Shubh Veda Akurdi from space, 2023 to 2026
Registered with MahaRERA in May 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.
12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Jan–Mar 2026Plants decrease further to 3% as the entire site ground lies cleared.
- Oct–Dec 2025The cleared land plot remains open adjacent to the diagonal road.
- Apr–May 2025Cleared ground remains bare southwest of the road; no new footprints.
- Jan–Mar 2025Ground clearing expands; plant cover drops as buildings are removed.
- Oct–Dec 2024Structures southwest of the diagonal road are cleared to bare ground.
- Jan–Mar 2023A diagonal road cuts through the ring with buildings and trees alongside.
Shubh Veda Akurdi: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.