New projects in Wagholi, Pune
Every project MahaRERA lists in Wagholi: 191 being built or recently finished, and 190 older ones. Each page shows the completion date the builder filed with MahaRERA, whether it has moved, and how many homes are booked, with the date we read the record.
Being built (191)
- 31 Palma Drive Phase 1 MahaRERA onlySagar Construction Company · completion filed 30 Oct 2029
- 31 Palma Drive Phase 2 MahaRERA onlySagar Construction Company · completion filed 31 Dec 2030
- 343 CREST MahaRERA onlyGera Developments Private Limited, Happy Face Investments Private Limited and Gera Developers LLP · completion filed 30 Dec 2027
- Aapla Ghar Wagholi Annex Phase I MahaRERA onlyMaple Indus Developers · completion filed 30 Apr 2027
- AARAV ARCACIA MahaRERA onlycompletion filed 30 Apr 2028
- AARAV BLOSSOM MahaRERA onlycompletion filed 31 Dec 2027
- AARAV ELITE ROW VILLAS MahaRERA onlyAARAV CONSTRUCTIONS · completion filed 30 Apr 2028
- AARAV PALM SPRINGS MahaRERA onlycompletion filed 31 Dec 2025
- AATRIA GREENS MahaRERA onlyAatria Developers · completion filed 31 Jul 2027
- AAYUSH ELARA MahaRERA onlyAAYUSH DEVELOPERS · completion filed 30 Oct 2029
- ALFA LIFESCAPES PHASE - 2 MahaRERA onlycompletion filed 25 Oct 2027
- ALTAMIRA BY VTP LUXE PHASE 1 CheckedMERCULUS CONSTRUWELL PRIVATE LIMITED · completion filed 30 Nov 2030
- ALTAMIRA BY VTP LUXE PHASE 2 MahaRERA onlyMERCULUS CONSTRUWELL PRIVATE LIMITED · completion filed 30 Apr 2032
- Anshul Kanvas B Building MahaRERA onlyANSHUL BHOSALE REALTY LLP · completion filed 30 Aug 2028
- ANSHUL MEDORA C BUILDING MahaRERA onlyANSHUL BHOSALE REALTY LLP · completion filed 30 Aug 2030
- AP4 Tech Park Checked 2/4Amar Pristine Landmarks LLP · completion filed 31 Mar 2030
- Aurora 2 MahaRERA onlyMagnum Developers · completion filed 30 Jan 2027
- BALAJI BLOSSOM MahaRERA onlycompletion filed 30 Oct 2027
- BRAHMA HEIGHTS BUILDING B MahaRERA onlyBRAHMA DEVELOPERS · completion filed 30 Apr 2027
- Casagrand Caladium CheckedCasagrand Millenia Private Limited · completion filed 19 Sep 2029
- CASTLE GARDEN MahaRERA onlyUTKARSH DREAM HOMES LLP · completion filed 30 Apr 2028
- CASTLE HILLS MahaRERA onlyPRARABDH ASSOCIATES LLP · completion filed 30 Apr 2028
- COZY KARISHMA MahaRERA onlycompletion filed 30 Apr 2028
- COZY LIFE BUILDING B MahaRERA onlycompletion filed 31 Dec 2026
- Defence Colony Pune Phase4 Checked 2/4completion filed 30 Nov 2026
- Diamond Crest A Wing MahaRERA onlycompletion filed 30 Apr 2029
- Dreams Icon MahaRERA onlyUmiya Realty · completion filed 30 Aug 2027
- Dreams Rakshak MahaRERA onlycompletion filed 31 Dec 2027
- ELEMENT 77 Checked 2/4completion filed 30 Apr 2030
- ELITE MahaRERA onlyV & J DEVELOPERS · completion filed 30 Jan 2027
- ENLIVEN HOME B WING PHASE 2 MahaRERA onlySIDDHIVINAYAK PROPERTIES · completion filed 30 Sep 2026
- EPIC PHASE - 3 MahaRERA onlyShivsagar Promoters & Developers · completion filed 30 Jun 2026
- EPIC PHASE - 4 MahaRERA onlyShivsagar Promoters & Developers · completion filed 31 Mar 2026
- EQUA MahaRERA onlyAMCO LANDMARK REALTY · completion filed 30 Apr 2027
- Equa - Wing C Checked 2/4AMCO LANDMARK REALTY · completion filed 31 Dec 2028
- Equa - Wing D and E MahaRERA onlyAMCO LANDMARK REALTY · completion filed 31 Mar 2027
- FLAMANTE BY VTP LUXE PHASE 1 CheckedINTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITED · completion filed 31 Jul 2028
- FLAMANTE BY VTP LUXE PHASE 2 CheckedINTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITED · completion filed 30 Oct 2029
- Fortune Pride MahaRERA onlycompletion filed 30 Oct 2028
- G S Crown Plazaa MahaRERA onlyG S Developers · completion filed 30 Apr 2027
- Gagan Adira Phase 2 CheckedTOPAZ HOMES LLP · completion filed 31 Dec 2027
- Geras Island of Joy Project A CheckedGera Developments Private Limited · completion filed 15 Sep 2028
- Geras Island of Joy Project B CheckedGera Developments Private Limited · completion filed 15 Oct 2028
- Geras Island of Joy Project C MahaRERA onlyGera Developments Private Limited · completion filed 2 Oct 2029
- Geras Planet of Joy Project I MahaRERA onlyGera Developments Private Limited · completion filed 31 Dec 2025
- Geras Planet of Joy Project II CheckedGera Developments Private Limited · completion filed 30 Apr 2027
- Geras Planet of Joy Project III MahaRERA onlyGera Developments Private Limited · completion filed 30 Apr 2027
- Geras Planet of Joy Project IV MahaRERA onlyGera Developments Private Limited · completion filed 30 Apr 2027
- Geras World of Joy D MahaRERA onlyGera Developments Private Limited · completion filed 30 Oct 2025
- Geras World of Joy M CheckedGera Developments Private Limited · completion filed 30 Dec 2027
- GG TOWN WAGHOLI PHASE B BUILDING 8 AND 9 MahaRERA onlyGOEL GANGA INDIA PVT LTD · completion filed 30 Jun 2028
- GG TOWN WAGHOLI PUNE MahaRERA onlyGOEL GANGA INDIA PVT LTD · completion filed 30 Jun 2027
- Godrej Greens Checked 3/4DREAM WORLD LANDMARKS LLP · completion filed 30 Sep 2026
- GOLDEN SQUARE MahaRERA onlyPVB BUILDERS AND ASSOCIATES · completion filed 31 Jul 2028
- Guardian Eastern Meadows - Phase 2 MahaRERA onlyGuardian Promoters & Developers Private Limited · completion filed 30 Apr 2027
- GULMOHAR VILLAS - T MahaRERA onlycompletion filed 30 Apr 2027
- GULMOHAR VILLAS - U MahaRERA onlycompletion filed 30 Apr 2027
- GULMOHAR VILLAS - V MahaRERA onlycompletion filed 30 Apr 2027
- GULMOHAR VILLAS - W MahaRERA onlyANALYZER CAE SOLUTIONS PRIVATE LIMITED · completion filed 30 Apr 2027
- GULMOHAR VILLAS - X MahaRERA onlycompletion filed 30 Apr 2027
- GURUKRUPA HEIGHTS MahaRERA onlyS N GROUP PROMOTERS AND BUILDERS · completion filed 30 Jan 2026
- HAPPY HOMES AMENITY BUILDING MahaRERA onlyHappy Homes Realty · completion filed 31 Dec 2026
- iLIFE Business Zone MahaRERA onlyFirstwall Ventures LLP · completion filed 30 Apr 2028
- INDRAPRASTHA MahaRERA onlycompletion filed 30 Apr 2029
- JOGESHWARI RESIDENCY MahaRERA onlyJAYRAJ BUILDERS · completion filed 31 Jul 2028
- KANCHANPURAM MahaRERA onlyBalaji Hari Developers AOP · completion filed 30 Oct 2028
- KANVAS B BUILDING MahaRERA onlyAnshul Bhosale Realty · completion filed 30 Dec 2027
- KAVYA HEIGHTS MahaRERA onlyAARYA DEVELOPERS · completion filed 25 Feb 2026
- Kharadi New Project - Tower 1 MahaRERA onlyLodha Developers Limited · completion filed 31 Jul 2030
- KHARADI NEW PROJECT - TOWER 3 MahaRERA onlyLodha Developers Limited · completion filed 31 Jul 2030
- KHARADI NEW PROJECT -TOWER 11 MahaRERA onlyLodha Developers Limited · completion filed 30 Mar 2031
- Kharadi New Project -Tower 2 MahaRERA onlyLodha Developers Limited · completion filed 31 Jul 2030
- KHARADI NEW PROJECT -TOWER 4 MahaRERA onlyLodha Developers Limited · completion filed 31 Jul 2030
- KHARADI NEW PROJECT -TOWER 5 MahaRERA onlyLodha Developers Limited · completion filed 30 Sep 2030
- Kharadi New Project -Tower 6 Checked 2/4Lodha Developers Limited · completion filed 31 Mar 2031
- Kharadi New Project -Tower 9 Checked 2/4Lodha Developers Limited · completion filed 30 Sep 2031
- Kharadi Pune P1 MahaRERA onlyLodha Developers Limited · completion filed 30 Oct 2029
- Kharadi Pune P2 MahaRERA onlyLodha Developers Limited · completion filed 29 Feb 2028
- Kharadi Pune P3 MahaRERA onlyLodha Developers Limited · completion filed 31 May 2028
- Kharadi Pune Phase I - Tower 1 to 4 CheckedLodha Developers Limited · completion filed 28 Feb 2027
- Kharadi Pune Phase I -Tower 5 MahaRERA onlyLodha Developers Limited · completion filed 30 Sep 2027
- Kharadi Pune Phase II -Tower 6 MahaRERA onlyLodha Developers Limited · completion filed 31 May 2027
- Kharadi Pune Phase II Tower 7 MahaRERA onlyLodha Developers Limited · completion filed 30 Sep 2027
- Kharadi Pune Phase II Tower 8 MahaRERA onlyLodha Developers Limited · completion filed 30 Jun 2029
- Kharadi Signet MahaRERA onlyLodha Developers Limited · completion filed 31 Dec 2028
- Kohinoor Kaleido CheckedIntofinity Promoters Private Limited · completion filed 30 Apr 2028
- Kohinoor Kaleido-Phase-II CheckedIntofinity Promoters Private Limited · completion filed 15 Feb 2030
- KOHINOOR RIVERDALE CheckedINTOFINITY PROMOTERS PRIVATE LIMITED · completion filed 31 Dec 2028
- Kohinoor Riverdale - Phase II CheckedIntofinity Promoters Private Limited · completion filed 30 Apr 2029
- KOSMIC KOURTYARD PHASE 1 MahaRERA onlyTriaa Lifespaces LLP · completion filed 31 Dec 2025
- KOSMIC KOURTYARD PHASE 2 MahaRERA onlyTriaa Lifespaces LLP · completion filed 30 Apr 2029
- Kumar Palladium Plaza MahaRERA onlyGAGAN GLOBAL DEVELOPERS · completion filed 31 Dec 2029
- LAKE TOWER MahaRERA onlycompletion filed 30 Apr 2026
- MAGNUM IRIS Checked 2/4completion filed 31 Dec 2026
- Mahindra Codename Crown Tower A and Tower B CheckedMahindra Lifespace Developers limited · completion filed 31 Jul 2030
- Mahindra Codename Crown Tower E MahaRERA onlyMahindra Lifespace Developers limited · completion filed 31 Jul 2030
- Mahindra IvyLush Tower C and Tower D CheckedMahindra Lifespace Developers limited · completion filed 31 Dec 2030
- Mainland Valencia Phase II MahaRERA onlyMAINLAND BUILDERS LLP · completion filed 30 Apr 2028
- Majestique City building E MahaRERA onlycompletion filed 30 Dec 2025
- MAJESTIQUE MANHATTAN-D MahaRERA onlyMajestique Housing LLP · completion filed 31 Jul 2026
- Majestique Tower East Phase-8 MahaRERA onlySharad Shree Enterprises, Sachin Date, Jayshree Date · completion filed 30 Apr 2031
- Majestique Tower East Phase-9 MahaRERA onlyM/s. Sharad Shree Enterprises · completion filed 30 Apr 2031
- Majestique Towers East Phase 05 MahaRERA onlyM/s. Sharad Shree Enterprises · completion filed 30 Apr 2028
- Majestique Towers East Phase 3 MahaRERA onlyM/s. Sharad Shree Enterprises · completion filed 30 Oct 2026
- Majestique Towers East Phase 6 MahaRERA onlyM/s. Sharad Shree Enterprises · completion filed 30 Apr 2029
- Majestique Towers East Phase-7 MahaRERA onlyM/s. Sharad Shree Enterprises · completion filed 30 Apr 2029
- MANSHA PHASE-II MahaRERA onlycompletion filed 30 Jun 2027
- MARIGOLD CITY Checked 3/4MARIGOLD VASTU LLP · completion filed 30 Apr 2028
- MEANDER WING C MahaRERA onlyEASTEND SPACES LLP · completion filed 31 Dec 2026
- Meander Wing D and E MahaRERA onlyEASTEND SPACES LLP · completion filed 30 Apr 2029
- Menlo Business Hub MahaRERA onlyMENLO REALTY LLP · completion filed 31 Dec 2027
- Menlo Homes Kharadi Next Phase 2 MahaRERA onlyMENLO REALTY LLP · completion filed 31 Dec 2025
- Menlo Professional Park MahaRERA onlyMENLO REALTY LLP · completion filed 30 Apr 2027
- MERIDIAN BUSINESS BAY MahaRERA onlyMAHAVEER DEVELOPERS · completion filed 5 Dec 2028
- Micasaa Phase III MahaRERA onlyGAGAN GLOBAL DEVELOPERS · completion filed 30 Oct 2028
- Muktangan MahaRERA onlyShree Ram Developers and Builders · completion filed 25 May 2032
- Neo City Part 3 MahaRERA onlycompletion filed 31 Dec 2026
- Nivaan Grandeur MahaRERA onlycompletion filed 30 Oct 2027
- Nivaan Grandeur Phase-II MahaRERA onlycompletion filed 31 Mar 2031
- Nivaan Legacy MahaRERA onlycompletion filed 30 Sep 2027
- NIVAAN MEADOWS MahaRERA onlyVISHAL CHUGERA PROPERTIES PRIVATE LIMITED · completion filed 30 Apr 2027
- Nivaan Meadows Phase III Checked 3/4VISHAL CHUGERA PROPERTIES INDIA PRIVATE LIMITED · completion filed 31 Dec 2032
- Nivaan Medows MahaRERA onlyVISHAL CHUGERA PROPERTIES PRIVATE LIMITED · completion filed 30 Apr 2027
- Nivaan Water Edge Phase-II MahaRERA onlycompletion filed 31 Mar 2029
- OMICRON TECH PARK MahaRERA onlyOMICRON COMMERZ LLP · completion filed 30 Apr 2032
- OMKAR ETERNITY MahaRERA onlycompletion filed 30 Jan 2029
- Panchshil Towers MahaRERA onlyPanchshil Infrastructure Holdings Pvt. Ltd. · completion filed 30 Dec 2026
- Panchvati MahaRERA onlyPNB Realty · completion filed 30 Apr 2028
- Pradnyaraj Classic MahaRERA onlyPradnyaraj Properties · completion filed 30 Jul 2027
- PRIME ANGAN MahaRERA onlycompletion filed 30 Apr 2027
- Primus One MahaRERA onlyPrimus Group · completion filed 31 Jul 2029
- PRINCE PLAZA MahaRERA onlycompletion filed 30 Jun 2028
- PRISTINE O2 WORLD PART 1 CheckedLOGIPARK WAREHOUSING LLP · completion filed 30 Apr 2029
- PRISTINE O2 WORLD PART 2 CheckedLOGIPARK WAREHOUSING LLP · completion filed 30 Apr 2029
- PRISTINE O2 WORLD PART 3 CheckedLOGIPARK WAREHOUSING LLP · completion filed 31 Dec 2029
- PRISTINE O2 WORLD PART 4 MahaRERA onlyLOGIPARK WAREHOUSING LLP · completion filed 30 Apr 2031
- Rohan Abhilasha 3 Checked 2/4Rohan Housing Pvt Ltd · completion filed 31 Jul 2027
- Rohan Abhilasha 4 Phase 1 CheckedRohan Housing Pvt Ltd · completion filed 30 Oct 2029
- ROHAN ABHILASHA BUILDING G Checked 2/4ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · completion filed 31 Dec 2026
- ROHAN YUVA - BLDG D Checked 2/4ANUMIT BUILDCON PRIVATE LIMITED · completion filed 31 Mar 2027
- ROHAN YUVA - BLDG E Checked 2/4ANUMIT BUILDCON PRIVATE LIMITED · completion filed 31 Dec 2026
- ROHAN YUVA - BUILD A Checked 2/4ANUMIT BUILDCON PRIVATE LIMITED · completion filed 30 Apr 2027
- ROSEWOOD PARK MahaRERA onlycompletion filed 31 Dec 2026
- ROYAL HOMEZ MahaRERA onlySai Balaji Construction · completion filed 30 Apr 2027
- RTC Emerald Suites MahaRERA onlycompletion filed 30 Apr 2032
- RTC SILVER MahaRERA onlycompletion filed 31 Oct 2025
- Sai Sankul MahaRERA onlycompletion filed 10 Mar 2027
- Sai Shawas MahaRERA onlycompletion filed 23 Dec 2026
- SAINA SERENITY MahaRERA onlyAASTHA DEVELOPERS · completion filed 16 Dec 2028
- Samarth Swarup Lotus MahaRERA onlyShree Samarth Swarup Builders & Developers · completion filed 30 Apr 2027
- Samruddhi Residency MahaRERA onlyNAVNATH PROPERTIES · completion filed 31 Jul 2031
- Sanskruti Oriana Checked 2/4AGAC Developers LLP · completion filed 30 Apr 2028
- SB Sai Sanskruti MahaRERA onlyS B SAI ASSOCIATES · completion filed 31 Oct 2027
- Serene Spaces MahaRERA onlycompletion filed 30 Apr 2030
- SHAMBHAVI GOLD MahaRERA onlycompletion filed 30 Apr 2028
- Shivtej Heights MahaRERA onlycompletion filed 30 Apr 2029
- Shree Sai Hills Phase II MahaRERA onlycompletion filed 31 Dec 2025
- Siddhivinayak Vishwa MahaRERA onlycompletion filed 30 Apr 2029
- SKYLIGHTS MahaRERA onlycompletion filed 28 Jun 2027
- SKYRISE Checked 2/4completion filed 30 Apr 2027
- SKYRISE PHASE II MahaRERA onlycompletion filed 30 Aug 2028
- SOHO MahaRERA onlyPanchshil Infrastructure Holdings Pvt. Ltd. · completion filed 30 Dec 2026
- Solvista Phase 1 MahaRERA onlySSL Infrabuild LLP · completion filed 1 Sep 2026
- SPLENDOUR ASTERRA MahaRERA onlycompletion filed 30 Dec 2029
- SPLENDOUR COUNTY WAGHOLI MahaRERA onlyPS DEVELOPERS · completion filed 15 Jun 2026
- SPRINGSHIRE CheckedKOLTE-PATIL DEVELOPERS LIMITED · completion filed 31 Jul 2028
- SUKHWANI PALMS MahaRERA onlySUKHWANI PROMOTERS & BUILDERS · completion filed 31 Dec 2025
- SUNSHINE HOME MahaRERA onlySUNSHINE REALTY · completion filed 30 Apr 2028
- Suryam 89 MahaRERA onlyUptitan Infra PVT LTD · completion filed 30 Apr 2029
- T5E Apex MahaRERA onlycompletion filed 30 Oct 2028
- TAKSH REGENCY MahaRERA onlycompletion filed 31 Dec 2025
- The Element Checked 2/4completion filed 31 Dec 2030
- THE JOY STREET GERAS ISLAND OF JOY MahaRERA onlyGera Developments Private Limited · completion filed 30 Jan 2028
- THE TRINITY MahaRERA onlyEH REALITY LLP · completion filed 30 Apr 2028
- TIERRA PHASE 2 MahaRERA onlycompletion filed 31 Dec 2028
- TRANQUIL MahaRERA onlyV & J DEVELOPERS · completion filed 30 Oct 2030
- TRIMURTI PARK MahaRERA onlySIDDHANATH DEVELOPERS · completion filed 31 Dec 2025
- TULSI AANGAN MahaRERA onlyYASHODHA RISE GROUP · completion filed 30 Apr 2030
- TULSI HOMES MahaRERA onlyYASHODHA ASSOCIATES · completion filed 30 Aug 2028
- Tulsi Vrindavan MahaRERA onlyYASHODHA ASSOCIATES AND COMPANY · completion filed 30 Apr 2030
- UK1321 Inclusive Housing MahaRERA onlyVilas Javdekar Infinitee Developers Pvt. Ltd. · completion filed 31 Dec 2026
- V Axis Checked 2/4completion filed 31 Dec 2027
- V2 Villa P-1 MahaRERA onlyPanchshil Infrastructure Holdings Pvt. Ltd. · completion filed 31 Dec 2027
- V3 Villa Phase- II MahaRERA onlyPanchshil Infrastructure Holdings Pvt. Ltd. · completion filed 31 Dec 2027
- Vantaara MahaRERA onlyReden Realty Buildcon LLP · completion filed 31 Jul 2029
- VTP ALTAIR CheckedIntegrated Business Ecosystem Private Limited · completion filed 29 Jun 2026
- WAGHOLI HIGH STREET, BUILDING C MahaRERA onlyG S Developers · completion filed 30 Apr 2028
- YASHODHA EAST RISE MahaRERA onlycompletion filed 30 Apr 2029
- YASHODHA VILLAS MahaRERA onlyYASHODHA PROPERTIES · completion filed 31 Jul 2028
- Yashwin Enchante Phase 1 CheckedVilas Javdekar Infinitee Developers Pvt. Ltd. · completion filed 30 Oct 2027
- Yashwin Enchante Phase 2 CheckedVilas Javdekar Infinitee Developers Pvt. Ltd. · completion filed 30 Apr 2030
Finished more than a year ago (190)
- Aarambh MahaRERA onlyM/S Skyline Properties · completion filed 30 Jun 2019
- AARAV BLISS MahaRERA onlycompletion filed 15 Dec 2019
- AAYAN- BUILDING 2 MahaRERA onlyGANDHI BAFNA CONSTRUCTION PVT LTD · completion filed 31 Dec 2019
- AGARWAL BUSINESS HUB MahaRERA onlyUnique group unit no.1 · completion filed 30 Dec 2022
- AISHWARYA LAXMI MahaRERA onlyOM SIDDHAKALA ASSOCIATES · completion filed 31 Dec 2018
- AJMERA EXOTICA MahaRERA onlyGopinath Developers LLP · completion filed 23 Feb 2023
- Ajmera Exotica Phase III MahaRERA onlyGOPINATH DEVELOPERS LLP · completion filed 30 Dec 2024
- Ajmera Exotica Phase-II MahaRERA onlyGOPINATH DEVELOPERS LLP · completion filed 30 Dec 2024
- Alfa Landmark MahaRERA onlyAPZ REALTY · completion filed 30 Mar 2021
- Allure MahaRERA onlycompletion filed 30 Jun 2022
- ANSHUL KANVAS A AND E BUILDING MahaRERA onlyM/S ANSHUL BHOSALE REALTY · completion filed 29 Oct 2020
- ARISE MahaRERA onlySAKSHAM PROPERTIES · completion filed 31 Mar 2025
- Aum Apartment MahaRERA onlyDRS Constructions LLP · completion filed 31 Dec 2018
- AURORA MahaRERA onlyMagnum Developers · completion filed 30 Jun 2024
- BA IRIS MahaRERA onlycompletion filed 20 Dec 2021
- BELLA VITA MahaRERA onlyMALKANI PROPERTIES · completion filed 31 Mar 2018
- Bharat Sohanraj Rathod MahaRERA onlycompletion filed 31 Dec 2019
- BLOSSOM MahaRERA onlyNG RATHI ASSOCIATES · completion filed 30 Dec 2020
- Bluebells MahaRERA onlycompletion filed 31 Dec 2018
- Bright Aristo MahaRERA onlyBrightera Builders · completion filed 30 Oct 2023
- Chandra Mukkut MahaRERA onlycompletion filed 30 Dec 2018
- Citron Phase 2 MahaRERA onlyCherry Contruction Pvt. Ltd. · completion filed 30 Jan 2025
- COZY LIFE MahaRERA onlycompletion filed 30 Sep 2020
- Defence Colony Pune Phase1 MahaRERA onlycompletion filed 30 Jun 2018
- Defence Colony Pune Phase2 MahaRERA onlycompletion filed 30 Sep 2018
- Diamond Crest Wing B MahaRERA onlycompletion filed 30 Nov 2019
- Dreams Lynnea A B wings MahaRERA onlyDreams Construction ( Pune) Pvt. Ltd. · completion filed 30 Sep 2020
- Dreams Rakshak G H wings MahaRERA onlycompletion filed 30 Sep 2020
- Dreams Sankalp L M wings MahaRERA onlyDreams Construction Pvt. Ltd. · completion filed 30 Dec 2021
- DURVANKUR RESIDENCY PHASE-2 MahaRERA onlycompletion filed 30 Jun 2018
- EPIC PHASE 1 MahaRERA onlySHIVSAGAR PROMOTERS & DEVELOPERS · completion filed 30 Dec 2021
- EPIC PHASE II MahaRERA onlySHIVSAGAR PROMOTERS & DEVELOPERS · completion filed 30 Dec 2021
- Fire Fly MahaRERA onlycompletion filed 9 Sep 2025
- Gagan Adira Phase 1 MahaRERA onlyTopaz Homes LLP · completion filed 30 Jun 2022
- Gagan Aviva MahaRERA onlyGagan Landmarks LLP · completion filed 28 Aug 2025
- GANGA HILL SHIRE PH I MahaRERA onlySHIVTULYAA GANGA BUILDER LLP · completion filed 30 May 2025
- Geras World of Joy C MahaRERA onlyGera Developments Private Limited · completion filed 15 Sep 2025
- Geras World of Joy L MahaRERA onlyGera Developments Private Limited · completion filed 15 Sep 2025
- Godrej Prana MahaRERA onlyDREAM WORLD LANDMARKS LLP · completion filed 30 Sep 2020
- Grande Ventila Phase 1 Wing B MahaRERA onlycompletion filed 31 Mar 2019
- Green County Phase II Wing-C MahaRERA onlyAnand Developers · completion filed 31 Dec 2018
- Green Groves - Cilantro MahaRERA onlyKP-Rachana Real Estate LLP · completion filed 31 Mar 2019
- Green Republic MahaRERA onlycompletion filed 1 Jun 2019
- Guardian Eastern Meadows - Phase 1 MahaRERA onlyGuardian Promoters & Developers Private Limited · completion filed 30 Jun 2023
- GULMOHAR HOMES PHASE - 1 MahaRERA onlycompletion filed 31 Dec 2024
- GULMOHAR HOMES PHASE - 2 MahaRERA onlyGULMOHAR INFRA · completion filed 31 Dec 2024
- GULMOHAR HOMES PHASE - 3 MahaRERA onlycompletion filed 31 Dec 2024
- GULMOHAR PRIMROSE MahaRERA onlycompletion filed 30 Dec 2021
- GULMOHAR RENAISSANCE MahaRERA onlycompletion filed 30 Dec 2021
- GULMOHAR VILLAS - A MahaRERA onlycompletion filed 31 Dec 2024
- GULMOHAR VILLAS - C MahaRERA onlycompletion filed 31 Dec 2024
- GULMOHAR VILLAS - E MahaRERA onlycompletion filed 30 Jun 2025
- GULMOHAR VILLAS - G MahaRERA onlycompletion filed 30 Jun 2025
- GULMOHAR VILLAS - H MahaRERA onlycompletion filed 30 Jun 2025
- GULMOHAR VILLAS - I MahaRERA onlycompletion filed 30 Jun 2025
- GURU VIHAN MahaRERA onlyGURU DEVELOPERS AND ASSOCIATES · completion filed 31 Dec 2017
- Happy Homes MahaRERA onlyHappy Homes Realty · completion filed 31 Dec 2019
- Hill Shire - Phase 1 MahaRERA onlyGuardian Promoters & Developers Private Limited · completion filed 30 Jun 2022
- HILL VIEW MahaRERA onlySAI BUILDERS · completion filed 31 Mar 2018
- Ivy Estate - Ivy Apartments and Villas and Umang Premiere and Umang Primo MahaRERA onlyKOLTE-PATIL DEVELOPERS LIMITED · completion filed 29 Dec 2023
- Ivy Estate Umang Premier MahaRERA onlyKOLTE-PATIL DEVELOPERS LIMITED · completion filed 30 Sep 2018
- Ivy Estate-Nia CheckedKOLTE-PATIL DEVELOPERS LIMITED · completion filed 29 Dec 2023
- JADE RESIDENCES - 2 MahaRERA onlyCREATOZ BUILDERS PRIVATE LIMITED · completion filed 31 Dec 2017
- JUBILATION MahaRERA onlycompletion filed 24 Mar 2018
- Konark Orchid I and J MahaRERA onlyKaria Realty · completion filed 30 Jun 2019
- Krishna-Kamal Serenity MahaRERA onlyOm Developers · completion filed 30 Dec 2021
- MAINLAND VALENCIA MahaRERA onlyMainland Builders LLP · completion filed 31 Dec 2018
- MAJESTIQUE CITY MahaRERA onlycompletion filed 31 Dec 2019
- Majestique City D Building MahaRERA onlycompletion filed 30 Mar 2024
- MAJESTIQUE OASIS MahaRERA onlyM/S. SHRADDHA DEVELOPERS · completion filed 30 Dec 2023
- MAJESTIQUE TOWERS EAST PHASE 1 MahaRERA onlyM/S. SHARAD SHREE ENTERPRISES · completion filed 31 Dec 2022
- MAJESTIQUE TOWERS EAST PHASE 2 MahaRERA onlyM/S. SHARAD SHREE ENTERPRISES · completion filed 31 Dec 2022
- Manhattan MahaRERA onlyMajestique Housing LLP · completion filed 1 Apr 2019
- MANHATTAN MahaRERA onlyMAJESTIQUE HOUSING LLP · completion filed 1 Apr 2022
- Manhattan - B building MahaRERA onlyMAJESTIQUE HOUSING LLP · completion filed 30 Jun 2025
- Manhattan - G building MahaRERA onlyMAJESTIQUE HOUSING LLP · completion filed 30 Dec 2023
- Manhattan - H building MahaRERA onlyMAJESTIQUE HOUSING LLP · completion filed 30 Jun 2025
- Manhattan - I Building MahaRERA onlyMAJESTIQUE HOUSING LLP · completion filed 30 Jun 2025
- Manhattan Wing-C MahaRERA onlyMAJESTIQUE HOUSING LLP · completion filed 31 Mar 2025
- Marvel Fria P1, P2, P3 Building MahaRERA onlyPAX HOMES LLP · completion filed 30 Dec 2024
- Mayuri Sunrise MahaRERA onlyV Satav Developers · completion filed 30 Dec 2021
- MEANDER WING A MahaRERA onlyEASTEND SPACES LLP · completion filed 30 Sep 2024
- MEANDER WING B MahaRERA onlyEASTEND SPACES LLP · completion filed 31 Mar 2024
- Melon MahaRERA onlyBlue Skky Realty · completion filed 31 Mar 2019
- Menlo Homes Kharadi Next Phase I MahaRERA onlyMENLO REALTY LLP · completion filed 30 Dec 2023
- MICASAA PHASE 2 MahaRERA onlyGAGAN GLOBAL DEVELOPERS · completion filed 30 Mar 2022
- Moraya Construction MahaRERA onlyMoraya Construction · completion filed 1 Jan 2019
- Mount Castel MahaRERA onlycompletion filed 30 Dec 2021
- Mount Castle Phase II MahaRERA onlycompletion filed 30 Dec 2023
- MULIK LUXURIA - E WING MahaRERA onlycompletion filed 30 Dec 2021
- NEO CITY PART 2 MahaRERA onlycompletion filed 30 Dec 2021
- NYATI ELAN CENTRAL I MahaRERA onlyPSQUARE BUILDERS LLP · completion filed 30 Apr 2024
- NYATI ELAN CENTRAL II MahaRERA onlyPSQUARE BUILDERS LLP · completion filed 31 Dec 2024
- NYATI ELAN CENTRAL III MahaRERA onlyPSQUARE BUILDERS LLP · completion filed 31 Dec 2024
- NYATI ELAN COMMERCIAL MahaRERA onlyPSQUARE BUILDERS LLP · completion filed 31 Jan 2019
- NYATI ELAN SOUTH I MahaRERA onlyPSQUARE BUILDERS LLP · completion filed 30 Apr 2024
- NYATI ELAN SOUTH II MahaRERA onlyPSQUARE BUILDERS LLP · completion filed 31 Dec 2024
- NYATI ELAN WEST I MahaRERA onlyPSQUARE BUILDERS LLP · completion filed 30 Jun 2018
- NYATI ELAN WEST II MahaRERA onlyPSQUARE BUILDERS LLP · completion filed 30 Sep 2019
- Nyati Elan West III MahaRERA onlyPSQUARE BUILDERS LLP · completion filed 30 Sep 2023
- Olive Phase II MahaRERA onlyBlue Skky Builders & Promoters · completion filed 31 Mar 2018
- OMKAR HERITAGE MahaRERA onlycompletion filed 31 Dec 2023
- OMKAR MEADOWS MahaRERA onlycompletion filed 30 Jun 2018
- OMKAR NIRVANA MahaRERA onlycompletion filed 30 Dec 2021
- OPTIMA HEIGHTS B BUILDING MahaRERA onlyAVNEE AND VEDA ASSOCIATES · completion filed 31 Dec 2018
- OPTIMA HEIGHTS BUILDING E MahaRERA onlyAVNEE AND VEDA ASSOCIATES · completion filed 30 Mar 2022
- OPTIMA HEIGHTS BUILDING F MahaRERA onlyAVNEE AND VEDA ASSOCIATES · completion filed 30 Dec 2024
- OXY EVOLVE MahaRERA onlyVENKATESH ASSOCIATES · completion filed 31 Dec 2019
- OXY GALAXY MahaRERA onlycompletion filed 30 Jun 2018
- OXY GALAXY PHASE 2 MahaRERA onlycompletion filed 30 Dec 2023
- PALM NEST PHASE II MahaRERA onlyNG RATHI PROPERTIES LLP · completion filed 30 Jun 2022
- PALM NEST-PHASE I MahaRERA onlyNG RATHI PROPERTIES LLP · completion filed 30 Dec 2021
- PALMNEST PHASE III MahaRERA onlyNG RATHI PROPERTIES LLP · completion filed 30 Jun 2025
- Palmnest-Phase IV MahaRERA onlyNG Rathi Properties LLP · completion filed 29 Jun 2024
- PARIJAT HEIGHTS MahaRERA onlyNew Horizon Realty · completion filed 31 Dec 2023
- Periwinkle MahaRERA onlycompletion filed 30 Dec 2024
- PRISTINE AAKANKSHA MahaRERA onlycompletion filed 31 Dec 2018
- PRISTINE CITY BEF MahaRERA onlyPRISTINE DEVELOPERS · completion filed 29 Feb 2020
- PRISTINE CITY PLOTS MahaRERA onlyPRISTINE DEVELOPERS · completion filed 1 Apr 2025
- PRISTINE PURVRANG PART 1 MahaRERA onlycompletion filed 30 Dec 2022
- Purvanchal F Building MahaRERA onlyVTP Corpartion LLP · completion filed 29 Jun 2025
- Purvanchal Phase1 AB MahaRERA onlyVTP Corpartion LLP · completion filed 29 Dec 2022
- Purvanchal Phase2 C D E MahaRERA onlyVTP Corporation LLP · completion filed 31 Dec 2023
- PURVARANG COMMERCIAL COMPLEX MahaRERA onlyJKG DEVELOPERS · completion filed 25 Dec 2023
- RAINBOW GRACE MahaRERA onlyRAINBOW REALTY · completion filed 30 Mar 2023
- RAJ RESIDENCY MahaRERA onlySUMAN ASSOCIATES · completion filed 30 Dec 2023
- Rivaah Regency MahaRERA onlycompletion filed 30 Dec 2019
- ROHAN ABHILASHA 2 WING A MahaRERA onlyROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · completion filed 30 Mar 2024
- ROHAN ABHILASHA 2 WING B MahaRERA onlyROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · completion filed 30 Dec 2024
- ROHAN ABHILASHA BUILDING A MahaRERA onlyROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · completion filed 31 Dec 2018
- ROHAN ABHILASHA BUILDING C MahaRERA onlyROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · completion filed 31 Dec 2018
- ROHAN ABHILASHA BUILDING D MahaRERA onlyROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · completion filed 30 Dec 2022
- ROHAN ABHILASHA BUILDING E MahaRERA onlyROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · completion filed 31 Dec 2018
- ROHAN ABHILASHA BUILDING F MahaRERA onlyROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · completion filed 31 Dec 2019
- RUDRA MahaRERA onlyRohan Buliders and Developers · completion filed 30 Jun 2022
- Rudra Palace MahaRERA onlycompletion filed 31 Jul 2020
- SAI ARCADE MahaRERA onlyAGARWAL GUPTA ASSOCIATES · completion filed 24 Jul 2023
- SAI PUSHKRAJ MahaRERA onlySAI ENTERPRISES · completion filed 31 Dec 2017
- SAI VILLA MahaRERA onlyJAGDAMBA ENTERPRISES AND CONSTRUCTION · completion filed 30 Dec 2022
- SAISHRIYA SAMRUDDHI MahaRERA onlySAI SHRIYA BUILDERS · completion filed 30 Mar 2021
- SAURABH HEIGHTS MahaRERA onlySAURABH CONSTRUCTION · completion filed 30 Mar 2022
- Savannah MahaRERA onlySim Properties · completion filed 30 Jun 2024
- SHAMBHAVI PALACE MahaRERA onlycompletion filed 31 May 2023
- SHANTIVAN MahaRERA onlycompletion filed 30 Jun 2025
- SHIV MALHAR MahaRERA onlySWARAJ DEVELOPERS · completion filed 30 Sep 2018
- SHIV PARK MahaRERA onlyTRIMURTI DEVELOPERS · completion filed 29 Sep 2022
- SHRI SWAMI SAMRTH RECEDNCY MahaRERA onlyBSK DEVELOPERS AND BUILDERS · completion filed 15 Aug 2018
- SHRISHTI MahaRERA onlyGera Developments Private Limited · completion filed 15 Sep 2025
- SHUBHAM RESIDENCY MahaRERA onlycompletion filed 31 Dec 2017
- SHYAMNATH PALACE MahaRERA onlycompletion filed 31 Dec 2017
- SIDDHI COMPLEX MahaRERA onlyKIRAN ASSOCIATES · completion filed 31 Jul 2024
- Silver Crest Commercial Wing A and B MahaRERA onlyM/S Mahavir Realty · completion filed 30 Mar 2024
- Silver Crest Wing A and C MahaRERA onlyM/S Mahavir Realty · completion filed 28 Nov 2023
- SKKY VILLAS PHASE I MahaRERA onlyARNAV CONSTRUCTION · completion filed 30 Mar 2022
- SKKY VILLAS PHASE II MahaRERA onlycompletion filed 30 Jun 2022
- SKKY VILLAS PHASE III MahaRERA onlyADITYA PRIDE REALTY · completion filed 30 Dec 2021
- SKY WATER MahaRERA onlycompletion filed 31 Dec 2018
- SKYGOLD MahaRERA onlyM/S SHIVSAI PROPERTIES · completion filed 31 Dec 2024
- Sukhwani Palms MahaRERA onlySUKHWANI PROMOTERS & BUILDERS · completion filed 30 Sep 2020
- Sukhwani Scarlet MahaRERA onlycompletion filed 31 Dec 2019
- SUNRISE AAPARTMENT MahaRERA onlyJAI BHAGWAN CONSTRUCTION AND DEVELOPERS · completion filed 30 Sep 2025
- SUNRISE CITY MahaRERA onlyAIRSPEED REALTY · completion filed 1 Jun 2023
- Suyog Nisarg Phase III MahaRERA onlycompletion filed 31 Mar 2019
- T-Villa MahaRERA onlyPanchshil Infrastructure Holdings Pvt Ltd · completion filed 30 Sep 2023
- Tara Ashirvaad MahaRERA onlyShivtara Properties Private Limited · completion filed 31 Dec 2017
- Tara Athena MahaRERA onlycompletion filed 15 Dec 2023
- THE HUB MahaRERA onlyVTP CORPORATION LLP · completion filed 30 Jun 2025
- TIERRA MahaRERA onlycompletion filed 31 Dec 2018
- Umang Pride - Building C MahaRERA onlycompletion filed 4 Feb 2025
- UNICON AVASA PART 1 MahaRERA onlycompletion filed 1 Feb 2022
- UNICON NIVASA PART 1 MahaRERA onlycompletion filed 1 Feb 2022
- UNIQUE LIFESTYLE MahaRERA onlyUnique group unit no.1 · completion filed 30 Jun 2021
- Urban Square MahaRERA onlycompletion filed 30 Mar 2022
- URBANO MahaRERA onlyNG Rathi Associates · completion filed 31 Dec 2024
- UTSAV BUSINESS CENTER MahaRERA onlyROYAL DEVELOPERS · completion filed 30 Mar 2024
- UTSAV RESIDENCY MahaRERA onlyROYAL DEVELOPERS · completion filed 17 Jun 2019
- UTSAV RESIDENCY PHASE II MahaRERA onlyROYAL DEVELOPERS · completion filed 30 Nov 2023
- Vermont MahaRERA onlySIA Developers · completion filed 29 Dec 2020
- VIJAY VIHAR Checkedcompletion filed 13 Dec 2022
- VISHWARAJ RESIDENCY MahaRERA onlyM/S. ANAND DEVELOPERS · completion filed 31 Mar 2023
- VRINDAVAN APPARTMENT MahaRERA onlycompletion filed 1 Mar 2021
- WAGHOLI PLOTTED DEVELOPMENT MahaRERA onlyGOEL GANGA INDIA PVT LTD · completion filed 30 Jun 2024
- Welhome Galaxy Phase 1 MahaRERA onlyWelhome Properties · completion filed 30 Dec 2018
- WHITE STONE B BLDG MahaRERA onlycompletion filed 30 Dec 2022
- WILDWOODS 2 PHASE I MahaRERA onlycompletion filed 30 Dec 2022
- WILDWOODS 2 PHASE II MahaRERA onlycompletion filed 31 Dec 2024
- WILDWOODS PHASE 1 MahaRERA onlycompletion filed 30 Dec 2023
- WILDWOODS PHASE 2 MahaRERA onlycompletion filed 30 Oct 2024
- YASHRAJ AUDUMBAR MahaRERA onlycompletion filed 7 Apr 2022
- ZENSPACES.CO ECOTOWN PHASE 1A MahaRERA onlycompletion filed 29 Jun 2024
From MahaRERA's public records, read on the date shown on each project's page. A project is listed under the area of the pincode it is filed under. This is general information, not investment or legal advice.