Skip to main contentSkip to navigation
Esbee Azura, picture 1Esbee Structura Private Limited logo
From House Deal's listing
MahaRERA registered PR1260002500988Verify on MahaRERA (opens in a new tab)Early stage

Esbee Azura, Keshav Nagar

by Esbee Structura Private Limited · Keshav Nagar, Pune · 411036

Homes
3 BHK
Price
from ₹1.05 Cr
EMI about ₹72,897 a month
Possession
Dec 2028
completion filed with MahaRERA
Booked
43 of 137

Listed by House DealSee it on House Deal's page →

What stands out

As of 27 Nov 2026, from MahaRERA and the sources below.

  • 31% of homes booked: Buyers have booked 43 of the 137 homes in this registration.
  • The project spreads 137 homes across two buildings reaching up to 15 floors on a 1-acre plot.
  • 2 BHK from ₹74 L: Two-bedroom units start at ₹74 L for 711 to 858 sq ft carpet area, while three-bedroom units start at ₹95 L from 932 sq ft.

Updated 27 Nov 2026

Pictures

Esbee Azura, picture 2
Esbee Azura, picture 3
Esbee Azura, picture 4
Esbee Azura, picture 5
Esbee Azura, picture 6
Esbee Azura, picture 7

From House Deal's listing. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Sample flat video

  • Sample flat · from House Deal · Watch

Price

On offer

Listed by House Deal

From ₹1.05 Cr

3 BHK · apartments · 919 to 932 sq ft carpet

HomeCarpet areaPricePer sq ft
3 BHK919 sq ft₹1.05 Cr₹11,425/sq ft
3 BHK932 sq ft₹1.06 Cr₹11,373/sq ft

With a home loan, your own cash for the 3 BHK: about ₹33.9 LYour own cash, about: the part banks may not lend (RBI: 75% to 90% of the price is the most a home loan covers), stamp duty 7% (6% if a woman buys) and registration up to ₹30,000. Add GST (5% on homes being built) if the price leaves it out.

EMI, as an example: about ₹72,897 a monthOn a ₹84 L loan (80% of the price) at 8.5% for 20 years. Ask your bank for its rate.

All-in cost of the 3 BHK at ₹1.05 Cr: about ₹1.18 Cr
Price (agreement value)As quoted, before taxes.₹1.05 Cr
GST (5%)On a home being built.₹5.25 L
Stamp duty (7%)The rate inside PMC and PCMC limits; 6% if a woman buys. Charged on the ready reckoner value instead when that is higher.₹7.35 L
Registration (1%, at most ₹30,000)₹30,000
Total before the builder's charges₹1.18 Cr

Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

From the agent's listing, 27 Nov 2026.

Want this at today's price?

Prices change. The Avasetu team confirms today's price, what is still available and the full cost.

Ask for the current offer

Floor plans

We send them to you on WhatsApp

Location

A map search by name. Open the map (opens in a new tab)

Around Esbee Azura

Measured from the Keshav Nagar centre, each with its source and date.

ToBy road9 am6 pm, back
World Trade Center, Kharadi2.1 km5-8 min6-10 min
EON IT Park, Kharadi2.6 km6-9 min7-11 min
Magarpatta Cybercity5 km13-26 min15-30 min
Kalyani Nagar offices (Cerebrum IT Park)7 km24-51 min26-54 min
Pune Airport (Lohegaon)15.8 km40 min38 min

Driving from the Keshav Nagar centre on a weekday, Google's typical traffic. Source: Google Maps (Routes API), typical weekday traffic · measured 28 Nov 2026

What's changing nearby

  • Keshavnagar-Kharadi bridgeBuilt, but residents say it is unclear whether the bridge is officially open: barricades near it keep being taken down by locals, and traffic still crowds the Chanchala Kodre bridge and Mundhwa Chowk.Status of 25 Nov 2026
  • Water in merged villagesBuilders must supply water in the 32 merged villages for three years or until PMC water supply begins, and PMRDA requires assured water supply before approving a building.Status of 31 Oct 2026

Being built around it

48 projects with 11,304 homes being built within 2 km, due 2026 to 2032.

From MahaRERA's register. Source: MahaRERA project register (our copy, read daily) · measured 28 Nov 2026

8 schools within 3 km: 7 CBSE, 1 ICSE.

Straight-line distance from the Keshav Nagar centre. No fees or ratings: they are rarely published reliably. Sources: CBSE affiliated schools (SARAS), CISCE school locator, Google Maps (school positions) · measured 29 Nov 2026

Asked rent, from 120 listings, Nov 2026

SizeA monthMiddleListingsYield
1 BHK₹18,000 to ₹26,500₹24,00032
2 BHK₹29,000 to ₹35,000₹32,000544.3%
3 BHK₹38,000 to ₹46,000₹44,000344.5%

What owners ask on listings, not what tenants pay; the middle half of asks. Yield: a year's middle rent over the middle asking price for that size. Sources: MagicBricks rent listings, NoBroker rent listings, Square Yards rent listings, Asking prices of new projects (Avasetu project pages) · measured 28 Nov 2026

MahaRERA record

From MahaRERA, read 27 Nov 2026

Possession date

31 Dec 2028

The completion date filed with MahaRERA is 31 Dec 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Aug 2028.

The record

Homes booked
43 of 137
Towers
2 in this registration
The tallest has 15 floors.
Registered on
29 Sep 2025
MahaRERA registration
PR1260002500988
Listed or updated on MahaRERA 16 Oct 2026.
Promoter (builder)
Esbee Structura Private Limited
Project type
Residential / Group Housing
Pincode
411036

Open the MahaRERA record (opens in a new tab)

Tower by tower

2 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
Wing A15600
Wing B15770

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 12 floors
Land
1 acres

Last checked 27 Nov 2026. MahaRERA counts where they differ.

Esbee Structura Private Limited: track record

From MahaRERA records

Esbee Structura Private Limited has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Keshav Nagar

FAQ

What is the price of Esbee Azura?

A local agent quotes from ₹1.05 Cr for Esbee Azura. Prices change often: ask for today's price and what it includes.

What is the possession date of Esbee Azura?

The completion date filed with MahaRERA is 31 Dec 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Esbee Azura?

Esbee Azura is registered with MahaRERA as PR1260002500988.

How many towers and floors does Esbee Azura have?

MahaRERA lists 2 buildings, the tallest with 15 floors.

How many flats are there in Esbee Azura?

MahaRERA lists 137 units.

How many homes in Esbee Azura are booked?

43 of 137 homes were booked as per MahaRERA on 27 Nov 2026.

Who is the builder of Esbee Azura?

The promoter registered with MahaRERA is Esbee Structura Private Limited.

Where is Esbee Azura?

Esbee Azura is in Keshav Nagar, Pune (pincode 411036).

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 16 Oct 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 27 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 20 Nov 2026

  • Location and nearbyGathered and checked

    Checked 27 Nov 2026

  • DescriptionGathered and checked

    Checked 27 Nov 2026

  • PriceGathered and checked

    The agent's price sheet (27 Nov 2026)

Get the price sheet and floor plans for Esbee Azura

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment