Kumar Parc Residences - A2 from space, 2023 to 2026
Satellite imagery for Kumar Parc Residences - A2 shows consistent ground features and existing structures within the ring since 2021, with slight post-registration activity following March 2024.
12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Final quarter shows stable ground conditions matching earlier periods.
- Apr–May 2026Site conditions continue without major new visible structures.
- Jan–Mar 2026Little change in vegetation and surrounding structures.
- Oct–Dec 2025Ground details remain consistent with previous quarters.
- Apr–May 2025Little change observed across the project footprint.
- Jan–Mar 2025Plant cover shows minor fluctuation while structure footprints remain.
- Oct–Dec 2024Slight modifications visible near the ring boundaries.
- Apr–May 2024Little change as the site layout holds steady.
- Jan–Mar 2024Work shows after the Mar 2024 registration with minor ground alterations.
- Oct–Dec 2023Little change in the ring as surrounding development persists.
- Apr–May 2023Site remains largely unchanged with existing surrounding buildings visible.
- Jan–Mar 2023Ground appearance is stable with minimal variation in vegetative cover.
Kumar Parc Residences - A2: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.