Skip to main contentSkip to navigation
MahaRERA registered P52100054352Verify on MahaRERA (opens in a new tab)

One Aretha, Lohegaon

Filed on MahaRERA as ONE ARETHA PHASE 1

Sold as Dhanori by 9 property sites; we list it under Lohegaon (pincode 411015).

See the site from above today

by Triaa Landmarks LLP · Lohegaon, Pune · 411015

Homes
3, 4 BHK
Price
from ₹1.22 Cr
EMI about ₹84,700 a month
Possession
Apr 2029
completion filed with MahaRERA
Booked
173 of 398
across all 2 of its MahaRERA registrations

What stands out

As of 27 Nov 2026, from MahaRERA and the sources below.

  • 47% of homes booked: Buyers have committed to 173 of the 370 homes in this phase. Across the entire two-registration development, 173 of 398 homes are taken.
  • The finish date registered with MahaRERA is 30 Apr 2029, up from 31 Dec 2028 because MahaRERA's order added the months.
  • No clubhouse provided: This phase spreads 370 homes across 4 acres, but it does not include a clubhouse for residents.

Updated 26 Nov 2026

Price

  • 3 BHK

    ₹1.22 Cr – ₹1.36 Cr

    from 1,131 sq ft · ₹10,787/sq ft

    Last checked 26 Nov 2026

    All-in cost of the 3 BHK at ₹1.22 Cr: about ₹1.37 Cr
    Price (agreement value)₹1.22 Cr
    GST (5%)₹6.1 L
    Stamp duty (7%)₹8.54 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.37 Cr
  • 4 BHK

    ₹1.4 Cr – ₹1.69 Cr

    from 1,369 sq ft · ₹10,226/sq ft

    Last checked 26 Nov 2026

    All-in cost of the 4 BHK at ₹1.4 Cr: about ₹1.57 Cr
    Price (agreement value)₹1.4 Cr
    GST (5%)₹7 L
    Stamp duty (7%)₹9.8 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.57 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹84,700 a monthOn a ₹97.6 L loan (80% of ₹1.22 Cr) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for One Aretha

  • 2.5 BHK about ₹90 L – ₹1.1 Cr

Our own rounded guide, checked against the area on 26 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

What new homes in Lohegaon usually ask

  • 1 BHK about ₹20 – 40 L (3 projects)
  • 2 BHK about ₹55 – 85 L (26 projects)
  • 2.5 BHK about ₹85 L – ₹1 Cr (5 projects)
  • 3 BHK about ₹80 L – ₹1.1 Cr (16 projects)
  • 4 BHK about ₹1.4 – 2 Cr (4 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Lohegaon, rounded. Use it to judge an offer, not as a price.

Lohegaon average ₹9,066/sq ft across 14 projectsThe middle asking price per sq ft of other projects in Lohegaon.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

One Aretha from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

One Aretha, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Mar 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. One Aretha from above, satellite picture of Nov 2022
    Nov 2022
  2. One Aretha from above, satellite picture of Jan 2024
    Jan 2024
  3. One Aretha from above, satellite picture of Mar 2025
    Mar 2025
  4. One Aretha from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Work shows after recent registrations; minor ground alterations near the ring.

Registered with MahaRERA Jan 2024 · possession filed for Apr 2029

Season by season, Jan 2023 to Oct 2026: 12 seasons, October to May (the monsoon is under cloud).

The site shows existing urban structures and roads initially, with ground clearing and minor footprint changes appearing following the Jan 2024 registration for Phase 1 and subsequent 2026 filings. Overall, the area exhibits gradual development activity.

The seasons before

  1. Apr–May 2026Little change, dry conditions continue across the site.
  2. Jan–Mar 2026Little change, structures remain consistent within the ring.
  3. Oct–Dec 2025Little change, seasonal vegetation appears near the perimeter.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2 (8 earlier seasons)
  1. Apr–May 2025Little change, dry ground persists across the area.
  2. Jan–Mar 2025Little change, site layout shows stable boundaries.
  3. Oct–Dec 2024Little change, existing structures and cleared patches remain visible.
  4. Apr–May 2024Little change, ground work continues around the registered site.
  5. Jan–Mar 2024Work shows after the Jan 2024 registration; new footprint alterations appear.
  6. Oct–Dec 2023Little change, minor seasonal vegetation shifts observed.
  7. Apr–May 2023Little change, ground conditions remain dry and static.
  8. Jan–Mar 2023Little change, existing layout remains stable.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.

Open the full timelineMore Pune projects from space

Flat sizes

  • 3 BHK: 1,064 to 1,131 sq ft, carpet area

Your agreement for sale states the final carpet area.

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Pune Airport (Lohegaon)2.2 km
  • World Trade Center, Kharadi7.3 km
  • EON IT Park, Kharadi7.3 km
  • Pune Railway Station7.9 km

Nearby

  • ShoppingAeromall2.3 km
  • CollegeAjeenkya DY Patil University3.1 km
  • Industrial areaCommerzone IT Park, Yerawada4 km
  • ShoppingPhoenix Avenue Of Stars4.3 km
  • Industrial areaE Space Condominium - IT Park4.8 km

Straight-line distances; the drive is longer. Places: Google Maps.

Around One Aretha

Measured from the project's pin, each with its source and date.

ToBy road9 am6 pm, back
Commerzone, Yerwada8.2 km20-34 min21-35 min
Viman Nagar business district (Panchshil Business Park)7.6 km21-36 min24-40 min
Pune Airport (Lohegaon)8 km22 min22 min
World Trade Center, Kharadi10.3 km24-37 min30-51 min
Kalyani Nagar offices (Cerebrum IT Park)9.6 km26-50 min32-59 min

Driving from the project's pin on a weekday, Google's typical traffic. Source: Google Maps (Routes API), typical weekday traffic · measured 28 Nov 2026

What's changing nearby

  • Vishrantwadi flyoverBeing built, with grade separator work expected to finish by December endStatus of 23 Nov 2026
  • Development plan for merged villagesThe revised development plan for nine merged villages makes 143 changes, the most in Lohegaon, and narrows about 50 planned roads, among them the highway at Undri.Status of 10 Nov 2026
  • Water in merged villagesBuilders must supply water in the 32 merged villages for three years or until PMC water supply begins, and PMRDA requires assured water supply before approving a building.Status of 31 Oct 2026
  • Lohegaon hospitalBuilt and staffed, with ambulances ready, but not open: it is still waiting for permission to be inaugurated.Status of 19 Oct 2026

Being built around it

21 projects with 3,394 homes being built within 2 km, due 2027 to 2030.

From MahaRERA's register. Source: MahaRERA project register (our copy, read daily) · measured 28 Nov 2026

6 schools within 3 km: 5 CBSE, 1 ICSE.

Straight-line distance from the project's pin. No fees or ratings: they are rarely published reliably. Sources: CBSE affiliated schools (SARAS), CISCE school locator, Google Maps (school positions) · measured 29 Nov 2026

Asked rent, from 126 listings within 2 km, Nov 2026

SizeA monthMiddleListingsYield
1 BHK₹12,000 to ₹19,000₹16,00037
2 BHK₹22,000 to ₹29,000₹25,000634.8%
3 BHK₹28,000 to ₹33,000₹30,000263.8%

What owners ask on listings, not what tenants pay; the middle half of asks. Yield: a year's middle rent over the middle asking price for that size. Sources: MagicBricks rent listings, NoBroker rent listings, Square Yards rent listings, Asking prices of new projects (Avasetu project pages) · measured 28 Nov 2026

Work nearby

Companies from each hub's own tenant list; straight-line distance. Source: MahaRERA project register (our copy) and each hub's own tenant list · measured 28 Nov 2026

Amenities

  • Rainwater harvesting system installed.
  • Dedicated car parking facilities are available for residents.

Last checked 26 Nov 2026.

MahaRERA record

From MahaRERA, read 27 Nov 2026

Possession date

30 Apr 2029

For P52100054352: 30 Apr 2029. The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2028.

The record

Homes booked
173 of 398
Across all 2 of its MahaRERA registrations. P52100054352 alone: 173 of 370.
Towers
3 in this registration
The tallest has 20 floors.
Units
370
354 homes, 16 shops or offices.
Registered on
15 Jan 2024
Main MahaRERA registration
P52100054352
Listed or updated on MahaRERA 19 Oct 2026.
Promoter (builder)
Triaa Landmarks LLP
Project type
Others
Pincode
411015

Open the MahaRERA record (opens in a new tab)

Tower by tower

2 registrations, 3 buildings

Towers and phases (2 registrations)

From MahaRERA

MahaRERA holds One Aretha as 2 registrations. Together they list 398 homes, 173 booked.

RegistrationCompletion filedBooked
ONE ARETHA PHASE 1P52100054352 (opens in a new tab)30 Apr 2029at registration 31 Dec 2028173 of 370
ONE ARETHA - DPR1261012601285 (opens in a new tab)30 Apr 2029at registration 31 Dec 20280 of 28

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
Wing A2012216
Wing B201640
Wing C20680

As filed with MahaRERA (sanctioned floors).

Triaa Landmarks LLP: track record

From MahaRERA records

Triaa Landmarks LLP has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Lohegaon

FAQ

What is the price of One Aretha?

3 BHK: ₹1.22 Cr to ₹1.36 Cr; 4 BHK: ₹1.4 Cr to ₹1.69 Cr, checked on 26 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of One Aretha?

The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of One Aretha?

One Aretha is registered with MahaRERA in 2 parts (towers or phases): P52100054352, PR1261012601285.

How many towers and floors does One Aretha have?

MahaRERA lists 3 buildings in registration P52100054352, one of the project's 2, the tallest with 20 floors.

How many flats are there in One Aretha?

MahaRERA lists 398 units across all 2 of its MahaRERA registrations; P52100054352 has 370.

How many homes in One Aretha are booked?

173 of 398 homes were booked as per MahaRERA on 27 Nov 2026, across all 2 of its MahaRERA registrations.

Who is the builder of One Aretha?

The promoter registered with MahaRERA is Triaa Landmarks LLP.

Where is One Aretha?

One Aretha is in Lohegaon, Pune (pincode 411015).

How far is One Aretha from Pune Airport?

About 2.2 km in a straight line from the map position; the drive is longer.

How far is One Aretha from World Trade Center, Kharadi?

About 7.3 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to One Aretha.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 19 Oct 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 26 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 9 Nov 2026

  • Location and nearbyGathered and checked

    Checked 26 Nov 2026

  • DescriptionGathered and checked

    Checked 26 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (26 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (26 Nov 2026)

  • Home sizesGathered and checked

    The builder's site, or two property sites that agree

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (26 Nov 2026)

Get the price sheet and floor plans for One Aretha

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment