Skip to main contentSkip to navigation
Godrej Aqua Vista, picture 1Godrej Properties logo
From House Deal's listing
MahaRERA registered PM1260002500389Verify on MahaRERA (opens in a new tab)Early stage

Godrej Aqua Vista, Keshav Nagar

See the site from above today

by Godrej Properties · Keshav Nagar, Pune · 411036

Homes
1, 2 & 3 BHK
Price
from ₹80 L
EMI about ₹55,541 a month
Possession
Jul 2032
completion filed with MahaRERA
Booked
323 of 1,582

Listed by House DealSee it on House Deal's page →

Avasetu's read (from MahaRERA data, 21 Oct 2026)

With 323 of 1582 homes booked (20%), this project is booking faster than 17 similar Kharadi projects that are at about 0%. The completion date filed with MahaRERA is 19 Jul 2032. However, of 39 Godrej Properties projects in Pune with both dates on MahaRERA, 16 moved the completion date 3 months or more later.

What stands out

As of 28 Nov 2026, from MahaRERA and the sources below.

  • 20% of homes booked: Buyers have reserved 323 of the 1582 homes planned in this registration.
  • The completion date is 19 Jul 2032. MahaRERA's order added the 4 months to the original 19 Mar 2032 date.
  • The plan distributes 1582 flats across 7 towers reaching up to 32 floors, which comes to about 227 homes per acre.

Updated 21 Nov 2026

Pictures

Godrej Aqua Vista, picture 2
Godrej Aqua Vista, picture 3
Godrej Aqua Vista, picture 4
e9f42a23 f80f a6d3 e4af16e34d66
aecfa646 03c9 4b2b ba73 54ef189a00ee
Godrej Aqua Vista, from the builder's website
interior
interior
interior
interior
interior

From House Deal's listing and the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Sample flat video

  • 3 BHK sample flat · from House Deal · Watch

Godrej Aqua Vista in a short video

Godrej 2 and 3 BHK from ₹1.06 Cr · 17.8 seconds
Open the video on its own page

Price

On offer

Listed by House Deal

From ₹80 L

1, 2 & 3 BHK · apartments · 493 to 975 sq ft carpet

HomeCarpet areaPricePer sq ft
1 BHK493 sq ft₹80 L₹16,227/sq ft
1 BHK498 sq ft₹83 L₹16,667/sq ft
1 BHK522 sq ft₹90 L₹17,241/sq ft
2 BHK726 sq ft₹1.06 Cr₹14,601/sq ft
2 BHK752 sq ft₹1.12 Cr₹14,894/sq ft
3 BHK975 sq ft₹1.5 Cr₹15,385/sq ft

With a home loan, your own cash for the 1 BHK: about ₹21.9 LYour own cash, about: the part banks may not lend (RBI: 75% to 90% of the price is the most a home loan covers), stamp duty 7% (6% if a woman buys) and registration up to ₹30,000. Add GST (5% on homes being built) if the price leaves it out.

EMI, as an example: about ₹55,541 a monthOn a ₹64 L loan (80% of the price) at 8.5% for 20 years. Ask your bank for its rate.

All-in cost of the 1 BHK at ₹80 L: about ₹89.9 L
Price (agreement value)As quoted, before taxes.₹80 L
GST (5%)On a home being built.₹4 L
Stamp duty (7%)The rate inside PMC and PCMC limits; 6% if a woman buys. Charged on the ready reckoner value instead when that is higher.₹5.6 L
Registration (1%, at most ₹30,000)₹30,000
Total before the builder's charges₹89.9 L

Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

From the agent's listing, 20 Nov 2026.

Want this at today's price?

Prices change. The Avasetu team confirms today's price, what is still available and the full cost.

Ask for the current offer

Godrej Aqua Vista from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Godrej Aqua Vista, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Mar 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Godrej Aqua Vista from above, satellite picture of Nov 2022
    Nov 2022
  2. Godrej Aqua Vista from above, satellite picture of Jan 2024
    Jan 2024
  3. Godrej Aqua Vista from above, satellite picture of Mar 2025
    Mar 2025
  4. Godrej Aqua Vista from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Little change observed on the site.

Registered with MahaRERA Jul 2025 · possession filed for Jul 2032

Season by season, Jan 2024 to Oct 2026: 9 seasons, October to May (the monsoon is under cloud).

Registered with MahaRERA in Jul 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

The seasons before

  1. Apr–May 2026Little change visible in the area.
  2. Jan–Mar 2026Ground shows ongoing activity near the ring.
  3. Oct–Dec 2025Work shows after the Jul 2025 registration with slight ground disturbance.
Construction proof from space: Jan 2024 to Oct 2026, Copernicus Sentinel-2 (5 earlier seasons)
  1. Apr–May 2025Little change ahead of project registration.
  2. Jan–Mar 2025Ground remains cleared prior to the July 2025 registration.
  3. Oct–Dec 2024Little change in the ring area.
  4. Apr–May 2024Little change observed since last season.
  5. Jan–Mar 2024Ground continues to show bare soil and low vegetation.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • World Trade Center, Kharadi1.5 km
  • EON IT Park, Kharadi1.7 km
  • Magarpatta City3.2 km
  • Pune Airport (Lohegaon)6 km

Nearby

  • Industrial areaEon IT Park Pune1.6 km
  • Railway stationHadapsar2.3 km
  • ShoppingAmanora Mall2.5 km
  • ShoppingSeasons Mall2.7 km
  • Industrial areaInternational Tech Park Pune, Kharadi2.7 km

Straight-line distances; the drive is longer. Places: Google Maps.

Around Godrej Aqua Vista

Measured from the project's pin, each with its source and date.

ToBy road9 am6 pm, back
World Trade Center, Kharadi2.1 km5-8 min6-10 min
EON IT Park, Kharadi2.6 km6-9 min7-11 min
Magarpatta Cybercity5 km13-26 min15-30 min
Kalyani Nagar offices (Cerebrum IT Park)7 km24-51 min26-54 min
Pune Airport (Lohegaon)15.8 km40 min38 min

Driving from the project's pin on a weekday, Google's typical traffic. Source: Google Maps (Routes API), typical weekday traffic · measured 28 Nov 2026

What's changing nearby

  • Keshavnagar-Kharadi bridgeBuilt, but residents say it is unclear whether the bridge is officially open: barricades near it keep being taken down by locals, and traffic still crowds the Chanchala Kodre bridge and Mundhwa Chowk.Status of 25 Nov 2026
  • Water in merged villagesBuilders must supply water in the 32 merged villages for three years or until PMC water supply begins, and PMRDA requires assured water supply before approving a building.Status of 31 Oct 2026

Being built around it

47 projects with 9,803 homes being built within 2 km, due 2026 to 2032.

From MahaRERA's register. Source: MahaRERA project register (our copy, read daily) · measured 28 Nov 2026

8 schools within 3 km: 7 CBSE, 1 ICSE.

Straight-line distance from the project's pin. No fees or ratings: they are rarely published reliably. Sources: CBSE affiliated schools (SARAS), CISCE school locator, Google Maps (school positions) · measured 29 Nov 2026

Asked rent, from 120 listings within 2 km, Nov 2026

SizeA monthMiddleListingsYield
1 BHK₹18,000 to ₹26,500₹24,00032
2 BHK₹29,000 to ₹35,000₹32,000544.3%
3 BHK₹38,000 to ₹46,000₹44,000344.5%

What owners ask on listings, not what tenants pay; the middle half of asks. Yield: a year's middle rent over the middle asking price for that size. Sources: MagicBricks rent listings, NoBroker rent listings, Square Yards rent listings, Asking prices of new projects (Avasetu project pages) · measured 28 Nov 2026

Work nearby

Companies from each hub's own tenant list; straight-line distance. Source: MahaRERA project register (our copy) and each hub's own tenant list · measured 28 Nov 2026

MahaRERA record

From MahaRERA, read 28 Nov 2026

Possession date

19 Jul 2032

The completion date filed with MahaRERA is 19 Jul 2032; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 19 Mar 2032.

The record

Homes booked
323 of 1,582
Towers
7 in this registration
The tallest has 32 floors.
Units
1,582
1,501 homes, 81 shops or offices.
Registered on
28 Jul 2025
MahaRERA registration
PM1260002500389
Listed or updated on MahaRERA 8 Jun 2026.
Promoter (builder)
Oxford Realty LLP
Project type
Mixed
Pincode
411036

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA and checked sites
  • Completion is filed for Jul 2032, about 5 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
  • About 227 homes per acre (1,582 homes on 6.98 acres, from two property sites that agree). Towers stand close: ask how far your tower is from the next and which flats face another tower.
  • Towers go up to 32 floors. Ask how many lifts serve your tower and how many homes share them.
  • 81 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

7 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
Tower 121710825
Tower 133123921
Tower 143224718
Tower 153221917
Tower 16302190
Tower 17302470
Tower 18312220

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
6.98 acres

Last checked 20 Nov 2026. MahaRERA counts where they differ.

Godrej Properties: track record

From MahaRERA records

Godrej Properties has 39 projects in our MahaRERA register for Pune. 16 of 39 with both dates moved the completion date 3 months or more later, by 22 months on average.

All 39 projects by Godrej Properties in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Keshav Nagar

Want possession sooner? Gulmohar Esteban is filed for Apr 2028, 4 years earlier: compare the two. Or Esbee Azura is filed for Dec 2028, 3 years earlier: compare the two.

More by Oxford Realty LLP

FAQ

What is the price of Godrej Aqua Vista?

A local agent quotes from ₹80 L for Godrej Aqua Vista. Prices change often: ask for today's price and what it includes.

What is the possession date of Godrej Aqua Vista?

The completion date filed with MahaRERA is 19 Jul 2032; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Godrej Aqua Vista?

Godrej Aqua Vista is registered with MahaRERA as PM1260002500389.

How many towers and floors does Godrej Aqua Vista have?

MahaRERA lists 7 buildings, the tallest with 32 floors.

How many flats are there in Godrej Aqua Vista?

MahaRERA lists 1582 units (1501 residential, 81 other).

How many homes in Godrej Aqua Vista are booked?

323 of 1582 homes were booked as per MahaRERA on 28 Nov 2026.

Who is the builder of Godrej Aqua Vista?

The promoter registered with MahaRERA is Oxford Realty LLP. Our register has 39 Pune projects by Godrej Properties; 16 of 39 with both dates moved their completion date 3 months or more later.

Where is Godrej Aqua Vista?

Godrej Aqua Vista is in Keshav Nagar, Pune (pincode 411036).

Which railway station is nearest to Godrej Aqua Vista?

Hadapsar, about 2.3 km away in a straight line from the map position; the drive is longer.

How far is Godrej Aqua Vista from Pune Airport?

About 6 km in a straight line from the map position; the drive is longer.

How far is Godrej Aqua Vista from World Trade Center, Kharadi?

About 1.5 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Godrej Aqua Vista.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 8 Jun 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 20 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 20 Nov 2026

  • Location and nearbyGathered and checked

    Checked 20 Nov 2026

  • DescriptionGathered and checked

    Checked 20 Nov 2026

  • PriceGathered and checked

    The agent's price sheet (20 Nov 2026)

Get the price sheet and floor plans for Godrej Aqua Vista

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment