Shubh Gateway from space, 2021 to 2026
From 2021 to 2026, building footprints within the ring evolved into defined multi-sided structures casting deep shadows, following the October 2018 registration. Surrounding plots saw minor clearing and adjacent development.
18 seasons, Jan 2021 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Jan–Mar 2025Ground just northwest of the ring shows new cleared structures and light surfaces.
- Jan–Mar 2024Building blocks in the ring show sharp outlines with large dark shadow coverage.
- Oct–Dec 2023Building roof surfaces appear more consolidated compared to late 2022.
- Jan–Mar 2023Central building form shows an enclosed hollow shape casting broad northern shadows.
- Oct–Dec 2022Structure just south within the ring becomes brighter with prominent northern shadows.
- Jan–Mar 2022Structure casts a longer shadow northwards compared to the previous year.
- Oct–Dec 2021Central footprint in the ring shows clearer defined edges and deepening dark shadow.
- Jan–Mar 2021Structure footprints and excavated ground visible along an access road inside the ring.
Shubh Gateway: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.