Ios Prime, Tathawade
by Linux Group · Tathawade, Mulshi, Pune district · 411033
- Price
- from ₹80.87 L
- EMI about ₹56,145 a month
- Possession
- Apr 2029
- completion filed with MahaRERA
- Booked
- 46 of 104
What stands out
As of 12 Nov 2026, from MahaRERA and the sources below.
- MahaRERA's order added 4 months to the completion date, which is the difference between the two filed dates, as the builder did not move it
- Similar projects are at about 49%, with 46% of homes booked here
Updated 22 Nov 2026
Price
Homes
₹80.87 L – ₹84.2 L
Last checked 9 Nov 2026
All-in cost of a home at ₹80.87 L: about ₹90.87 L
Price (agreement value) ₹80.87 L GST (5%) ₹4.04 L Stamp duty (7%) ₹5.66 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹90.87 L
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹56,145 a monthOn a ₹64.7 L loan (80% of ₹80.87 L) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Tathawade usually ask
- 2 BHK about ₹70 – 90 L (39 projects)
- 2.5 BHK about ₹90 L – ₹1.1 Cr (4 projects)
- 3 BHK about ₹90 L – ₹1.3 Cr (38 projects)
- 4 BHK about ₹1.3 – 2 Cr (7 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.
Tathawade average ₹10,852/sq ft across 19 projectsThe middle asking price per sq ft of other projects in Tathawade.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Ios Prime, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Work hubs
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)4.2 km
- Baner-Balewadi High Street7 km
- Pune Railway Station17.2 km
- Pune Airport (Lohegaon)17.7 km
Nearby
- CollegeIndira College of Commerce & Science (ICCS)1.9 km
- CollegeD.Y. Patil College of Engineering2.1 km
- SchoolAkshara International School & Junior College2.2 km
- CollegeD. Y. Patil International University2.2 km
- TempleShani Mandir2.2 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
Project facts
- 2 & 3 BHK.
Last checked 9 Nov 2026.
MahaRERA record
From MahaRERA, read 12 Nov 2026Possession date
30 Apr 2029
The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Dec 2028.
Ios Prime: what changed, as we read it
Homes booked went from 48 to 46 between 13 Oct 2026 and 12 Nov 2026 (MahaRERA shows cancellations this way), of 104 homes.
- 12 Nov 2026: 46 booked
- 13 Oct 2026: 48 booked
Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.
Beside other Tathawade projects
Worked out by Avasetu- Homes booked
- 44%
- The middle of 73 Tathawade projects registered within a year of it: 49%.
- Completion date
- Not moved by the builder
- 53 of 233 Tathawade projects being built moved theirs 3 months or more.
From MahaRERA records read 12 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 46 of 104
- Towers
- 2 in this registration
- The tallest has 20 floors. 6 in the whole project.
- Registered on
- 1 Dec 2023
- MahaRERA registration
- P52100053819
- Listed or updated on MahaRERA 18 Aug 2025.
- Promoter (builder)
- Linux Group
- Project type
- Residential / Group Housing
- Pincode
- 411033
Tower by tower
2 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| B2 | 20 | 68 | 0 |
| C1 | 12 | 36 | 0 |
As filed with MahaRERA (sanctioned floors).
What the builder's and property sites say
Gathered and checked- Land
- 5.5 acres
Last checked 9 Nov 2026. MahaRERA counts where they differ.
Linux Group: track record
From MahaRERA recordsLinux Group has 6 projects in our MahaRERA register for Pune. 1 of 6 with both dates moved the completion date 3 months or more later, by 5 months on average.
- Vientocompletion filed 30 Dec 2022
- Bonheurcompletion filed 30 Jun 2024
- iOS Tathawadecompletion filed 30 Dec 2024, moved 5 months later
- IOS PRIME B1completion filed 30 Apr 2030
- IOS PRIME C2completion filed 31 Dec 2031
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Tathawade
- 12th Avenuepossession Apr 2029
- 18 Magnitudefrom ₹67.95 L · possession Apr 2029Starts ₹13 L lower than Ios Prime
- 24Life Altaapossession Feb 2029
- 33 Central Avenue2, 3 BHK · from ₹87.3 L · possession Apr 2029Starts ₹6 L higher than Ios Prime
- AA Privilege2, 3 BHK · from ₹69 L · possession Apr 2029Starts ₹12 L lower than Ios Prime
- Akshay Residencypossession Dec 2029
More by Linux Group
FAQ
What is the price of Ios Prime?
Homes from ₹80.87 L to ₹84.2 L, checked on 9 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of Ios Prime?
The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Ios Prime?
Ios Prime is registered with MahaRERA as P52100053819.
How many towers and floors does Ios Prime have?
MahaRERA lists 2 buildings, the tallest with 20 floors.
How many flats are there in Ios Prime?
MahaRERA lists 104 units.
How many homes in Ios Prime are booked?
46 of 104 homes were booked as per MahaRERA on 12 Nov 2026.
Who is the builder of Ios Prime?
The promoter registered with MahaRERA is Linux Group. Our register has 6 Pune projects by Linux Group; 1 of 6 with both dates moved their completion date 3 months or more later.
Where is Ios Prime?
Ios Prime is in Mulshi, Pune district (pincode 411033).
Which school is nearest to Ios Prime?
Akshara International School & Junior College, about 2.2 km away in a straight line from the map position; the drive is longer.
How far is Ios Prime from Pune Airport?
About 17.7 km in a straight line from the map position; the drive is longer.
How far is Ios Prime from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?
About 4.2 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Ios Prime.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 18 Aug 2025
- Dates and homes bookedFrom MahaRERA
Checked 9 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 9 Nov 2026
- Location and nearbyGathered and checked
Checked 9 Nov 2026
- DescriptionGathered and checked
Checked 9 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (9 Nov 2026)
- Project facts and amenitiesGathered and checked
The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (9 Nov 2026)
Get the price sheet and floor plans for IOS PRIME
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.