clearly visible inside the ring.
- Apr–May 2025Little change; established structures occupy the ring area.
- Jan–Mar 2025Advanced structural footprints and shadows indicate vertical growth.
- Oct–Dec 2024Further development of building structures evident within the ring.
- Apr–May 2024Little change; structural layouts remain visible.
- Jan–Mar 2024Building footprints expand inside the ring, matching project timelines.
- Oct–Dec 2023Construction activity increases with new structural footprints forming.
- Apr–May 2023Little change; ongoing earthwork visible inside the ring.
- Jan–Mar 2023Early foundations and cleared earth visible before Phase 1 registration.
- Oct–Dec 2022Initial groundwork appears inside the ring following registrations.
- Jan–Mar 2022Bare soil visible inside the ring with no active construction footprints.
Dosti Greenscapes: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.