VTP Flamante from space, 2022 to 2026
Vegetation dominated the ring until early 2023. Following July 2023 registration, extensive ground clearing and excavation began, leading to a prominent building footprint and tall shadows by late 2024.
14 seasons, Jan 2022 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Clear building footprint sits at centre, casting long dark shadows northward.
- Apr–May 2026Dense surrounding construction activity expands to the south and east.
- Jan–Mar 2026Building footprint remains defined amid surrounding cleared terrain.
- Oct–Dec 2025Central building structure clearly visible with dark shadows falling north.
- Apr–May 2025Central structure appears larger with surrounding ground cleared.
- Jan–Mar 2025Building footprint expands centrally with prominent shadow casting north-west.
- Oct–Dec 2024A bright central structure footprint forms, casting sharp northern shadows.
- Apr–May 2024Ground preparation intensifies with distinct excavated ground inside the ring.
- Jan–Mar 2024Vegetation clears significantly inside the ring; excavation footprint emerges.
- Oct–Dec 2023Following July 2023 registration, clearing expands with bright patches appearing south-west.
- Apr–May 2023Ground clearing begins on the south-western edge of the ring.
- Jan–Mar 2023Plant cover declines slightly, but tree canopy largely persists.
VTP Flamante: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.