Skip to main contentSkip to navigation

Shubh Gateway from space, 2021 to 2026

From 2021 to 2026, building footprints within the ring evolved into defined multi-sided structures casting deep shadows, following the October 2018 registration. Surrounding plots saw minor clearing and adjacent development.

Today, from Google satellite, centred on the same map pin.

18 seasons, Jan 2021 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Jan–Mar 2025Ground just northwest of the ring shows new cleared structures and light surfaces.
  2. Jan–Mar 2024Building blocks in the ring show sharp outlines with large dark shadow coverage.
  3. Oct–Dec 2023Building roof surfaces appear more consolidated compared to late 2022.
  4. Jan–Mar 2023Central building form shows an enclosed hollow shape casting broad northern shadows.
  5. Oct–Dec 2022Structure just south within the ring becomes brighter with prominent northern shadows.
  6. Jan–Mar 2022Structure casts a longer shadow northwards compared to the previous year.
  7. Oct–Dec 2021Central footprint in the ring shows clearer defined edges and deepening dark shadow.
  8. Jan–Mar 2021Structure footprints and excavated ground visible along an access road inside the ring.

Shubh Gateway: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.