

VTP Flamante, Wagholi
Filed on MahaRERA as FLAMANTE BY VTP LUXE PHASE 1
Sold as Kharadi by 7 property sites; we list it under Wagholi (pincode 412207).
See the site from above todayby VTP Realty · Wagholi, Pune · 412207
- Homes
- 2, 3, 4 BHK
- Price
- from ₹93 L
- EMI about ₹64,566 a month
- Possession
- from Jul 2028
- its parts filed Jul 2028 to Oct 2029
- Booked
- 1,016 of 1,056
- across all 2 of its MahaRERA registrations
What stands out
As of 7 Nov 2026, from MahaRERA and the sources below.
- 96% of homes booked: Buyers have already booked 635 of the 660 homes in this phase. Across both registrations for the whole development, 1016 of 1056 homes are taken.
- The builder initially filed for 31 Mar 2028, and a blanket MahaRERA order added 4 months to establish the current 31 Jul 2028 timeline.
Updated 21 Nov 2026
Pictures
From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.
Price
2 BHK
₹93 L – ₹1.17 Cr
from 850 sq ft · ₹10,941/sq ft
Last checked 21 Nov 2026
All-in cost of the 2 BHK at ₹93 L: about ₹1.04 Cr
Price (agreement value) ₹93 L GST (5%) ₹4.65 L Stamp duty (7%) ₹6.51 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.04 Cr 3 BHK
₹1.35 Cr – ₹1.74 Cr
from 1,470 sq ft · ₹9,184/sq ft
Last checked 21 Nov 2026
All-in cost of the 3 BHK at ₹1.35 Cr: about ₹1.51 Cr
Price (agreement value) ₹1.35 Cr GST (5%) ₹6.75 L Stamp duty (7%) ₹9.45 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.51 Cr 4 BHK
From ₹2.65 Cr
Last checked 21 Nov 2026
All-in cost of the 4 BHK at ₹2.65 Cr: about ₹2.97 Cr
Price (agreement value) ₹2.65 Cr GST (5%) ₹13.25 L Stamp duty (7%) ₹18.55 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹2.97 Cr
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹64,566 a monthOn a ₹74.4 L loan (80% of ₹93 L) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Wagholi usually ask
- 1 BHK about ₹25 – 40 L (6 projects)
- 2 BHK about ₹50 – 75 L (32 projects)
- 3 BHK about ₹85 L – ₹1.3 Cr (20 projects)
- 4 BHK about ₹1.2 – 2.2 Cr (5 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Wagholi, rounded. Use it to judge an offer, not as a price.
Wagholi average ₹8,125/sq ft across 12 projectsThe middle asking price per sq ft of other projects in Wagholi.
Get the exact price for your home
The Avasetu team gets you the current price sheet for the size you want, with parking and all other charges.
VTP Flamante from above, today
VTP Flamante, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Clear building footprint sits at centre, casting long dark shadows northward.
Registered with MahaRERA Jul 2023 · possession filed for from Jul 2028
Vegetation dominated the ring until early 2023. Following July 2023 registration, extensive ground clearing and excavation began, leading to a prominent building footprint and tall shadows by late 2024.
The seasons before
- Apr–May 2026Dense surrounding construction activity expands to the south and east.
- Jan–Mar 2026Building footprint remains defined amid surrounding cleared terrain.
- Oct–Dec 2025Central building structure clearly visible with dark shadows falling north.
Construction proof from space: Jan 2022 to Oct 2026, Copernicus Sentinel-2 (8 earlier seasons)
- Apr–May 2025Central structure appears larger with surrounding ground cleared.
- Jan–Mar 2025Building footprint expands centrally with prominent shadow casting north-west.
- Oct–Dec 2024A bright central structure footprint forms, casting sharp northern shadows.
- Apr–May 2024Ground preparation intensifies with distinct excavated ground inside the ring.
- Jan–Mar 2024Vegetation clears significantly inside the ring; excavation footprint emerges.
- Oct–Dec 2023Following July 2023 registration, clearing expands with bright patches appearing south-west.
- Apr–May 2023Ground clearing begins on the south-western edge of the ring.
- Jan–Mar 2023Plant cover declines slightly, but tree canopy largely persists.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- EON IT Park, Kharadi2.4 km
- World Trade Center, Kharadi2.5 km
- Magarpatta City5.9 km
- Pune Airport (Lohegaon)7.5 km
Nearby
- Industrial areaInternational Tech Park Pune, Kharadi2.2 km
- Industrial areaEon IT Park Pune2.2 km
- SchoolThe Orbis School, Keshav Nagar, Pune (CBSE)2.9 km
- CollegeG.H. Raisoni College OF Engineering & Management, PUNE2.9 km
- TempleRenuka Mata Mandir3.2 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
Project facts
- The project consists of 6 towers that rise to 33 stories each. (the builder's site)
Amenities
- Features include a swimming pool with a vanishing edge, an open air amphitheatre, and a dance floor. (the builder's site)
Last checked 21 Nov 2026.
MahaRERA record
From MahaRERA, read 7 Nov 2026Possession date
31 Jul 2028 to 30 Oct 2029
The completion dates filed with MahaRERA for its 2 registrations; each is in the table of towers and phases below.
For P52100051826: 31 Jul 2028. The completion date filed with MahaRERA is 31 Jul 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Mar 2028.
The record
- Homes booked
- 1,016 of 1,056
- Across all 2 of its MahaRERA registrations. P52100051826 alone: 635 of 660.
- Towers
- 4 in this registration
- The tallest has 37 floors. 6 in the whole project (builder's site).
- Registered on
- 7 Jul 2023
- Main MahaRERA registration
- P52100051826
- Listed or updated on MahaRERA 27 Nov 2024.
- Promoter (builder)
- Integrated Business Ecosystem Private Limited
- Project type
- Residential / Group Housing
- Pincode
- 412207
Check before you book
From MahaRERA- Towers go up to 37 floors. Ask how many lifts serve your tower and how many homes share them.
Tower by tower
2 registrations, 4 buildings
Towers and phases (2 registrations)
From MahaRERAMahaRERA holds VTP Flamante as 2 registrations. Together they list 1,056 homes, 1,016 booked.
| Registration | Completion filed | Booked |
|---|---|---|
| FLAMANTE BY VTP LUXE PHASE 1P52100051826 (opens in a new tab) | 31 Jul 2028at registration 31 Mar 2028 | 635 of 660 |
| FLAMANTE BY VTP LUXE PHASE 2P52100055365 (opens in a new tab) | 30 Oct 2029at registration 30 Jun 2029 | 381 of 396 |
Each row is its own MahaRERA registration, as filed.
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| TOWER 1 | 35 | 132 | 0 |
| TOWER 2 | 37 | 198 | 0 |
| TOWER 3 | 37 | 198 | 0 |
| TOWER 4 | 36 | 132 | 0 |
As filed with MahaRERA (sanctioned floors).
What the builder's and property sites say
Gathered and checkedLast checked 21 Nov 2026. MahaRERA counts where they differ.
VTP Realty: track record
From MahaRERA recordsVTP Realty has 50 projects in our MahaRERA register for Pune. 27 of 50 with both dates moved the completion date 3 months or more later, by 20 months on average.
- Urban Risecompletion filed 30 Jun 2018, moved 6 months later
- URBAN BALANCEcompletion filed 31 Jul 2018, moved 1 month later
- Trade Park Phase1completion filed 29 Dec 2021, moved 24 months later
- Market Placecompletion filed 30 Dec 2021, moved 24 months later
- VTP ONEcompletion filed 28 Feb 2022, moved 14 months later
- Urban Nest Phase1completion filed 30 Mar 2022, moved 24 months later
- KPSQUAREcompletion filed 30 Jun 2022
- Urbanlife plottingcompletion filed 30 Jun 2022, moved 18 months later
- Purvanchal Phase1 ABcompletion filed 29 Dec 2022, moved 18 months later
- VTP Leonara E Buidlingcompletion filed 16 May 2023
- VTP Alpinecompletion filed 14 Jun 2023, moved 12 months later
- VTP SOLITAIRE PHASE 1 ABcompletion filed 31 Oct 2023, moved 34 months later
- Purvanchal Phase2 C D Ecompletion filed 31 Dec 2023, moved 6 months later
- Vtp Beaumonde- Nation R2 Tower5completion filed 15 Apr 2024, moved 20 months later
- VTP Beaumonde-Nation R2 T1completion filed 24 Oct 2024, moved 33 months later
- VTP Belair B And D Buildingcompletion filed 30 Dec 2024
- VTP Belair C buildingcompletion filed 30 Dec 2024
- VTP Leonara A and D Buildingcompletion filed 30 Dec 2024
- VTP Leonara building C and Fcompletion filed 30 Dec 2024
- VTP TOWNSQUAREcompletion filed 31 Mar 2025, moved 33 months later
- VTP Leonara H buildingcompletion filed 15 May 2025, moved 29 months later
- Purvanchal F Buildingcompletion filed 29 Jun 2025, moved 12 months later
- THE HUBcompletion filed 30 Jun 2025, moved 18 months later
- VTP Beaumonde Building T3completion filed 30 Jun 2025
- VTP Cygnus Building T11completion filed 30 Jun 2025
- VTP Cygnus BuildingT12 and Commercialcompletion filed 30 Jun 2025
- Vtp Cygnus- Nation R1-Tower 9completion filed 18 Jul 2025
- VTP Beaumonde Nation R2 Tower6completion filed 15 Aug 2025, moved 12 months later
- VTP AETHEREUS HIGH STREETcompletion filed 31 Mar 2026, moved 12 months later
- VTP ALTAIRcompletion filed 29 Jun 2026, moved 8 months later
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Wagholi
- Aarav Arcaciapossession Apr 2028
- Aarav Blossom3 BHK · from ₹57.05 L · possession Apr 2028Starts ₹36 L lower than VTP Flamante
- Aarav Elite Row Villaspossession Apr 2028
- Anshul Kanvas B Building1 BHK · from ₹36.78 L · possession Aug 2028Starts ₹56 L lower than VTP Flamante
- Castle Gardenpossession Apr 2028
- Castle Hillspossession Apr 2028
More by Integrated Business Ecosystem Private Limited
FAQ
What is the price of VTP Flamante?
2 BHK: ₹93 L to ₹1.17 Cr; 3 BHK: ₹1.35 Cr to ₹1.74 Cr; 4 BHK: ₹2.65 Cr, checked on 21 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of VTP Flamante?
The 2 MahaRERA registrations of VTP Flamante have filed completion dates from 31 Jul 2028 to 30 Oct 2029. For P52100051826: The completion date filed with MahaRERA is 31 Jul 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of VTP Flamante?
VTP Flamante is registered with MahaRERA in 2 parts (towers or phases): P52100051826, P52100055365.
How many towers and floors does VTP Flamante have?
MahaRERA lists 4 buildings in registration P52100051826, one of the project's 2, the tallest with 37 floors.
How many flats are there in VTP Flamante?
MahaRERA lists 1056 units across all 2 of its MahaRERA registrations; P52100051826 has 660.
How many homes in VTP Flamante are booked?
1016 of 1056 homes were booked as per MahaRERA on 7 Nov 2026, across all 2 of its MahaRERA registrations.
Who is the builder of VTP Flamante?
The promoter registered with MahaRERA is Integrated Business Ecosystem Private Limited. Our register has 50 Pune projects by VTP Realty; 27 of 50 with both dates moved their completion date 3 months or more later.
Where is VTP Flamante?
VTP Flamante is in Wagholi, Pune (pincode 412207).
Which school is nearest to VTP Flamante?
The Orbis School, Keshav Nagar, Pune (CBSE), about 2.9 km away in a straight line from the map position; the drive is longer.
How far is VTP Flamante from Pune Airport?
About 7.5 km in a straight line from the map position; the drive is longer.
How far is VTP Flamante from EON IT Park, Kharadi?
About 2.4 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to VTP Flamante.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 27 Nov 2024
- Dates and homes bookedFrom MahaRERA
Checked 21 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 7 Nov 2026
- Location and nearbyGathered and checked
Checked 21 Nov 2026
- DescriptionGathered and checked
Checked 21 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (21 Nov 2026)
- Project facts and amenitiesGathered and checked
The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (21 Nov 2026)
Get the price sheet and floor plans for FLAMANTE BY VTP LUXE PHASE 1
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.







