Landmarc from space, 2024 to 2026
Registered with MahaRERA in Jun 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.
9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Little change, construction footprint maintained within the ring.
- Apr–May 2026Little change, building structures and shadows remain visible.
- Jan–Mar 2026Tall building shadows cast northwest, showing construction activity after registration.
- Oct–Dec 2025New building footprints and shadows appear after the June 2025 registration.
- Apr–May 2025Little change, bare soil visible inside the ring area.
- Jan–Mar 2025Little change, ground clearing visible near the registration timeline.
- Oct–Dec 2024Little change, vegetation remains consistent within the ring.
- Apr–May 2024Little change, dry soil and sparse vegetation inside the ring.
- Jan–Mar 2024Little change, site remains largely undeveloped with trees.
Landmarc: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.