Signature Ritz from space, 2022 to 2026
Satellite images show the site transitioning from vacant ground to active construction following the July 2023 registration of Signature Ritz, with new building footprints and tall structural shadows appearing over time.
15 seasons, Jan 2022 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Little change, construction footprint visible with tall shadows.
- Apr–May 2026Little change, structures and shadows remain stable.
- Jan–Mar 2026Tall structures cast prominent shadows within and near the ring.
- Oct–Dec 2025Structures show further development with distinct shadows.
- Apr–May 2025Little change, structural footprints remain visible.
- Jan–Mar 2025Dark shadows from growing structures appear to the north.
- Oct–Dec 2024New building footprints and shadows emerge inside the ring.
- Apr–May 2024Little change, ground preparation continues.
- Jan–Mar 2024Initial foundation footprints and clearing appear following registration.
- Oct–Dec 2023Work shows after the Jul 2023 registration with ground disturbance.
- Apr–May 2023Little change, dry ground persists.
- Jan–Mar 2023Vacant ground visible inside the ring with surrounding buildings.
- Oct–Dec 2022Little change, area remains mostly open ground.
- Apr–May 2022Dry vacant ground persists within the ring.
- Jan–Mar 2022Ground remains mostly cleared with low vegetation.
Signature Ritz: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.