
Indraprastha, Wagholi
Wagholi, Pune · 412207
- Price
- from ₹66.5 L
- EMI about ₹46,168 a month
- Possession
- Apr 2029
- completion filed with MahaRERA
- Booked
- 33 of 77
What stands out
As of 22 Nov 2026, from MahaRERA and the sources below.
- Only 33 of the 77 homes are booked, a 43% booking rate, which is below the Wagholi median of 52%.
- With 77 units, this registration has more homes than 44 of the 77 comparable Wagholi projects.
Updated 21 Nov 2026
Price
Homes
₹66.5 L – ₹93.2 L
Last checked 18 Nov 2026
All-in cost of a home at ₹66.5 L: about ₹74.78 L
Price (agreement value) ₹66.5 L GST (5%) ₹3.33 L Stamp duty (7%) ₹4.66 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹74.78 L
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹46,168 a monthOn a ₹53.2 L loan (80% of ₹66.5 L) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Wagholi usually ask
- 1 BHK about ₹25 – 40 L (6 projects)
- 2 BHK about ₹50 – 75 L (33 projects)
- 3 BHK about ₹90 L – ₹1.3 Cr (21 projects)
- 4 BHK about ₹1.2 – 2.6 Cr (6 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Wagholi, rounded. Use it to judge an offer, not as a price.
Wagholi average ₹8,168/sq ft across 13 projectsThe middle asking price per sq ft of other projects in Wagholi.
Get the exact price for your home
The Avasetu team gets you the current price sheet for the size you want, with parking and all other charges.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Indraprastha, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Work hubs
- EON IT Park, Kharadi5.3 km
- World Trade Center, Kharadi5.5 km
- Pune Airport (Lohegaon)8.8 km
- Magarpatta City9.8 km
Nearby
- HospitalLifeline Hospital0.5 km
- HospitalIMHS MULTISPECIALITY HOSPITAL0.7 km
- CollegeG.H. Raisoni College OF Engineering & Management, PUNE1.2 km
- CollegeJSPM University Pune1.4 km
- SchoolBjs School Wagholi1.5 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
MahaRERA record
From MahaRERA, read 22 Nov 2026Possession date
30 Apr 2029
The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2028.
Beside other Wagholi projects
Worked out by Avasetu- Homes booked
- 43%
- The middle of 29 Wagholi projects registered within a year of it: 54%.
- Completion date
- Not moved by the builder
- 26 of 95 Wagholi projects being built moved theirs 3 months or more.
From MahaRERA records read 22 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 33 of 77
- Towers
- 2 in this registration
- The tallest has 9 floors.
- Registered on
- 16 Aug 2024
- MahaRERA registration
- P52100077450
- Listed or updated on MahaRERA 16 Aug 2024.
- Project type
- Residential / Group Housing
- Pincode
- 412207
Tower by tower
2 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| WING A | 9 | 38 | 0 |
| WING B | 9 | 39 | 0 |
As filed with MahaRERA (sanctioned floors).
What the builder's and property sites say
Gathered and checked- Land
- 0.96 acres
Last checked 18 Nov 2026. MahaRERA counts where they differ.
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Wagholi
- Aayush Elarafrom ₹1.19 Cr · possession Oct 2029Starts ₹53 L higher than Indraprastha
- Casagrand Caladium2, 3 BHK · from ₹1.26 Cr · possession Sep 2029Starts ₹60 L higher than Indraprastha
- Kumar Palladium Plazafrom ₹37 L · possession Dec 2029Starts ₹30 L lower than Indraprastha
- Nivaan Water Edge Phase-IIpossession Mar 2029
- Omkar Eternityfrom ₹53 L · possession Jan 2029Starts ₹14 L lower than Indraprastha
- Primus Onefrom ₹65 L · possession Jul 2029About the same starting price as Indraprastha
FAQ
What is the price of Indraprastha?
Homes from ₹66.5 L to ₹93.2 L, checked on 18 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of Indraprastha?
The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Indraprastha?
Indraprastha is registered with MahaRERA as P52100077450.
How many towers and floors does Indraprastha have?
MahaRERA lists 2 buildings, the tallest with 9 floors.
How many flats are there in Indraprastha?
MahaRERA lists 77 units.
How many homes in Indraprastha are booked?
33 of 77 homes were booked as per MahaRERA on 22 Nov 2026.
Where is Indraprastha?
Indraprastha is in Wagholi, Pune (pincode 412207).
Which hospital is nearest to Indraprastha?
Lifeline Hospital, about 0.5 km away in a straight line from the map position; the drive is longer.
Which school is nearest to Indraprastha?
Bjs School Wagholi, about 1.5 km away in a straight line from the map position; the drive is longer.
How far is Indraprastha from Pune Airport?
About 8.8 km in a straight line from the map position; the drive is longer.
How far is Indraprastha from EON IT Park, Kharadi?
About 5.3 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Indraprastha.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 16 Aug 2024
- Dates and homes bookedFrom MahaRERA
Checked 18 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 23 Oct 2026
- Location and nearbyGathered and checked
Checked 18 Nov 2026
- DescriptionGathered and checked
Checked 18 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (18 Nov 2026)
Get the price sheet and floor plans for INDRAPRASTHA
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.