Skip to main contentSkip to navigation
Landmarc, from the builder's websiteSaheel Buildvision Private Limited logo
The builder's picture
MahaRERA registered PM1260002500142Verify on MahaRERA (opens in a new tab)Early stage

Landmarc, Hinjawadi

See the site from above today

by Saheel Buildvision Private Limited · Hinjawadi, Mulshi, Pune district · 411057

Price
from ₹74 L
EMI about ₹51,375 a month
Possession
Oct 2030
completion filed with MahaRERA
Booked
384 of 640
12 booked in the last 30 days

What stands out

As of 20 Nov 2026, from MahaRERA and the sources below.

  • 78% booked: Buyers have booked 372 of 476 homes here, while similar projects are at about 13%.
  • Part of a bigger project: This registration has 476 homes out of 609 for the whole project, so which part is being bought.

Updated 21 Nov 2026

Pictures

Landmarc, from the builder's website
Landmarc, from the builder's website
Landmarc, from the builder's website
Landmarc, from the builder's website
Landmarc, from the builder's website
Landmarc, from the builder's website
Landmarc, from the builder's website

From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Price

  • Homes

    From ₹74 L

    Last checked 10 Nov 2026

    All-in cost of a home at ₹74 L: about ₹83.18 L
    Price (agreement value)₹74 L
    GST (5%)₹3.7 L
    Stamp duty (7%)₹5.18 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹83.18 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹51,375 a monthOn a ₹59.2 L loan (80% of ₹74 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Hinjawadi usually ask

  • 1 BHK about ₹70 – 85 L (4 projects)
  • 2 BHK about ₹75 L – ₹1.1 Cr (45 projects)
  • 2.5 BHK about ₹85 L – ₹1.4 Cr (4 projects)
  • 3 BHK about ₹1 – 1.6 Cr (44 projects)
  • 3.5 BHK about ₹1.6 – 2.1 Cr (6 projects)
  • 4 BHK about ₹1.9 – 2.7 Cr (14 projects)
  • 4.5 BHK about ₹1.8 – 2.2 Cr (5 projects)
  • 5 BHK about ₹2.1 – 2.7 Cr (4 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Hinjawadi, rounded. Use it to judge an offer, not as a price.

Hinjawadi average ₹11,462/sq ft across 21 projectsThe middle asking price per sq ft of other projects in Hinjawadi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Landmarc from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Landmarc, year by year, up close

Sharp satellite pictures taken in Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Landmarc from above, satellite picture of Jan 2024
    Jan 2024
  2. Landmarc from above, satellite picture of Feb 2025
    Feb 2025
  3. Landmarc from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Little change, construction footprint maintained within the ring.

Registered with MahaRERA Jun 2025 · possession filed for Oct 2030

Season by season, Jan 2024 to Oct 2026: 9 seasons, October to May (the monsoon is under cloud).

Registered with MahaRERA in Jun 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

The seasons before

  1. Apr–May 2026Little change, building structures and shadows remain visible.
  2. Jan–Mar 2026Tall building shadows cast northwest, showing construction activity after registration.
  3. Oct–Dec 2025New building footprints and shadows appear after the June 2025 registration.
Construction proof from space: Jan 2024 to Oct 2026, Copernicus Sentinel-2 (5 earlier seasons)
  1. Apr–May 2025Little change, bare soil visible inside the ring area.
  2. Jan–Mar 2025Little change, ground clearing visible near the registration timeline.
  3. Oct–Dec 2024Little change, vegetation remains consistent within the ring.
  4. Apr–May 2024Little change, dry soil and sparse vegetation inside the ring.
  5. Jan–Mar 2024Little change, site remains largely undeveloped with trees.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)5.6 km
  • Baner-Balewadi High Street9.2 km
  • Pune Railway Station20.5 km
  • Pune Airport (Lohegaon)23.4 km

Nearby

  • Industrial areaRajiv Gandhi Infotech Park, Maan Phase-30.1 km
  • Railway stationMaan MIDC Circle - Phase 21 km
  • Industrial areaInternational Tech Park Pune1.6 km
  • TempleMaandevi Mandir2.3 km
  • Railway stationHinjawadi Phase 2 Circle 13.8 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Project facts

Amenities

  • CCTV surveillance is installed for security.

Last checked 8 Nov 2026.

MahaRERA record

From MahaRERA, read 20 Nov 2026

Possession date

30 Oct 2030

The completion date filed with MahaRERA is 30 Oct 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Jun 2030.

Landmarc: what changed, as we read it

12 more homes booked between 21 Oct 2026 and 20 Nov 2026: 372 to 384, of 640 homes.

21 Oct 202620 Nov 2026
  • 20 Nov 2026: 384 booked
  • 21 Oct 2026: 372 booked

Completion date filed with MahaRERA

  1. 30 Jun 2030 → 30 Oct 2030, by MahaRERA's August 2026 order for most projects (not the builder); we saw it on 20 Nov 2026

Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.

Beside other Hinjawadi projects

Worked out by Avasetu
Homes booked
60%
The middle of 37 Hinjawadi projects registered within a year of it: 17%.
Completion date
Not moved by the builder
47 of 150 Hinjawadi projects being built moved theirs 3 months or more.

From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
384 of 640
Towers
3 in this registration
The tallest has 33 floors.
Units
640
445 homes, 31 shops or offices.
Registered on
26 Jun 2025
MahaRERA registration
PM1260002500142
Listed or updated on MahaRERA 12 Aug 2026.
Promoter (builder)
Saheel Buildvision Private Limited
Project type
Mixed
Pincode
411057

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA and checked sites
  • About 427 homes per acre (640 homes on 1.5 acres, from the builder's website). Towers stand close: ask how far your tower is from the next and which flats face another tower.
  • Towers go up to 33 floors. Ask how many lifts serve your tower and how many homes share them.
  • 31 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
Landmarc, I TREND TOWER – I123914
Landmarc, I TREND TOWER – II332038
Landmarc, I TREND TOWER – III332039

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 30 floors
From the builder's site
Land
1.5 acres
From the builder's site

Last checked 8 Nov 2026. MahaRERA counts where they differ.

Saheel Buildvision Private Limited: track record

From MahaRERA records

Saheel Buildvision Private Limited has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Hinjawadi

FAQ

What is the price of Landmarc?

Homes from ₹74 L, checked on 10 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Landmarc?

The completion date filed with MahaRERA is 30 Oct 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Landmarc?

Landmarc is registered with MahaRERA as PM1260002500142.

How many towers and floors does Landmarc have?

MahaRERA lists 3 buildings, the tallest with 33 floors.

How many flats are there in Landmarc?

MahaRERA lists 640 units (445 residential, 31 other).

How many homes in Landmarc are booked?

384 of 640 homes were booked as per MahaRERA on 20 Nov 2026.

Who is the builder of Landmarc?

The promoter registered with MahaRERA is Saheel Buildvision Private Limited.

Where is Landmarc?

Landmarc is in Mulshi, Pune district (pincode 411057).

Which railway station is nearest to Landmarc?

Maan MIDC Circle - Phase 2, about 1 km away in a straight line from the map position; the drive is longer.

How far is Landmarc from Pune Airport?

About 23.4 km in a straight line from the map position; the drive is longer.

How far is Landmarc from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 5.6 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Landmarc.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 12 Aug 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 8 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 8 Nov 2026

  • Location and nearbyGathered and checked

    Checked 8 Nov 2026

  • DescriptionGathered and checked

    Checked 8 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (10 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (8 Nov 2026)

Get the price sheet and floor plans for Landmarc

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment