Skip to main contentSkip to navigation
MahaRERA registered P52100076784Verify on MahaRERA (opens in a new tab)Mid stage

Millennium Samriddhi, Tathawade

Sold as Punawale by 5 property sites; we list it under Tathawade (pincode 411033).

See the site from above today

by Millennium Strategic Promoters LLP · Tathawade, Mulshi, Pune district · 411033

Homes
2, 3 BHK
Price
from ₹84.83 L
EMI about ₹58,894 a month
Possession
Apr 2030
completion filed with MahaRERA
Booked
125 of 376

What stands out

As of 19 Nov 2026, from MahaRERA and the sources below.

  • This registration has more homes than 170 of 224 other projects in the area, with 376 homes in 3 buildings.
  • Similar projects are at about 40%, this project is 33% booked, with 125 of 376 homes booked.

Updated 22 Nov 2026

Price

  • 2 BHK

    ₹84.83 L – ₹1.15 Cr

    Last checked 20 Nov 2026

    All-in cost of the 2 BHK at ₹84.83 L: about ₹95.31 L
    Price (agreement value)₹84.83 L
    GST (5%)₹4.24 L
    Stamp duty (7%)₹5.94 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹95.31 L
  • 3 BHK

    ₹1.13 Cr – ₹1.28 Cr

    from 1,200 sq ft · ₹9,417/sq ft

    Last checked 20 Nov 2026

    All-in cost of the 3 BHK at ₹1.13 Cr: about ₹1.27 Cr
    Price (agreement value)₹1.13 Cr
    GST (5%)₹5.65 L
    Stamp duty (7%)₹7.91 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.27 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹58,894 a monthOn a ₹67.86 L loan (80% of ₹84.83 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Tathawade usually ask

  • 2 BHK about ₹70 – 90 L (38 projects)
  • 2.5 BHK about ₹90 L – ₹1.1 Cr (4 projects)
  • 3 BHK about ₹90 L – ₹1.3 Cr (37 projects)
  • 4 BHK about ₹1.3 – 2 Cr (7 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.

Tathawade average ₹10,874/sq ft across 18 projectsThe middle asking price per sq ft of other projects in Tathawade.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Millennium Samriddhi from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Millennium Samriddhi, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Millennium Samriddhi from above, satellite picture of Nov 2022
    Nov 2022
  2. Millennium Samriddhi from above, satellite picture of Jan 2024
    Jan 2024
  3. Millennium Samriddhi from above, satellite picture of Feb 2025
    Feb 2025
  4. Millennium Samriddhi from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Jan–Mar 2025 (looked Nov 2026)

Shadows emerge adjacent to the cleared patch west of the linear corridor.

Registered with MahaRERA Jun 2024 · possession filed for Apr 2030

Season by season, Jan 2023 to Oct 2026: 12 seasons, October to May (the monsoon is under cloud).

The ring is bisected by a prominent diagonal elevated corridor. Ground clearing and structural footprint shadows appeared west of the corridor following the June 2024 registration.

The seasons before

  1. Oct–Dec 2024A bright cleared patch appears on the west side within the ring.
  2. Jan–Mar 2023A diagonal linear transit corridor cuts through built-up and vegetated parcels.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)5.1 km
  • Baner-Balewadi High Street8.3 km
  • Pune Railway Station18.6 km
  • Pune Airport (Lohegaon)19 km

Nearby

  • SchoolS.B. Patil Public School (SBPPS) Ravet, Pune1.9 km
  • CollegeD.Y. Patil College of Engineering2.1 km
  • ShoppingD Mart Ravet2.1 km
  • CollegeD. Y. Patil International University2.3 km
  • TempleISKCON (Shree Govinda Dham) Ravet2.4 km

Straight-line distances; the drive is longer. Places: Google Maps.

Amenities

  • Dedicated car parking for residents.

Last checked 20 Nov 2026.

MahaRERA record

From MahaRERA, read 19 Nov 2026

Possession date

30 Apr 2030

The completion date filed with MahaRERA is 30 Apr 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2029.

Beside other Tathawade projects

Worked out by Avasetu
Homes booked
33%
The middle of 95 Tathawade projects registered within a year of it: 40%.
Completion date
Not moved by the builder
53 of 233 Tathawade projects being built moved theirs 3 months or more.

From MahaRERA records read 19 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
125 of 376
Towers
3 in this registration
The tallest has 21 floors.
Units
376
367 homes, 9 shops or offices.
Registered on
28 Jun 2024
MahaRERA registration
P52100076784
Listed or updated on MahaRERA 29 Oct 2026.
Promoter (builder)
Millennium Strategic Promoters LLP
Project type
Residential / Group Housing
Pincode
411033

Open the MahaRERA record (opens in a new tab)

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
A- Wing211119
B - Wing211450
C- Wing211110

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
3 acres

Last checked 20 Nov 2026. MahaRERA counts where they differ.

Millennium Strategic Promoters LLP: track record

From MahaRERA records

Millennium Strategic Promoters LLP has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Tathawade

FAQ

What is the price of Millennium Samriddhi?

2 BHK: ₹84.83 L to ₹1.15 Cr; 3 BHK: ₹1.13 Cr to ₹1.28 Cr, checked on 20 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Millennium Samriddhi?

The completion date filed with MahaRERA is 30 Apr 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Millennium Samriddhi?

Millennium Samriddhi is registered with MahaRERA as P52100076784.

How many towers and floors does Millennium Samriddhi have?

MahaRERA lists 3 buildings, the tallest with 21 floors.

How many flats are there in Millennium Samriddhi?

MahaRERA lists 376 units (367 residential, 9 other).

How many homes in Millennium Samriddhi are booked?

125 of 376 homes were booked as per MahaRERA on 19 Nov 2026.

Who is the builder of Millennium Samriddhi?

The promoter registered with MahaRERA is Millennium Strategic Promoters LLP.

Where is Millennium Samriddhi?

Millennium Samriddhi is in 411033, Mulshi, Pune district (pincode 411033).

Which school is nearest to Millennium Samriddhi?

S.B. Patil Public School (SBPPS) Ravet, Pune, about 1.9 km away in a straight line from the map position; the drive is longer.

How far is Millennium Samriddhi from Pune Airport?

About 19 km in a straight line from the map position; the drive is longer.

How far is Millennium Samriddhi from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 5.1 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Millennium Samriddhi.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 29 Oct 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 20 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 9 Nov 2026

  • Location and nearbyGathered and checked

    Checked 20 Nov 2026

  • DescriptionGathered and checked

    Checked 20 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (20 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (20 Nov 2026)

Get the price sheet and floor plans for Millennium Samriddhi

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment