Kohinoor Riverdale from space, 2023 to 2026
Ground clearing began in early 2023, followed by a building footprint in late 2023 ahead of the May 2024 MahaRERA registration. Construction footprints and shadows expanded continuously through 2026.
12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Little change inside the ring.
- Apr–May 2026Little change; blue sheets visible to the north and east.
- Jan–Mar 2026Building structure remains prominent with strong north-west shadow inside the ring.
- Oct–Dec 2025Building footprint with tall shadow expanding inside the ring.
- Jan–Mar 2025Distinct building footprint casting shadows; surrounding area shows cleared ground.
- Oct–Dec 2024Expanding building footprint casting a distinct shadow to the north-west.
- Jan–Mar 2024Building footprint defined with casting shadow inside the ring.
- Oct–Dec 2023Bright structure footprint appears in the ring before the May 2024 registration.
- Jan–Mar 2023Ground disturbed and cleared in the ring; surrounding vegetation decreased.
Kohinoor Riverdale: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.