Skip to main contentSkip to navigation

Pristine O2 World Part 3 from space, 2024 to 2026

Satellite imagery shows the project location undergoing early site preparation and surrounding development context over the years. Following the January 2025 registration, minor changes appear in structural shadows and footprints near the ring.

Today, from Google satellite, centred on the same map pin.

9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Little change observed at the location as construction context remains steady.
  2. Apr–May 2026Little change, site conditions appear consistent with previous periods.
  3. Jan–Mar 2026Ground remains cleared with shadows cast from nearby tall structures.
  4. Oct–Dec 2025Little change, maintaining the established footprint and surrounding area context.
  5. Apr–May 2025Little change following recent registration activity, ground remains mostly bare.
  6. Jan–Mar 2025Work shows after the Jan 2025 registration with slight changes in shadows and footprints.
  7. Oct–Dec 2024Little change, site condition remains stable with surrounding construction context.
  8. Apr–May 2024Little change observed in ground features and surrounding structures.
  9. Jan–Mar 2024Bare ground and shadows from adjacent buildings persist with minimal vegetation.

Pristine O2 World Part 3: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.