Skip to main contentSkip to navigation
Map: where Shubh Veda Akurdi is
The project's position on the map
MahaRERA registered P52100080358Verify on MahaRERA (opens in a new tab)

Shubh Veda Akurdi, Chinchwad

Filed on MahaRERA as SHUBH VEDA Tower E F G and Block 8

Sold as Akurdi by 7 property sites; we list it under Chinchwad (pincode 411019).

See the site from above today

by Upsquare Ventures LLP · Chinchwad, Mawal, Pune district · 411019

Price
from ₹1.5 Cr
EMI about ₹1.04 L a month
Possession
from Aug 2028
its parts filed Aug 2028 to Dec 2030
Booked
254 of 737
48 booked in the last 30 days

What stands out

As of 20 Nov 2026, from MahaRERA and the sources below.

  • 40% of homes booked: Buyers have taken 237 of the 595 units in this phase. Across both registrations, 254 of the 737 homes are booked.
  • This phase contains 4 high-rise towers rising up to 40 floors, with roughly 149 homes per building.
  • The developer has committed to completing this phase by 31 Dec 2030 with MahaRERA.

Updated 22 Nov 2026

Price

  • Homes

    From ₹1.5 Cr

    Last checked 21 Nov 2026

    All-in cost of a home at ₹1.5 Cr: about ₹1.68 Cr
    Price (agreement value)₹1.5 Cr
    GST (5%)₹7.5 L
    Stamp duty (7%)₹10.5 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.68 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹1.04 L a monthOn a ₹1.2 Cr loan (80% of ₹1.5 Cr) at 8.5% for 20 years. Ask your bank for its rate.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Shubh Veda Akurdi from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Shubh Veda Akurdi, year by year, up close

Sharp satellite pictures taken in Jan 2022, Nov 2022, Jan 2024 and Apr 2025, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Shubh Veda Akurdi from above, satellite picture of Jan 2022
    Jan 2022
  2. Shubh Veda Akurdi from above, satellite picture of Nov 2022
    Nov 2022
  3. Shubh Veda Akurdi from above, satellite picture of Jan 2024
    Jan 2024
  4. Shubh Veda Akurdi from above, satellite picture of Apr 2025
    Apr 2025 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Jan–Mar 2026 (looked Nov 2026)

Plants decrease further to 3% as the entire site ground lies cleared.

Registered with MahaRERA Oct 2024 · possession filed for from Aug 2028

Season by season, Jan 2023 to Oct 2026: 12 seasons, October to May (the monsoon is under cloud).

Registered with MahaRERA in May 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

The seasons before

  1. Oct–Dec 2025The cleared land plot remains open adjacent to the diagonal road.
  2. Apr–May 2025Cleared ground remains bare southwest of the road; no new footprints.
  3. Jan–Mar 2025Ground clearing expands; plant cover drops as buildings are removed.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2 (2 earlier seasons)
  1. Oct–Dec 2024Structures southwest of the diagonal road are cleared to bare ground.
  2. Jan–Mar 2023A diagonal road cuts through the ring with buildings and trees alongside.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)8.1 km
  • Baner-Balewadi High Street8.8 km
  • Pune Airport (Lohegaon)15 km
  • Pune Railway Station16.2 km

Nearby

  • TempleKhandoba Mandir0.3 km
  • Railway stationChinchwad Junction1.1 km
  • Bus standNigdi1.6 km
  • SchoolElpro International School1.9 km
  • Bus standChafekar Chowk2.1 km

Straight-line distances; the drive is longer. Places: Google Maps.

MahaRERA record

From MahaRERA, read 20 Nov 2026

Possession date

30 Aug 2028 to 31 Dec 2030

The completion dates filed with MahaRERA for its 2 registrations; each is in the table of towers and phases below.

For P52100080358: 31 Dec 2030. Completion date filed with MahaRERA. Not moved since registration.

Shubh Veda Akurdi: what changed, as we read it

48 more homes booked between 21 Oct 2026 and 20 Nov 2026: 189 to 237, of 595 homes in P52100080358, one of its registrations.

21 Oct 202620 Nov 2026
  • 20 Nov 2026: 237 booked
  • 21 Oct 2026: 189 booked

Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.

The record

Homes booked
254 of 737
Across all 2 of its MahaRERA registrations. P52100080358 alone: 237 of 595.
Towers
4 in this registration
The tallest has 40 floors. 8 in the whole project.
Units
595
565 homes, 30 shops or offices.
Registered on
26 May 2025
Main MahaRERA registration
P52100080358
Listed or updated on MahaRERA 10 Jun 2026.
Promoter (builder)
Upsquare Ventures LLP
Project type
Others
Pincode
411019

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Completion is filed for Dec 2030, about 4 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
  • Towers go up to 40 floors. Ask how many lifts serve your tower and how many homes share them.
  • 30 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

2 registrations, 4 buildings

Towers and phases (2 registrations)

From MahaRERA

MahaRERA holds Shubh Veda Akurdi as 2 registrations. Together they list 737 homes, 254 booked.

RegistrationCompletion filedBooked
SHUBH VEDA Tower E F G and Block 8P52100080358 (opens in a new tab)31 Dec 2030237 of 595
Shubh Veda Block 1,2,3,4,5PC1261012400093 (opens in a new tab)30 Aug 2028at registration 30 Apr 202817 of 142

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
Tower E402600
Tower F401330
Tower G381720
Block 84030

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
13.5 acres

Last checked 21 Nov 2026. MahaRERA counts where they differ.

Upsquare Ventures LLP: track record

From MahaRERA records

Upsquare Ventures LLP has 3 projects in our MahaRERA register for Pune.

All 3 projects by Upsquare Ventures LLP in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Chinchwad

More by Upsquare Ventures LLP

FAQ

What is the price of Shubh Veda Akurdi?

Homes from ₹1.5 Cr, checked on 21 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Shubh Veda Akurdi?

The 2 MahaRERA registrations of Shubh Veda Akurdi have filed completion dates from 30 Aug 2028 to 31 Dec 2030. For P52100080358: The completion date filed with MahaRERA is 31 Dec 2030.

What is the MahaRERA number of Shubh Veda Akurdi?

Shubh Veda Akurdi is registered with MahaRERA in 2 parts (towers or phases): P52100080358, PC1261012400093.

How many towers and floors does Shubh Veda Akurdi have?

MahaRERA lists 4 buildings in registration P52100080358, one of the project's 2, the tallest with 40 floors.

How many flats are there in Shubh Veda Akurdi?

MahaRERA lists 737 units across all 2 of its MahaRERA registrations; P52100080358 has 595.

How many homes in Shubh Veda Akurdi are booked?

254 of 737 homes were booked as per MahaRERA on 20 Nov 2026, across all 2 of its MahaRERA registrations.

Who is the builder of Shubh Veda Akurdi?

The promoter registered with MahaRERA is Upsquare Ventures LLP. Our register has 3 Pune projects by Upsquare Ventures LLP.

Where is Shubh Veda Akurdi?

Shubh Veda Akurdi is in 411019, Mawal, Pune district (pincode 411019).

Which school is nearest to Shubh Veda Akurdi?

Elpro International School, about 1.9 km away in a straight line from the map position; the drive is longer.

Which railway station is nearest to Shubh Veda Akurdi?

Chinchwad Junction, about 1.1 km away in a straight line from the map position; the drive is longer.

How far is Shubh Veda Akurdi from Pune Airport?

About 15 km in a straight line from the map position; the drive is longer.

How far is Shubh Veda Akurdi from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 8.1 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Shubh Veda Akurdi.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 10 Jun 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 21 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 8 Nov 2026

  • Location and nearbyGathered and checked

    Checked 21 Nov 2026

  • DescriptionGathered and checked

    Checked 21 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (21 Nov 2026)

Get the price sheet and floor plans for SHUBH VEDA Tower E F G and Block 8

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment