MahaRERA registered P52100055344Verify on MahaRERA (opens in a new tab)Mid stage

Kumar Parc Residences - A2, Hadapsar

See the site from above today

by Kumar Properties Infratech Developers Pvt Ltd · Hadapsar, Haveli, Pune district · 411028

Possession
Sep 2028
completion filed with MahaRERA
Booked
326 of 360

What stands out

As of 20 Nov 2026, from MahaRERA and the sources below.

  • 91% of homes booked: MahaRERA shows 326 of 360 homes booked.
  • Buildings in this registration: 3, up to 32 floors.
  • 91% booked here; the middle of 16 Hadapsar projects registered within a year of it is 49%.
  • Compared with other projects still being built in Hadapsar: Compared with other projects still being built in Hadapsar: its tallest building is higher than that of 26 of 32.
  • Completion date filed with MahaRERA: 25 Sep 2028.

Updated 21 Nov 2026

Our team is still collecting details on Kumar Parc Residences - A2.

We do not have prices, the builder's pictures and floor plans yet. What you see here is what we have now: MahaRERA's record, read on the date shown. Ask us and we send you what we find first.

Ask for the detailsOther new projects we are reading

Price

Rough price guide for Kumar Parc Residences - A2

  • 2 BHK about ₹1.1 – 1.4 Cr
  • 3 BHK about ₹1.6 – 1.9 Cr

Our own rounded guide, checked against the area on 21 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

What new homes in Hadapsar usually ask

  • 2 BHK about ₹60 L – ₹1.2 Cr (11 projects)
  • 3 BHK about ₹1.1 – 1.5 Cr (7 projects)
  • 4 BHK about ₹1.7 – 3.25 Cr (3 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Hadapsar, rounded. Use it to judge an offer, not as a price.

Get the exact price for your home

The Avasetu team gets you the current price sheet for the size you want, with parking and all other charges.

Ask for the current offer

Kumar Parc Residences - A2 from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Kumar Parc Residences - A2, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Mar 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Kumar Parc Residences - A2 from above, satellite picture of Nov 2022
    Nov 2022
  2. Kumar Parc Residences - A2 from above, satellite picture of Jan 2024
    Jan 2024
  3. Kumar Parc Residences - A2 from above, satellite picture of Mar 2025
    Mar 2025
  4. Kumar Parc Residences - A2 from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Final quarter shows stable ground conditions matching earlier periods.

Registered with MahaRERA Mar 2024 · possession filed for Sep 2028

Season by season, Jan 2023 to Oct 2026: 12 seasons, October to May (the monsoon is under cloud).

Satellite imagery for Kumar Parc Residences - A2 shows consistent ground features and existing structures within the ring since 2021, with slight post-registration activity following March 2024.

The seasons before

  1. Apr–May 2026Site conditions continue without major new visible structures.
  2. Jan–Mar 2026Little change in vegetation and surrounding structures.
  3. Oct–Dec 2025Ground details remain consistent with previous quarters.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2 (8 earlier seasons)
  1. Apr–May 2025Little change observed across the project footprint.
  2. Jan–Mar 2025Plant cover shows minor fluctuation while structure footprints remain.
  3. Oct–Dec 2024Slight modifications visible near the ring boundaries.
  4. Apr–May 2024Little change as the site layout holds steady.
  5. Jan–Mar 2024Work shows after the Mar 2024 registration with minor ground alterations.
  6. Oct–Dec 2023Little change in the ring as surrounding development persists.
  7. Apr–May 2023Site remains largely unchanged with existing surrounding buildings visible.
  8. Jan–Mar 2023Ground appearance is stable with minimal variation in vegetative cover.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Magarpatta City0.8 km
  • World Trade Center, Kharadi3.9 km
  • EON IT Park, Kharadi4.1 km
  • Pune Railway Station6.5 km

Nearby

  • ShoppingAmanora Mall0.1 km
  • ShoppingSeasons Mall0.3 km
  • Railway stationHadapsar1.1 km
  • Bus standHadapsar Gadital2.2 km
  • Shopping93 AVENUE3.3 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Project facts

  • The project offers 2 and 3 BHK flats.

Last checked 21 Nov 2026.

MahaRERA record

From MahaRERA, read 20 Nov 2026

Possession date

25 Sep 2028

The completion date filed with MahaRERA is 25 Sep 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 25 May 2028.

Beside other Hadapsar projects

Worked out by Avasetu
Homes booked
91%
The middle of 16 Hadapsar projects registered within a year of it: 49%.
Completion date
Not moved by the builder
17 of 77 Hadapsar projects being built moved theirs 3 months or more.

From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
326 of 360
Towers
3 in this registration
The tallest has 32 floors.
Registered on
18 Mar 2024
MahaRERA registration
P52100055344
Listed or updated on MahaRERA 28 Apr 2026.
Promoter (builder)
Kumar Properties Infratech Developers Pvt Ltd
Project type
Residential / Group Housing
Pincode
411028

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Towers go up to 32 floors. Ask how many lifts serve your tower and how many homes share them.

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
A2 - A wing321200
A2 - B wing321200
A2 - C wing321200

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 30 floors

Last checked 21 Nov 2026. MahaRERA counts where they differ.

Kumar Properties Infratech Developers Pvt Ltd: track record

From MahaRERA records

Kumar Properties Infratech Developers Pvt Ltd has 5 projects in our MahaRERA register for Pune. 1 of 5 with both dates moved the completion date 3 months or more later, by 8 months on average.

All 5 projects by Kumar Properties Infratech Developers Pvt Ltd in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Hadapsar

More by Kumar Properties Infratech Developers Pvt Ltd

FAQ

What is the price of Kumar Parc Residences - A2?

No price for Kumar Parc Residences - A2 is published yet. Ask through the enquiry form on this page for the current price.

What is the possession date of Kumar Parc Residences - A2?

The completion date filed with MahaRERA is 25 Sep 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Kumar Parc Residences - A2?

Kumar Parc Residences - A2 is registered with MahaRERA as P52100055344.

How many towers and floors does Kumar Parc Residences - A2 have?

MahaRERA lists 3 buildings, the tallest with 32 floors.

How many flats are there in Kumar Parc Residences - A2?

MahaRERA lists 360 units.

How many homes in Kumar Parc Residences - A2 are booked?

326 of 360 homes were booked as per MahaRERA on 20 Nov 2026.

Who is the builder of Kumar Parc Residences - A2?

The promoter registered with MahaRERA is Kumar Properties Infratech Developers Pvt Ltd. Our register has 5 Pune projects by Kumar Properties Infratech Developers Pvt Ltd; 1 of 5 with both dates moved their completion date 3 months or more later.

Where is Kumar Parc Residences - A2?

Kumar Parc Residences - A2 is in 411028, Haveli, Pune district (pincode 411028).

Which railway station is nearest to Kumar Parc Residences - A2?

Hadapsar, about 1.1 km away in a straight line from the map position; the drive is longer.

How far is Kumar Parc Residences - A2 from Magarpatta City?

About 0.8 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Kumar Parc Residences - A2.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 28 Apr 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 21 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 9 Nov 2026

  • Location and nearbyGathered and checked

    Checked 21 Nov 2026

  • DescriptionGathered and checked

    Checked 21 Nov 2026

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (21 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (21 Nov 2026)

Get the price sheet and floor plans for Kumar Parc Residences - A2

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment