One Aretha from space, 2023 to 2026
The site shows existing urban structures and roads initially, with ground clearing and minor footprint changes appearing following the Jan 2024 registration for Phase 1 and subsequent 2026 filings. Overall, the area exhibits gradual development activity.
12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Work shows after recent registrations; minor ground alterations near the ring.
- Apr–May 2026Little change, dry conditions continue across the site.
- Jan–Mar 2026Little change, structures remain consistent within the ring.
- Oct–Dec 2025Little change, seasonal vegetation appears near the perimeter.
- Apr–May 2025Little change, dry ground persists across the area.
- Jan–Mar 2025Little change, site layout shows stable boundaries.
- Oct–Dec 2024Little change, existing structures and cleared patches remain visible.
- Apr–May 2024Little change, ground work continues around the registered site.
- Jan–Mar 2024Work shows after the Jan 2024 registration; new footprint alterations appear.
- Oct–Dec 2023Little change, minor seasonal vegetation shifts observed.
- Apr–May 2023Little change, ground conditions remain dry and static.
- Jan–Mar 2023Little change, existing layout remains stable.
One Aretha: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.