Skip to main contentSkip to navigation

Shubh Veda Akurdi from space, 2023 to 2026

Registered with MahaRERA in May 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

Today, from Google satellite, centred on the same map pin.

12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Jan–Mar 2026Plants decrease further to 3% as the entire site ground lies cleared.
  2. Oct–Dec 2025The cleared land plot remains open adjacent to the diagonal road.
  3. Apr–May 2025Cleared ground remains bare southwest of the road; no new footprints.
  4. Jan–Mar 2025Ground clearing expands; plant cover drops as buildings are removed.
  5. Oct–Dec 2024Structures southwest of the diagonal road are cleared to bare ground.
  6. Jan–Mar 2023A diagonal road cuts through the ring with buildings and trees alongside.

Shubh Veda Akurdi: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.