The project's position on the map
MahaRERA registered P52100018200Verify on MahaRERA (opens in a new tab)Near completion

Shubh Gateway, Airport Road

See the site from above today

by Shubh Landmarks · Airport Road, Haveli, Pune district · 411032

Homes
4 BHK
Price
from ₹2 Cr
EMI about ₹1.39 L a month
Possession
Apr 2027
completion filed with MahaRERA
Booked
316 of 317
29 booked in the last 30 days

What stands out

As of 19 Nov 2026, from MahaRERA and the sources below.

  • Buyers have already booked 316 of the 317 units in this development, leaving virtually no inventory left.
  • The project includes 4 buildings reaching up to 14 floors, with roughly 79 homes per tower.
  • Unit pricing starts from ₹2 Cr for a 4 BHK flat.

Updated 22 Nov 2026

Our team is still collecting details on Shubh Gateway.

We do not have the builder's pictures and floor plans yet. What you see here is what we have now: MahaRERA's record, read on the date shown. Ask us and we send you what we find first.

Ask for the detailsOther new projects we are reading

Price

  • 4 BHK

    From ₹2 Cr

    Last checked 21 Nov 2026

    All-in cost of the 4 BHK at ₹2 Cr: about ₹2.24 Cr
    Price (agreement value)₹2 Cr
    GST (5%)₹10 L
    Stamp duty (7%)₹14 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹2.24 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹1.39 L a monthOn a ₹1.6 Cr loan (80% of ₹2 Cr) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for Shubh Gateway

  • 2 BHK about ₹85 L – ₹1 Cr
  • 3 BHK about ₹2.1 – 2.4 Cr

Our own rounded guide, checked against the area on 21 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Shubh Gateway from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Shubh Gateway, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Mar 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Shubh Gateway from above, satellite picture of Nov 2022
    Nov 2022
  2. Shubh Gateway from above, satellite picture of Jan 2024
    Jan 2024
  3. Shubh Gateway from above, satellite picture of Mar 2025
    Mar 2025
  4. Shubh Gateway from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Jan–Mar 2025 (looked Nov 2026)

Ground just northwest of the ring shows new cleared structures and light surfaces.

Registered with MahaRERA Oct 2018 · possession filed for Apr 2027

Season by season, Jan 2021 to Oct 2026: 18 seasons, October to May (the monsoon is under cloud).

From 2021 to 2026, building footprints within the ring evolved into defined multi-sided structures casting deep shadows, following the October 2018 registration. Surrounding plots saw minor clearing and adjacent development.

The seasons before

  1. Jan–Mar 2024Building blocks in the ring show sharp outlines with large dark shadow coverage.
  2. Oct–Dec 2023Building roof surfaces appear more consolidated compared to late 2022.
  3. Jan–Mar 2023Central building form shows an enclosed hollow shape casting broad northern shadows.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (4 earlier seasons)
  1. Oct–Dec 2022Structure just south within the ring becomes brighter with prominent northern shadows.
  2. Jan–Mar 2022Structure casts a longer shadow northwards compared to the previous year.
  3. Oct–Dec 2021Central footprint in the ring shows clearer defined edges and deepening dark shadow.
  4. Jan–Mar 2021Structure footprints and excavated ground visible along an access road inside the ring.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Pune Airport (Lohegaon)0.5 km
  • World Trade Center, Kharadi5.1 km
  • EON IT Park, Kharadi5.2 km
  • Pune Railway Station6.2 km

Nearby

  • ShoppingPhoenix Avenue Of Stars1.8 km
  • Industrial areaE Space Condominium - IT Park2.4 km
  • SchoolThe Bishop's Co-Ed School2.6 km
  • Industrial areaCommerzone IT Park, Yerawada2.7 km
  • Industrial areaCerebrum IT Park - B33.5 km

Straight-line distances; the drive is longer. Places: Google Maps.

Amenities

Last checked 21 Nov 2026.

MahaRERA record

From MahaRERA, read 19 Nov 2026

Possession date

30 Apr 2027

The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Dec 2026.

Shubh Gateway: what changed, as we read it

29 more homes booked between 20 Oct 2026 and 19 Nov 2026: 287 to 316, of 317 homes.

20 Oct 202619 Nov 2026
  • 19 Nov 2026: 316 booked
  • 20 Oct 2026: 287 booked

Completion date filed with MahaRERA

  1. 30 Dec 2026 → 30 Apr 2027, by MahaRERA's August 2026 order for most projects (not the builder); we saw it on 19 Nov 2026

Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.

The record

Homes booked
316 of 317
Towers
4 in this registration
The tallest has 14 floors.
Units
317
255 homes, 62 shops or offices.
Registered on
15 Oct 2018
MahaRERA registration
P52100018200
Listed or updated on MahaRERA 5 Sep 2026.
Promoter (builder)
Shubh Landmarks
Project type
Mixed
Pincode
411032

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • 62 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

4 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
A Wing146418
B Wing146228
C Wing146316
D Wing14660

As filed with MahaRERA (sanctioned floors).

Shubh Landmarks: track record

From MahaRERA records

Shubh Landmarks has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Airport Road

FAQ

What is the price of Shubh Gateway?

4 BHK: ₹2 Cr, checked on 21 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Shubh Gateway?

The completion date filed with MahaRERA is 30 Apr 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Shubh Gateway?

Shubh Gateway is registered with MahaRERA as P52100018200.

How many towers and floors does Shubh Gateway have?

MahaRERA lists 4 buildings, the tallest with 14 floors.

How many flats are there in Shubh Gateway?

MahaRERA lists 317 units (255 residential, 62 other).

How many homes in Shubh Gateway are booked?

316 of 317 homes were booked as per MahaRERA on 19 Nov 2026.

Who is the builder of Shubh Gateway?

The promoter registered with MahaRERA is Shubh Landmarks.

Where is Shubh Gateway?

Shubh Gateway is in Haveli, Pune district (pincode 411032).

Which school is nearest to Shubh Gateway?

The Bishop's Co-Ed School, about 2.6 km away in a straight line from the map position; the drive is longer.

How far is Shubh Gateway from Pune Airport?

About 0.5 km in a straight line from the map position; the drive is longer.

How far is Shubh Gateway from World Trade Center, Kharadi?

About 5.1 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Shubh Gateway.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 5 Sep 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 21 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 21 Nov 2026

  • Location and nearbyGathered and checked

    Checked 21 Nov 2026

  • DescriptionGathered and checked

    Checked 21 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (21 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (21 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (21 Nov 2026)

Get the price sheet and floor plans for SHUBH GATEWAY

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment