Skip to main contentSkip to navigation
LOGIPARK WAREHOUSING LLP logo
The builder's logo, from pristinedeveloper.com
MahaRERA registered P52100079026Verify on MahaRERA (opens in a new tab)Early stage

Pristine O2 World Part 3, Upper Kharadi

See the site from above today

by Logipark Warehousing LLP · Upper Kharadi, Pune · 412207

Homes
2 BHK
Price
from ₹1.11 Cr
EMI about ₹77,063 a month
Possession
Apr 2030
completion filed with MahaRERA
Booked
168 of 612

What stands out

As of 22 Nov 2026, from MahaRERA and the sources below.

  • Only 27% of homes are booked, while the median for similar Upper Kharadi projects is about 55%.
  • Rainwater harvesting system: The project includes a rainwater harvesting system as a green feature.

Updated 21 Nov 2026

Price

  • 2 BHK

    From ₹1.11 Cr

    Last checked 2 Nov 2026

    All-in cost of the 2 BHK at ₹1.11 Cr: about ₹1.25 Cr
    Price (agreement value)₹1.11 Cr
    GST (5%)₹5.55 L
    Stamp duty (7%)₹7.77 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.25 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹77,063 a monthOn a ₹88.8 L loan (80% of ₹1.11 Cr) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for Pristine O2 World Part 3

  • 2.5 BHK about ₹1.3 – 1.5 Cr
  • 3 BHK about ₹1.5 – 1.7 Cr
  • 3.5 BHK about ₹1.9 – 2.3 Cr
  • 4 BHK about ₹2.3 – 2.7 Cr

Our own rounded guide, checked against the area on 2 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

What new homes in Upper Kharadi usually ask

  • 2 BHK about ₹90 L – ₹1.2 Cr (9 projects)
  • 2.5 BHK about ₹1.2 – 1.4 Cr (4 projects)
  • 3 BHK about ₹1.3 – 1.6 Cr (10 projects)
  • 3.5 BHK about ₹1.9 – 2.7 Cr (6 projects)
  • 4 BHK about ₹2.3 – 3.25 Cr (9 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Upper Kharadi, rounded. Use it to judge an offer, not as a price.

Upper Kharadi average ₹12,354/sq ft across 5 projectsThe middle asking price per sq ft of other projects in Upper Kharadi.

Get the exact price for your home

The Avasetu team gets you the current price sheet for the size you want, with parking and all other charges.

Ask for the current offer

Pristine O2 World Part 3 from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Pristine O2 World Part 3, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Pristine O2 World Part 3 from above, satellite picture of Nov 2022
    Nov 2022
  2. Pristine O2 World Part 3 from above, satellite picture of Jan 2024
    Jan 2024
  3. Pristine O2 World Part 3 from above, satellite picture of Feb 2025
    Feb 2025
  4. Pristine O2 World Part 3 from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Little change observed at the location as construction context remains steady.

Registered with MahaRERA Jan 2025 · possession filed for Apr 2030

Season by season, Jan 2024 to Oct 2026: 9 seasons, October to May (the monsoon is under cloud).

Satellite imagery shows the project location undergoing early site preparation and surrounding development context over the years. Following the January 2025 registration, minor changes appear in structural shadows and footprints near the ring.

The seasons before

  1. Apr–May 2026Little change, site conditions appear consistent with previous periods.
  2. Jan–Mar 2026Ground remains cleared with shadows cast from nearby tall structures.
  3. Oct–Dec 2025Little change, maintaining the established footprint and surrounding area context.
Construction proof from space: Jan 2024 to Oct 2026, Copernicus Sentinel-2 (5 earlier seasons)
  1. Apr–May 2025Little change following recent registration activity, ground remains mostly bare.
  2. Jan–Mar 2025Work shows after the Jan 2025 registration with slight changes in shadows and footprints.
  3. Oct–Dec 2024Little change, site condition remains stable with surrounding construction context.
  4. Apr–May 2024Little change observed in ground features and surrounding structures.
  5. Jan–Mar 2024Bare ground and shadows from adjacent buildings persist with minimal vegetation.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • EON IT Park, Kharadi1.7 km
  • World Trade Center, Kharadi1.9 km
  • Pune Airport (Lohegaon)6.2 km
  • Magarpatta City6.3 km

Nearby

  • Industrial areaInternational Tech Park Pune, Kharadi0.9 km
  • Industrial areaEon IT Park 21.5 km
  • Industrial areaEon IT Park Pune1.6 km
  • CollegeG.H. Raisoni College OF Engineering & Management, PUNE2.4 km
  • TempleWagheshwar Temple2.8 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 22 Nov 2026

Possession date

30 Apr 2030

The completion date filed with MahaRERA is 30 Apr 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2029.

Beside other Upper Kharadi projects

Worked out by Avasetu
Homes booked
27%
The middle of 12 Upper Kharadi projects registered within a year of it: 55%.
Completion date
Not moved by the builder
2 of 21 Upper Kharadi projects being built moved theirs 3 months or more.

From MahaRERA records read 22 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
168 of 612
Towers
3 in this registration
The tallest has 30 floors.
Registered on
31 Jan 2025
MahaRERA registration
P52100079026
Listed or updated on MahaRERA 8 Sep 2026.
Promoter (builder)
Logipark Warehousing LLP
Project type
Residential / Group Housing
Pincode
412207

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Towers go up to 30 floors. Ask how many lifts serve your tower and how many homes share them.

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
TOWER T4292040
TOWER T3302040
TOWER T2302040

As filed with MahaRERA (sanctioned floors).

Logipark Warehousing LLP: track record

From MahaRERA records

Logipark Warehousing LLP has 4 projects in our MahaRERA register for Pune.

All 4 projects by Logipark Warehousing LLP in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Upper Kharadi

More by Logipark Warehousing LLP

FAQ

What is the price of Pristine O2 World Part 3?

2 BHK: ₹1.11 Cr, checked on 2 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Pristine O2 World Part 3?

The completion date filed with MahaRERA is 30 Apr 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Pristine O2 World Part 3?

Pristine O2 World Part 3 is registered with MahaRERA as P52100079026.

How many towers and floors does Pristine O2 World Part 3 have?

MahaRERA lists 3 buildings, the tallest with 30 floors.

How many flats are there in Pristine O2 World Part 3?

MahaRERA lists 612 units.

How many homes in Pristine O2 World Part 3 are booked?

168 of 612 homes were booked as per MahaRERA on 22 Nov 2026.

Who is the builder of Pristine O2 World Part 3?

The promoter registered with MahaRERA is Logipark Warehousing LLP. Our register has 4 Pune projects by Logipark Warehousing LLP.

Where is Pristine O2 World Part 3?

Pristine O2 World Part 3 is in Upper Kharadi, Pune (pincode 412207).

How far is Pristine O2 World Part 3 from Pune Airport?

About 6.2 km in a straight line from the map position; the drive is longer.

How far is Pristine O2 World Part 3 from EON IT Park, Kharadi?

About 1.7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Pristine O2 World Part 3.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 8 Sep 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 18 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 23 Oct 2026

  • Location and nearbyGathered and checked

    Checked 18 Nov 2026

  • DescriptionGathered and checked

    Checked 18 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (2 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (2 Nov 2026)

Get the price sheet and floor plans for PRISTINE O2 WORLD PART 3

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment