Skip to main contentSkip to navigation
Kohinoor Riverdale, picture 1Kohinoor Group logo
From House Deal's listing
MahaRERA registered P52100056021Verify on MahaRERA (opens in a new tab)

Kohinoor Riverdale, Kharadi

See the site from above today

by Kohinoor Group · Kharadi, Pune · 412207

Homes
2 & 3 BHK
Price
from ₹97.5 L
EMI about ₹67,690 a month
Possession
from Dec 2028
its parts filed Dec 2028 to Apr 2029
Booked
672 of 1,076
across all 2 of its MahaRERA registrations

Listed by House DealSee it on House Deal's page →

Avasetu's read (from MahaRERA data, 3 Nov 2026)

At 72% booked, this project has sold 466 of 648 homes, which is ahead of 23 similar Wagholi projects at about 60%. The completion date filed with MahaRERA is 31 Dec 2028. Kohinoor Group moved completion dates by 3 months or more in 10 of 35 Pune projects on MahaRERA.

What stands out

As of 20 Nov 2026, from MahaRERA and the sources below.

  • 72% of homes booked: Buyers have already taken 466 of the 648 apartments in this registration, while 672 of 1076 apartments are booked across the entire project.
  • The developer Intofinity Promoters Private Limited has committed to finish this phase by 31 Dec 2028.

Updated 21 Nov 2026

Pictures

Kohinoor Riverdale, picture 2
Kohinoor Riverdale, picture 3
Kohinoor Riverdale, picture 4
Kohinoor Riverdale, picture 5
Kohinoor Riverdale, picture 6
Kohinoor Riverdale, picture 7

From House Deal's listing. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Sample flat video

  • Sample flat · from House Deal · Watch

Kohinoor Riverdale in a short video

Working at Eon IT Park Pune? Watch this. · 17.8 seconds
Open the video on its own page

Price

On offer

Listed by House Deal

From ₹97.5 L

2 & 3 BHK · apartments · 696 to 989 sq ft carpet

HomeCarpet areaPricePer sq ft
2 BHK696 sq ft₹97.5 L₹14,009/sq ft
2 BHK767 sq ft₹1.07 Cr₹13,950/sq ft
3 BHK852 sq ft₹1.2 Cr₹14,085/sq ft
3 BHK989 sq ft₹1.39 Cr₹14,055/sq ft

With a home loan, your own cash for the 2 BHK: about ₹29.63 LYour own cash, about: the part banks may not lend (RBI: 75% to 90% of the price is the most a home loan covers), stamp duty 7% (6% if a woman buys) and registration up to ₹30,000. Add GST (5% on homes being built) if the price leaves it out.

EMI, as an example: about ₹67,690 a monthOn a ₹78 L loan (80% of the price) at 8.5% for 20 years. Ask your bank for its rate.

All-in cost of the 2 BHK at ₹97.5 L: about ₹1.09 Cr
Price (agreement value)As quoted, before taxes.₹97.5 L
GST (5%)On a home being built.₹4.88 L
Stamp duty (7%)The rate inside PMC and PCMC limits; 6% if a woman buys. Charged on the ready reckoner value instead when that is higher.₹6.83 L
Registration (1%, at most ₹30,000)₹30,000
Total before the builder's charges₹1.09 Cr

Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

From the agent's listing, 20 Nov 2026.

Kharadi average ₹12,294/sq ft across 9 projectsThe middle asking price per sq ft of other projects in Kharadi.

Want this at today's price?

Prices change. The Avasetu team confirms today's price, what is still available and the full cost.

Ask for the current offer

Kohinoor Riverdale from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Kohinoor Riverdale, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Kohinoor Riverdale from above, satellite picture of Nov 2022
    Nov 2022
  2. Kohinoor Riverdale from above, satellite picture of Jan 2024
    Jan 2024
  3. Kohinoor Riverdale from above, satellite picture of Feb 2025
    Feb 2025
  4. Kohinoor Riverdale from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Little change inside the ring.

Registered with MahaRERA May 2024 · possession filed for from Dec 2028

Season by season, Jan 2023 to Oct 2026: 12 seasons, October to May (the monsoon is under cloud).

Ground clearing began in early 2023, followed by a building footprint in late 2023 ahead of the May 2024 MahaRERA registration. Construction footprints and shadows expanded continuously through 2026.

The seasons before

  1. Apr–May 2026Little change; blue sheets visible to the north and east.
  2. Jan–Mar 2026Building structure remains prominent with strong north-west shadow inside the ring.
  3. Oct–Dec 2025Building footprint with tall shadow expanding inside the ring.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2 (5 earlier seasons)
  1. Jan–Mar 2025Distinct building footprint casting shadows; surrounding area shows cleared ground.
  2. Oct–Dec 2024Expanding building footprint casting a distinct shadow to the north-west.
  3. Jan–Mar 2024Building footprint defined with casting shadow inside the ring.
  4. Oct–Dec 2023Bright structure footprint appears in the ring before the May 2024 registration.
  5. Jan–Mar 2023Ground disturbed and cleared in the ring; surrounding vegetation decreased.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • EON IT Park, Kharadi2.2 km
  • World Trade Center, Kharadi2.3 km
  • Magarpatta City5.4 km
  • Pune Airport (Lohegaon)7.4 km

Nearby

  • Industrial areaEon IT Park Pune2 km
  • Industrial areaInternational Tech Park Pune, Kharadi2.3 km
  • SchoolThe Orbis School, Keshav Nagar, Pune (CBSE)2.4 km
  • TempleRenuka Mata Mandir2.6 km
  • BankSadhana Bank ATM3.1 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Amenities

  • Amenities include an indoor gym, co-working space, multipurpose sports court, kids' pool, swimming pool, and jogging track. (the builder's site)

Last checked 20 Nov 2026.

MahaRERA record

From MahaRERA, read 20 Nov 2026

Possession date

31 Dec 2028 to 30 Apr 2029

The completion dates filed with MahaRERA for its 2 registrations; each is in the table of towers and phases below.

For P52100056021: 31 Dec 2028. Completion date filed with MahaRERA. Not moved since registration.

The record

Homes booked
672 of 1,076
Across all 2 of its MahaRERA registrations. P52100056021 alone: 466 of 648.
Towers
3 in this registration
The tallest has 28 floors.
Registered on
6 May 2024
Main MahaRERA registration
P52100056021
Listed or updated on MahaRERA 7 Aug 2026.
Promoter (builder)
Intofinity Promoters Private Limited
Project type
Residential / Group Housing
Pincode
412207

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA and checked sites
  • About 215 homes per acre (1,076 homes on 5 acres, from two property sites that agree). Towers stand close: ask how far your tower is from the next and which flats face another tower.

Tower by tower

2 registrations, 3 buildings

Towers and phases (2 registrations)

From MahaRERA

MahaRERA holds Kohinoor Riverdale as 2 registrations. Together they list 1,076 homes, 672 booked.

RegistrationCompletion filedBooked
KOHINOOR RIVERDALEP52100056021 (opens in a new tab)31 Dec 2028466 of 648
Kohinoor Riverdale - Phase IIP52100079217 (opens in a new tab)30 Apr 2029at registration 31 Dec 2028206 of 428

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
TOWER A1282160
TOWER A2282160
TOWER A3282160

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 27 floors
Land
5 acres

Last checked 20 Nov 2026. MahaRERA counts where they differ.

Kohinoor Group: track record

From MahaRERA records

Kohinoor Group has 36 projects in our MahaRERA register for Pune. 11 of 36 with both dates moved the completion date 3 months or more later, by 24 months on average.

All 36 projects by Kohinoor Group in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Kharadi

More by Intofinity Promoters Private Limited

FAQ

What is the price of Kohinoor Riverdale?

A local agent quotes from ₹97.5 L for Kohinoor Riverdale. Prices change often: ask for today's price and what it includes.

What is the possession date of Kohinoor Riverdale?

The 2 MahaRERA registrations of Kohinoor Riverdale have filed completion dates from 31 Dec 2028 to 30 Apr 2029. For P52100056021: The completion date filed with MahaRERA is 31 Dec 2028.

What is the MahaRERA number of Kohinoor Riverdale?

Kohinoor Riverdale is registered with MahaRERA in 2 parts (towers or phases): P52100056021, P52100079217.

How many towers and floors does Kohinoor Riverdale have?

MahaRERA lists 3 buildings in registration P52100056021, one of the project's 2, the tallest with 28 floors.

How many flats are there in Kohinoor Riverdale?

MahaRERA lists 1076 units across all 2 of its MahaRERA registrations; P52100056021 has 648.

How many homes in Kohinoor Riverdale are booked?

672 of 1076 homes were booked as per MahaRERA on 20 Nov 2026, across all 2 of its MahaRERA registrations.

Who is the builder of Kohinoor Riverdale?

The promoter registered with MahaRERA is Intofinity Promoters Private Limited. Our register has 36 Pune projects by Kohinoor Group; 11 of 36 with both dates moved their completion date 3 months or more later.

Where is Kohinoor Riverdale?

Kohinoor Riverdale is in Kharadi, Pune (pincode 412207).

Which school is nearest to Kohinoor Riverdale?

The Orbis School, Keshav Nagar, Pune (CBSE), about 2.4 km away in a straight line from the map position; the drive is longer.

How far is Kohinoor Riverdale from Pune Airport?

About 7.4 km in a straight line from the map position; the drive is longer.

How far is Kohinoor Riverdale from EON IT Park, Kharadi?

About 2.2 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Kohinoor Riverdale.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 7 Aug 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 20 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 20 Nov 2026

  • Location and nearbyGathered and checked

    Checked 20 Nov 2026

  • DescriptionGathered and checked

    Checked 20 Nov 2026

  • PriceGathered and checked

    The agent's price sheet (20 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (20 Nov 2026)

Get the price sheet and floor plans for KOHINOOR RIVERDALE

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment